09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

J<br />

CONTRACT DATA<br />

ftern: mqrlrad <strong>at</strong>rf/..ll, dn net -Tnr+ ie tbi- Go*tad-<br />

1. The Employer is<br />

Clause Reference<br />

with respect to section 3<br />

[C1.1.1]<br />

Name: chief Errgineer lE,Zl onbehalf of G<strong>over</strong>nor of Arunachal 1>rad.esh<br />

Address: Mowb II Itanagar - Zg1-1-1-1-<br />

Name of authorized Represent<strong>at</strong>ives : l. superintending<br />

PIilD Circle. 2. I to be intlm<strong>at</strong>ed l<strong>at</strong>erl<br />

Engineer, Boleng<br />

2. The Engineer is ; E:recutive Engineer Mariyang Division ptrrD<br />

Name of authorized Represent<strong>at</strong>ives: l. AE & JF-in chergc of worl.<br />

appointed laq<br />

2 fto bc<br />

3. The Dispute Review Expert appointed jointly by the Employer and Contractor [Cl. 1 . 1]<br />

IS:<br />

*Name:<br />

Mt. M.n.Bbaghff<strong>at</strong>i<br />

*Address: GREEN P<strong>at</strong>h, Near s.B. Dewrah college, Ulubari, Bara Service,<br />

Guwah<strong>at</strong>i -701007 Ph: 2S2035o(R) 9R6407a980<br />

4. The Defects Liability Period is 365 days from the d<strong>at</strong>e of completion. [c1.1.1& 3sl<br />

5. The start D<strong>at</strong>e shall be 21 (twenty one) days for the d<strong>at</strong>e of issue of the Notice tcl.1.11<br />

to proceed with the work.<br />

6' The Intended Completion D<strong>at</strong>e for the whole of the Works is 21 {Twenty One) [C1.1.1,12& 2gl<br />

months after start of work with the folowing milestones.<br />

Milestone d<strong>at</strong>es:<br />

Physical works to be completed<br />

Milestone 1 i.e. Completion of Desiga & Drarings,<br />

getting the Design & Drawings proofchecked by<br />

eD I.I.T. or eny other institute of repute and<br />

suhmiscLion to the depertaeaL<br />

Milestone 2 i.e. Completion of sub-stnrcture and<br />

fabric<strong>at</strong>ion & trial assemblying, etc of<br />

componenta of the super-structure <strong>at</strong> work shop<br />

Milestone 3i.e Completion of delivery of fabric<strong>at</strong>ed<br />

components of super structure <strong>at</strong> site of work.<br />

Milestone 4i.e completion of errection of super<br />

structure and all rel<strong>at</strong>ed works & activities ln dl<br />

reslrcct<br />

Milestone Si.e Load testing, defect{sf correction (if<br />

any) & commissioning.<br />

Period from the start d<strong>at</strong>e<br />

l.O (Onef Uonth<br />

9.5O (l{iae and half] Months<br />

l.O (One) Month<br />

g.s (Eight and a halg Months<br />

1 {one} Month<br />

ICr. 2.2 & 49.11<br />

7 " The Site is loc<strong>at</strong>ed <strong>over</strong> <strong>Yamne</strong> <strong>at</strong> Regl<strong>at</strong> (<strong>Bysang</strong>) in Uppe r Sirng District of A-p.<br />

[C 1 . 1 . i I<br />

g. C/o <strong>Motorable</strong> <strong>Steel</strong> <strong>Arch</strong> bridge <strong>over</strong> <strong>river</strong> <strong>Yamne</strong> <strong>at</strong> Regl<strong>at</strong> (Bys*g) Span - 90.00rntr in U14rer<br />

Siaag District of A-P under NICPR<br />

r^ 1 1 r<br />

tu r ' r ' r l<br />

g. T?reworksconsisrsof Sub-structure&Super-Stmctureworks. a,oa{ J"SiVn.<br />

tcl.l.ll<br />

J' T;<br />

I<br />

C=c OW=6 F.=O f:C!-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!