CONTRACT DATA<br />
ftern: mqrlrad <strong>at</strong>rf/..ll, dn net -Tnr+ ie tbi- Go*tad-<br />
1. The Employer is<br />
Clause Reference<br />
with respect to section 3<br />
[C1.1.1]<br />
Name: chief Errgineer lE,Zl onbehalf of G<strong>over</strong>nor of Arunachal 1>rad.esh<br />
Address: Mowb II Itanagar - Zg1-1-1-1-<br />
Name of authorized Represent<strong>at</strong>ives : l. superintending<br />
PIilD Circle. 2. I to be intlm<strong>at</strong>ed l<strong>at</strong>erl<br />
Engineer, Boleng<br />
2. The Engineer is ; E:recutive Engineer Mariyang Division ptrrD<br />
Name of authorized Represent<strong>at</strong>ives: l. AE & JF-in chergc of worl.<br />
appointed laq<br />
2 fto bc<br />
3. The Dispute Review Expert appointed jointly by the Employer and Contractor [Cl. 1 . 1]<br />
IS:<br />
*Name:<br />
Mt. M.n.Bbaghff<strong>at</strong>i<br />
*Address: GREEN P<strong>at</strong>h, Near s.B. Dewrah college, Ulubari, Bara Service,<br />
Guwah<strong>at</strong>i -701007 Ph: 2S2035o(R) 9R6407a980<br />
4. The Defects Liability Period is 365 days from the d<strong>at</strong>e of completion. [c1.1.1& 3sl<br />
5. The start D<strong>at</strong>e shall be 21 (twenty one) days for the d<strong>at</strong>e of issue of the Notice tcl.1.11<br />
to proceed with the work.<br />
6' The Intended Completion D<strong>at</strong>e for the whole of the Works is 21 {Twenty One) [C1.1.1,12& 2gl<br />
months after start of work with the folowing milestones.<br />
Milestone d<strong>at</strong>es:<br />
Physical works to be completed<br />
Milestone 1 i.e. Completion of Desiga & Drarings,<br />
getting the Design & Drawings proofchecked by<br />
eD I.I.T. or eny other institute of repute and<br />
suhmiscLion to the depertaeaL<br />
Milestone 2 i.e. Completion of sub-stnrcture and<br />
fabric<strong>at</strong>ion & trial assemblying, etc of<br />
componenta of the super-structure <strong>at</strong> work shop<br />
Milestone 3i.e Completion of delivery of fabric<strong>at</strong>ed<br />
components of super structure <strong>at</strong> site of work.<br />
Milestone 4i.e completion of errection of super<br />
structure and all rel<strong>at</strong>ed works & activities ln dl<br />
reslrcct<br />
Milestone Si.e Load testing, defect{sf correction (if<br />
any) & commissioning.<br />
Period from the start d<strong>at</strong>e<br />
l.O (Onef Uonth<br />
9.5O (l{iae and half] Months<br />
l.O (One) Month<br />
g.s (Eight and a halg Months<br />
1 {one} Month<br />
ICr. 2.2 & 49.11<br />
7 " The Site is loc<strong>at</strong>ed <strong>over</strong> <strong>Yamne</strong> <strong>at</strong> Regl<strong>at</strong> (<strong>Bysang</strong>) in Uppe r Sirng District of A-p.<br />
[C 1 . 1 . i I<br />
g. C/o <strong>Motorable</strong> <strong>Steel</strong> <strong>Arch</strong> bridge <strong>over</strong> <strong>river</strong> <strong>Yamne</strong> <strong>at</strong> Regl<strong>at</strong> (Bys*g) Span - 90.00rntr in U14rer<br />
Siaag District of A-P under NICPR<br />
r^ 1 1 r<br />
tu r ' r ' r l<br />
g. T?reworksconsisrsof Sub-structure&Super-Stmctureworks. a,oa{ J"SiVn.<br />