C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

tl<br />

9. Payments<br />

Payrnents will be made on perc-errtage r<strong>at</strong>e on successful completion of mile<br />

stones as detailed below.<br />

Completion of substructure (Right Bank<br />

and Left Bank Abutrnents, Launching<br />

Space, etc) ilc design and<br />

drawings,proof-checking of the design<br />

and drawings and submission to the<br />

Completion of {abric<strong>at</strong>ion of components<br />

of super-structure including trial<br />

assemblying and painring as per<br />

specific<strong>at</strong>ions <strong>at</strong> work shop.<br />

Completion of delivery of fabric<strong>at</strong>ed<br />

components of super structure <strong>at</strong> bridge<br />

site.<br />

IOo/o of Contract Value.<br />

35% of Contract Value.<br />

l1oh of Contract Value.<br />

structure) including all activities and<br />

works connected with erection such as<br />

assemblying of fabric<strong>at</strong>ed parts ,<br />

transport<strong>at</strong>ion in and around the site.<br />

fixing bearings, providing RCC approach<br />

slabs, painting , grouting etc as per<br />

specific<strong>at</strong>ion and as directed bv the<br />

Load testing, defect(s) correction (if any)<br />

& commissioni<br />

lOoh of Contract Value<br />

!.<br />