For the purpose of this paragraph; 'cormpt<br />

practice" means the offering,<br />

giving, receiving or soliciting of any thing of value to influence the action of a public<br />

official in the procurement process or in contract execution. "Fraudulent practice" meerns<br />

a misrepresent<strong>at</strong>ion of facts in order to inflrrence a procurement process or the excslflqre<br />

of a contract to the detriment of the Borrower, and includes collusive practice among<br />

Bidders (prior to or after bid submission) designed to establish bid prites <strong>at</strong> artificial<br />

non-competitive levels and to deprive the Borrower of the benefits of free and open<br />

competition."<br />

59.3 When either party to the Contractor gives notice of a breach of contract to the<br />

Engineer for a cause other than those listed under Sub Clause 59.2 above, the<br />

Engineer shall decide whether the breach is fundamental or not.<br />

59.4<br />

59.5<br />

6().<br />

60.1<br />

Notwithstanding the above, the Employer may termin<strong>at</strong>e the Contract for<br />

convenience.<br />

If the Contract is termin<strong>at</strong>ed the Contractor shall stop work immedi<strong>at</strong>ely,<br />

make the Site safe and sectrre and leave the Site as soon as reasonablv<br />

possible.<br />

Pa5rment upon Termin<strong>at</strong>ion<br />

If the Contract is termin<strong>at</strong>ed because of a fundamental breach of Contract by<br />

the Contractor, ttte Engineer shall issue a certific<strong>at</strong>e for<br />

-done-tess -pa]freiffi-re-drved<br />

the value of the work<br />

Eah/anc-e<br />

upfu me -dete or ahelssue oa Ee<br />

certific<strong>at</strong>e, less other rec<strong>over</strong>ies due in terms of the contract, less taxes due to<br />

be deducted <strong>at</strong> source as per applicable law and less the percentage to apply<br />

to the work not completed as indic<strong>at</strong>ed in the Contract D<strong>at</strong>a. Additional<br />

Liquid<strong>at</strong>ed Damages shall not apply. If the total amount due to the Employer<br />

exceeds any payment due to the Contractor the difference shall be a debt<br />

payable to the Employer.<br />

60"2 If the Contract is termin<strong>at</strong>ed <strong>at</strong> the Employer's convenience or because of a<br />

fundamental breach of Contract by the Employer, the Engineer shall issue a<br />

certific<strong>at</strong>e for the value of the work done, the cost of balance m<strong>at</strong>erial brought<br />

by the contractor and available <strong>at</strong> site, the reasonable cost of remor,ral of<br />

Equipment, rep<strong>at</strong>ri<strong>at</strong>ion of the contractor's personnel employed solely on the<br />

Works and the Contractor's costs of protecting and securing the Works and<br />

less advance paJrnents received upto the d<strong>at</strong>e of the certific<strong>at</strong>e, less other<br />

rec<strong>over</strong>ies due in terms of the contract and less taxes due to be deducted <strong>at</strong><br />

source as per applicable law.<br />

61.<br />

61" 1<br />

62.<br />

62.7<br />

Property<br />

All m<strong>at</strong>erials on the site, Plant, Equipment, Temporary works and works are<br />

deemed to be the property of the Employer, if the Contract is termin<strong>at</strong>ed<br />

because of a Contractor's default.<br />

Release from Performance<br />

If the Contract is frustr<strong>at</strong>ed by the outbreak of war or by any other event<br />

entirely outside the control of either the Employer or the Contractor the<br />

Engineer shall certify th<strong>at</strong> the Contract has been frustr<strong>at</strong>ed. The Contractor<br />

shall make the Site safe and stop work as quickly as possible after receiving<br />

this certific<strong>at</strong>e and shall Lre paid for all work caried out before receiving it and<br />

for any work carried out aflerwards to which commitment was made.<br />