C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang) C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
c= a oht >-o lD- o I=-e 61 5t.2 51.3 51.4 52. 52.r 53. 54. 54.1 The contractor is to use the advance payment only to pay ior Equipment, Plant and Mobilization expenses required specifically for execution of the Works. The Contractor shall demonstrate that advance payment has been used in this way fu supptying copis of irrvoices or otirer dosuments to the Engineer. The advance payment shall be repaid by deducting proportionate amounts from paS,rnents otherwise due to the Contractor, following the schedule of completed percentages of the Works on a payment basis. No account shall be taken of the advance payment or its repayment in assessing valuations of work done, Variations, price adjustments, corrrpensation Events, or Liquidated Damages. Secured Advance The Engineer shall make advance payment in respect of materials intended for but not yet incorporated in the Works in accurdance with conditions stipulaGd in the Contract Data. Scurities The Performance Security (including additional security for unbalanced bids) shall be provided to the Employer no later than the date specified in the Letter of Acceptance and shall be issued in an amount and form and bv a bank or -=ffi retr_a eeqltable-to-tfre€rnployer,ffi im-upees.The Performance Securit5z shall be valid until a date 28 days from the date of expiry of Defects Liability Period and the additional security for unbalanced bids shall be valid until a date 28 days from the date of issue of the certificate of completion. Deleted Cst of ReFirs Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or damage arises from the Contractor's acts or omissions. E. FINISHING THE CONTRACT 55. 55.1 56. 56.1 Completion The Contractor shall request the Engineer to issue a Certificate of Completion of the works and the Engineer will do so upon deciding that the work is completed. Taking over The Employer shall take over the Site and the Works within seven davs of the Engineer issuing a certificate of Completion. 57. 57.1 Final Account The Contractor shalt supply to the Engineer a detailed account of the total amount that t.l.e Contractor considers payable under the Contract before the end of the Defects Liability Period. The Engineer shall issue a Defect Liability Certilicate and certify any final pa5rment that is due to the Contractor within 56 days of receiving the Contrrctor's rccount if it is correct and complete. If it is not, the Engineer shall issue within 56 days a scheduie that states the
g>t^l: O t> =O 58. 58.1 scope gf the Accnuht is still 62 comections at ad,{ti-ons that ere sha,, c,ecid.;,i:"*:i1:l'l'dff: I iry certificate' within so arv" ffii?]'#:jT.#l "itd;J#"t tt. cont...io'.-," :i#H ."rri".a ...ou.ri. - Operating and Maintenance ff Mann?ts "as built Dl required, and/or oper-ating ,t. --- --'rrractor and maintenance manuars Dala. shall suppty are "orTt"u" trr"-"riti* a.i" stated in the contract i*i="fi""*tl':ttH'".i::T.:T,s?#.":;il..oersha'a,sosu supported by load.c*.uraiio"^"ro design or *r"i,,41 |fjfenins girders srructures to be used r" tn.-.r."tio"n of the;_;*d;#il ;#5u::nrns the contract data ;p;;;r"r shatt be {"r ; allowed *: a.p"tt-rrr;:'ffi to r. ..!it;;;,h#, part of prio. superstructure upp.orr.r'"i *. erection manuar. s8.2 59. 59.1 59.2 If the contractor stated supply in 9:^r."::, ,n: the con{1c1?1,", and/or ?::Tng. manuars ;t'd;r by not the recerive dates t}re-engineer,s approvar, the ffiT.Tt ;lf;H$:i1ff;ff";", stared *;; contract _Data from Terrrination - *tfut** ot"*t "or*tgr4utq".**ur. ** ,, *. uro-a "n*.*r*"* u-o breaches of #t:*ffi:"tal contract include, but shall not be rimited to the (a) the Contract the curren; H;:ff:'#int"oy^"_:nen.no stoppage of work is shown Engineer; e stoppage has on not nien auttroJJ'i" ,n. (b) t'ff,*tlffiiT:l?:lx.l*'#,ffi,?;,:$.j:' (c) ffi?ilti?.L::Ji:f"T'#ffi;#:n the progress or the works and the bankrupt or soes into riquidation other (d) A payment l."ItS by the contractor Engireer within not .is paid so a"v" by iiih."i!r. the Employer of the Engineer,s to the certificate. (e) The Engineer gives Notice fundamental that failure to breach con-ect tr a.-particular Ct",r# and. Defect the- cr"ir""i", is a reasonable period of time ,.,r" a.t.iliri.o ,o correct by it the within Engineer. a (0 The contractor does not maintain a security which is required. (g) (h) ha.s delaved the ;ff'f",?'JT[: completion of works by tfe number of days for trre contrlclo""fr,"fro*ount of liquid'ated o"-"g." Ji" o. paid as defined in if the contractor, in the judgement of the Employer has engaged in corrupt or fraudulent practices i" ".-G,i"gio, o. in executing the contract"
- Page 11 and 12: 10 SECTION 1 INSTRUCTIONS TO BIDDER
- Page 13 and 14: 1.2 A. GENERAL L 1. 1. r.2. 1.3 2.
- Page 15 and 16: T4 (k) 0) 4.4. 4.5. A. (a) (b) (c)
- Page 17 and 18: c-_ a ow=C I=O D=tl IO 4.7. Bidders
- Page 19 and 20: c-- o OU.l = D l-- o D: t) l8 9. 9.
- Page 21 and 22: 20 13. 13.1 13.2. Bid Prices The co
- Page 23 and 24: C:O Or^l: O (D=b t=- ol 2e (c) in t
- Page 25 and 26: AA z- 23.3. zJ.+ 23.5. 3.6. 23.7. '
- Page 27 and 28: o gN:e Dzb Such adjusteC bid price
- Page 29 and 30: z6 36. 36.1. 37. 37 "r" 37.2" Dispu
- Page 31 and 32: c -bl >C 5 =-t) 30 9. Price level o
- Page 33 and 34: c+b ot^l -o S=-c I--t JZ ' Atntgn R
- Page 35 and 36: 34 filoffi I I i.':-',-- C=A c)"^l
- Page 37 and 38: 36 #I.3-2. Quantities of work execu
- Page 39 and 40: C: O gvJz 0 D: t) I=o 38 1"6" Quali
- Page 41 and 42: gr,tzo DzO L=4 40 SAMPLE FORMAT FOR
- Page 43 and 44: C'-o oul zb D:b T=o 42 UNDERTAKING
- Page 45 and 46: 44 .,tlnffiw v)" I C=A gt^I? O D>O
- Page 47 and 48: I I r.ioN=o D>c f=o 46 t1 at(ilK )"
- Page 49 and 50: 48 Equipment is the Contractor's ma
- Page 51 and 52: OW: O .Dr c T=e 50 8. 8.1. Other Co
- Page 53 and 54: C =.O or.I = D Di o Iio 52 19. 19.1
- Page 55 and 56: 54 28.2 28.3 28.3A. 29. 30. 30.1 31
- Page 57 and 58: 38.2 The Engineer shal1 not adjust
- Page 59 and 60: 58 (d)TheEngineerinstructstheContra
- Page 61: DJc JzC 60 49.2. 49.3. If the Inten
- Page 65 and 66: D =C I--o 64 F. SPE|CIAL CONDITIONS
- Page 67 and 68: 66 i) k) r) m) n) Payment of Bonus
- Page 69 and 70: ig (c) If one of the parties faiis
- Page 71 and 72: 70 Commissioner, Government of Arun
- Page 73 and 74: 72 SECTION 4 CONTRACT DATA c ao o\^
- Page 75 and 76: 74 (Al Road Works Clause Rederemc w
- Page 77 and 78: t) Clause Reference @-to section 3
- Page 79 and 80: C so c)t^): o D=o .L=o 78 :*"Tr["i:
- Page 81 and 82: ii. Equipment 80 9Ao/o fot rler.i.'
- Page 83 and 84: 82 SECTION 5 TDCIINICAL SPECIFICATI
- Page 85 and 86: 84 lrt f)\uffir'\ I V IV V Cr o eul
- Page 87 and 88: c,=.b outzg D=o Do 86 llrr A /l tl
- Page 89 and 90: c>b P>0 f=P 88 6. We accept the app
- Page 91 and 92: Ca o g t^}"-o D=0 I=a 90 ,j,',
- Page 93 and 94: 9'2 (,)lnfrw l0 ))" V I I CtA gr,Ie
- Page 95 and 96: 94 (illnffiw l!)' C-?t] ClvJ:O D=o
- Page 97 and 98: " '14- / :; :,1. : .- . -,' : '-: :
- Page 99 and 100: 98 ^lr( n nfn ll n\ a^ll?,))t)'" |
- Page 101 and 102: 100 This Guarantee will remain in f
- Page 103 and 104: o2 I ṭk= Cac ON:O D :-O IrO A
- Page 105 and 106: 104 I C, >c gt^i+_b D:c D=P
- Page 107 and 108: (s) forthwith replace the sarne wit
- Page 109 and 110: C=r] OWz O D=O ftC; 108 ^flr( aliaf
- Page 111 and 112: c-r-o $$Je s D=O c fr/\ 1 ( _.
g>t^l: O t> =O<br />
58.<br />
58.1<br />
scope gf the<br />
Accnuht is still<br />
62<br />
comections <strong>at</strong> ad,{ti-ons th<strong>at</strong> ere<br />
sha,, c,ecid.;,i:"*:i1:l'l'dff:<br />
I iry<br />
certific<strong>at</strong>e' within so arv"<br />
ffii?]'#:jT.#l<br />
"itd;J#"t<br />
tt. cont...io'.-," :i#H<br />
."rri".a ...ou.ri. -<br />
Oper<strong>at</strong>ing and Maintenance<br />
ff Mann?ts<br />
"as built Dl<br />
required,<br />
and/or oper-<strong>at</strong>ing ,t. --- --'rrractor and maintenance manuars<br />
Dala.<br />
shall suppty are<br />
"orTt"u"<br />
trr"-"riti* a.i" st<strong>at</strong>ed in the contract<br />
i*i="fi""*tl':ttH'".i::T.:T,s?#.":;il..oersha'a,sosu<br />
supported by load.c*.uraiio"^"ro<br />
design or *r"i,,41 |fjfenins girders<br />
srructures to be used r" tn.-.r."tio"n of the;_;*d;#il<br />
;#5u::nrns<br />
the contract d<strong>at</strong>a ;p;;;r"r<br />
sh<strong>at</strong>t be {"r ;<br />
allowed<br />
*: a.p"tt-rrr;:'ffi<br />
to r. ..!it;;;,h#, part of<br />
prio.<br />
superstructure<br />
upp.orr.r'"i *. erection manuar.<br />
s8.2<br />
59.<br />
59.1<br />
59.2<br />
If the contractor<br />
st<strong>at</strong>ed<br />
supply<br />
in 9:^r."::, ,n:<br />
the con{1c1?1,", and/or ?::Tng. manuars<br />
;t'd;r<br />
by<br />
not<br />
the<br />
recerive<br />
d<strong>at</strong>es<br />
t}re-engineer,s approvar, the<br />
ffiT.Tt ;lf;H$:i1ff;ff";",<br />
stared *;; contract<br />
_D<strong>at</strong>a<br />
from<br />
Terrrin<strong>at</strong>ion<br />
- *tfut** ot"*t<br />
"or*tgr4utq".**ur. ** ,, *. uro-a "n*.*r*"* u-o<br />
breaches of<br />
#t:*ffi:"tal<br />
contract include, but shall not be rimited to the<br />
(a)<br />
the Contract<br />
the curren; H;:ff:'#int"oy^"_:nen.no stoppage of work is shown<br />
Engineer; e stoppage has on<br />
not nien auttroJJ'i" ,n.<br />
(b)<br />
t'ff,*tlffiiT:l?:lx.l*'#,ffi,?;,:$.j:'<br />
(c)<br />
ffi?ilti?.L::Ji:f"T'#ffi;#:n<br />
the progress or the works and the<br />
bankrupt or soes into riquid<strong>at</strong>ion other<br />
(d) A payment<br />
l."ItS<br />
by the<br />
contractor<br />
Engireer within<br />
not .is<br />
paid<br />
so a"v"<br />
by<br />
iiih."i!r.<br />
the Employer<br />
of the Engineer,s<br />
to the<br />
certific<strong>at</strong>e.<br />
(e) The Engineer gives Notice<br />
fundamental<br />
th<strong>at</strong> failure to breach<br />
con-ect<br />
tr<br />
a.-particular<br />
Ct",r# and.<br />
Defect<br />
the- cr"ir""i",<br />
is a<br />
reasonable period of time<br />
,.,r"<br />
a.t.iliri.o<br />
,o correct<br />
by<br />
it<br />
the<br />
within<br />
Engineer.<br />
a<br />
(0 The contractor does not maintain a security which is required.<br />
(g)<br />
(h)<br />
ha.s delaved the<br />
;ff'f",?'JT[:<br />
completion of works by tfe number of days for<br />
trre contrlclo""fr,"fro*ount<br />
of liquid'<strong>at</strong>ed o"-"g." Ji" o. paid as defined in<br />
if the contractor, in the judgement of the Employer has engaged in corrupt or<br />
fraudulent practices i"<br />
".-G,i"gio,<br />
o. in executing the contract"