C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang) C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

arunachalpwd.org
from arunachalpwd.org More from this publisher
09.11.2014 Views

c= a oht >-o lD- o I=-e 61 5t.2 51.3 51.4 52. 52.r 53. 54. 54.1 The contractor is to use the advance payment only to pay ior Equipment, Plant and Mobilization expenses required specifically for execution of the Works. The Contractor shall demonstrate that advance payment has been used in this way fu supptying copis of irrvoices or otirer dosuments to the Engineer. The advance payment shall be repaid by deducting proportionate amounts from paS,rnents otherwise due to the Contractor, following the schedule of completed percentages of the Works on a payment basis. No account shall be taken of the advance payment or its repayment in assessing valuations of work done, Variations, price adjustments, corrrpensation Events, or Liquidated Damages. Secured Advance The Engineer shall make advance payment in respect of materials intended for but not yet incorporated in the Works in accurdance with conditions stipulaGd in the Contract Data. Scurities The Performance Security (including additional security for unbalanced bids) shall be provided to the Employer no later than the date specified in the Letter of Acceptance and shall be issued in an amount and form and bv a bank or -=ffi retr_a eeqltable-to-tfre€rnployer,ffi im-upees.The Performance Securit5z shall be valid until a date 28 days from the date of expiry of Defects Liability Period and the additional security for unbalanced bids shall be valid until a date 28 days from the date of issue of the certificate of completion. Deleted Cst of ReFirs Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or damage arises from the Contractor's acts or omissions. E. FINISHING THE CONTRACT 55. 55.1 56. 56.1 Completion The Contractor shall request the Engineer to issue a Certificate of Completion of the works and the Engineer will do so upon deciding that the work is completed. Taking over The Employer shall take over the Site and the Works within seven davs of the Engineer issuing a certificate of Completion. 57. 57.1 Final Account The Contractor shalt supply to the Engineer a detailed account of the total amount that t.l.e Contractor considers payable under the Contract before the end of the Defects Liability Period. The Engineer shall issue a Defect Liability Certilicate and certify any final pa5rment that is due to the Contractor within 56 days of receiving the Contrrctor's rccount if it is correct and complete. If it is not, the Engineer shall issue within 56 days a scheduie that states the

g>t^l: O t> =O 58. 58.1 scope gf the Accnuht is still 62 comections at ad,{ti-ons that ere sha,, c,ecid.;,i:"*:i1:l'l'dff: I iry certificate' within so arv" ffii?]'#:jT.#l "itd;J#"t tt. cont...io'.-," :i#H ."rri".a ...ou.ri. - Operating and Maintenance ff Mann?ts "as built Dl required, and/or oper-ating ,t. --- --'rrractor and maintenance manuars Dala. shall suppty are "orTt"u" trr"-"riti* a.i" stated in the contract i*i="fi""*tl':ttH'".i::T.:T,s?#.":;il..oersha'a,sosu supported by load.c*.uraiio"^"ro design or *r"i,,41 |fjfenins girders srructures to be used r" tn.-.r."tio"n of the;_;*d;#il ;#5u::nrns the contract data ;p;;;r"r shatt be {"r ; allowed *: a.p"tt-rrr;:'ffi to r. ..!it;;;,h#, part of prio. superstructure upp.orr.r'"i *. erection manuar. s8.2 59. 59.1 59.2 If the contractor stated supply in 9:^r."::, ,n: the con{1c1?1,", and/or ?::Tng. manuars ;t'd;r by not the recerive dates t}re-engineer,s approvar, the ffiT.Tt ;lf;H$:i1ff;ff";", stared *;; contract _Data from Terrrination - *tfut** ot"*t "or*tgr4utq".**ur. ** ,, *. uro-a "n*.*r*"* u-o breaches of #t:*ffi:"tal contract include, but shall not be rimited to the (a) the Contract the curren; H;:ff:'#int"oy^"_:nen.no stoppage of work is shown Engineer; e stoppage has on not nien auttroJJ'i" ,n. (b) t'ff,*tlffiiT:l?:lx.l*'#,ffi,?;,:$.j:' (c) ffi?ilti?.L::Ji:f"T'#ffi;#:n the progress or the works and the bankrupt or soes into riquidation other (d) A payment l."ItS by the contractor Engireer within not .is paid so a"v" by iiih."i!r. the Employer of the Engineer,s to the certificate. (e) The Engineer gives Notice fundamental that failure to breach con-ect tr a.-particular Ct",r# and. Defect the- cr"ir""i", is a reasonable period of time ,.,r" a.t.iliri.o ,o correct by it the within Engineer. a (0 The contractor does not maintain a security which is required. (g) (h) ha.s delaved the ;ff'f",?'JT[: completion of works by tfe number of days for trre contrlclo""fr,"fro*ount of liquid'ated o"-"g." Ji" o. paid as defined in if the contractor, in the judgement of the Employer has engaged in corrupt or fraudulent practices i" ".-G,i"gio, o. in executing the contract"

g>t^l: O t> =O<br />

58.<br />

58.1<br />

scope gf the<br />

Accnuht is still<br />

62<br />

comections <strong>at</strong> ad,{ti-ons th<strong>at</strong> ere<br />

sha,, c,ecid.;,i:"*:i1:l'l'dff:<br />

I iry<br />

certific<strong>at</strong>e' within so arv"<br />

ffii?]'#:jT.#l<br />

"itd;J#"t<br />

tt. cont...io'.-," :i#H<br />

."rri".a ...ou.ri. -<br />

Oper<strong>at</strong>ing and Maintenance<br />

ff Mann?ts<br />

"as built Dl<br />

required,<br />

and/or oper-<strong>at</strong>ing ,t. --- --'rrractor and maintenance manuars<br />

Dala.<br />

shall suppty are<br />

"orTt"u"<br />

trr"-"riti* a.i" st<strong>at</strong>ed in the contract<br />

i*i="fi""*tl':ttH'".i::T.:T,s?#.":;il..oersha'a,sosu<br />

supported by load.c*.uraiio"^"ro<br />

design or *r"i,,41 |fjfenins girders<br />

srructures to be used r" tn.-.r."tio"n of the;_;*d;#il<br />

;#5u::nrns<br />

the contract d<strong>at</strong>a ;p;;;r"r<br />

sh<strong>at</strong>t be {"r ;<br />

allowed<br />

*: a.p"tt-rrr;:'ffi<br />

to r. ..!it;;;,h#, part of<br />

prio.<br />

superstructure<br />

upp.orr.r'"i *. erection manuar.<br />

s8.2<br />

59.<br />

59.1<br />

59.2<br />

If the contractor<br />

st<strong>at</strong>ed<br />

supply<br />

in 9:^r."::, ,n:<br />

the con{1c1?1,", and/or ?::Tng. manuars<br />

;t'd;r<br />

by<br />

not<br />

the<br />

recerive<br />

d<strong>at</strong>es<br />

t}re-engineer,s approvar, the<br />

ffiT.Tt ;lf;H$:i1ff;ff";",<br />

stared *;; contract<br />

_D<strong>at</strong>a<br />

from<br />

Terrrin<strong>at</strong>ion<br />

- *tfut** ot"*t<br />

"or*tgr4utq".**ur. ** ,, *. uro-a "n*.*r*"* u-o<br />

breaches of<br />

#t:*ffi:"tal<br />

contract include, but shall not be rimited to the<br />

(a)<br />

the Contract<br />

the curren; H;:ff:'#int"oy^"_:nen.no stoppage of work is shown<br />

Engineer; e stoppage has on<br />

not nien auttroJJ'i" ,n.<br />

(b)<br />

t'ff,*tlffiiT:l?:lx.l*'#,ffi,?;,:$.j:'<br />

(c)<br />

ffi?ilti?.L::Ji:f"T'#ffi;#:n<br />

the progress or the works and the<br />

bankrupt or soes into riquid<strong>at</strong>ion other<br />

(d) A payment<br />

l."ItS<br />

by the<br />

contractor<br />

Engireer within<br />

not .is<br />

paid<br />

so a"v"<br />

by<br />

iiih."i!r.<br />

the Employer<br />

of the Engineer,s<br />

to the<br />

certific<strong>at</strong>e.<br />

(e) The Engineer gives Notice<br />

fundamental<br />

th<strong>at</strong> failure to breach<br />

con-ect<br />

tr<br />

a.-particular<br />

Ct",r# and.<br />

Defect<br />

the- cr"ir""i",<br />

is a<br />

reasonable period of time<br />

,.,r"<br />

a.t.iliri.o<br />

,o correct<br />

by<br />

it<br />

the<br />

within<br />

Engineer.<br />

a<br />

(0 The contractor does not maintain a security which is required.<br />

(g)<br />

(h)<br />

ha.s delaved the<br />

;ff'f",?'JT[:<br />

completion of works by tfe number of days for<br />

trre contrlclo""fr,"fro*ount<br />

of liquid'<strong>at</strong>ed o"-"g." Ji" o. paid as defined in<br />

if the contractor, in the judgement of the Employer has engaged in corrupt or<br />

fraudulent practices i"<br />

".-G,i"gio,<br />

o. in executing the contract"