57 422 42.3 42.4 42.5 42.6 43. 43.7 The Engineer shall check the Contractor's monthly statement within 14 days and certify the amount to be paid to the Contractor aJter taking into account any credit or debit for the s16nth in question in respect of materials for the works in the relevant amounts and under conditions set forth in sub-clause 51(3) of the Contract Data (SecuredAdvance). The value of work er
58 (d)TheEngineerinstructstheContractortouncovErortocarryout additiona]t."t='po'workw*richisthenfoundtohavenoDefects. (e) The Engineer does not apprrove of a subcontract to be let, within 15 days" (0 Ground conditions are substmtially more adverse than could reasonabiy have been assumed before issuance of t etter of Acceptance from the information issued to Bidders (including the site Investigation Reports)' from information available publicly and from a visual inspection of the site. (g)TheEngineergivesanjnstructionfordealingwithanunforeseen condition, by the Employer, or add.itional work required for safety or other reasons" ""rr"& (h) other contractors, pubiic utilities or the Employer does not _authorities, work within the dates and other constraints stated in the contract' and they cause delay or extra cost to the Contractor' (il The ad.vance payment is delayed, beyond 28 days after receipt of application and bank guarantee" 44.2 44.3 44.4 45. 45.1 tilTheeffectontheContractorofarryoftheEmployer'sRisks. (k) The Engineer unreasonably delays issuing a certificate of completion' (1) Other Compensation Events listed in the contract Data or mentioned in the Contract. If a Compensation Event would cause additional cost or would prevent the work being cornpleted before the Intended completion Date, the contract Price shall be increased and/or the intended completion Date is extended' The Engineer shall decide whether and by how much the contract Price shall be increased and whether and by how much the Intended completion Date shall be extended. As soon as information demonstrating the effect of each compensation Event upon the Contractor's forecast-cost-ttgl -bg"I=!ryytdfd by the Contractor' it is -Pdce to be .ss."s.d-ty tn. nngi.t*er and-the Contract shdfT-e{ustecr accordingly. If the contractor's forecast is deemed unreasonable, the Engineer shall adJust the Contract Price based on Engineer's own forecasl The Engineeiwill assume that the Contractor will react competently and prompfly to the event. The contractor shall not be entitled to compensation to the extent that the Employer's interests are adversety affected by the contractor not having given .*iy **tting or not having cooperated with the Engineer' Tax The rates quoted by the Contractor shail be deemed to be inclusive of the sales and other taxes that the contractor will have to pay for the performance of this Contract. The Employer will perform such duties in regard to the deduction of such taxes at source as per applicable law' I O D=o j=O
- Page 7 and 8: -- .- f,=- D:b I >-
- Page 9 and 10: o ^M I ,i:-,-_
- Page 11 and 12: 10 SECTION 1 INSTRUCTIONS TO BIDDER
- Page 13 and 14: 1.2 A. GENERAL L 1. 1. r.2. 1.3 2.
- Page 15 and 16: T4 (k) 0) 4.4. 4.5. A. (a) (b) (c)
- Page 17 and 18: c-_ a ow=C I=O D=tl IO 4.7. Bidders
- Page 19 and 20: c-- o OU.l = D l-- o D: t) l8 9. 9.
- Page 21 and 22: 20 13. 13.1 13.2. Bid Prices The co
- Page 23 and 24: C:O Or^l: O (D=b t=- ol 2e (c) in t
- Page 25 and 26: AA z- 23.3. zJ.+ 23.5. 3.6. 23.7. '
- Page 27 and 28: o gN:e Dzb Such adjusteC bid price
- Page 29 and 30: z6 36. 36.1. 37. 37 "r" 37.2" Dispu
- Page 31 and 32: c -bl >C 5 =-t) 30 9. Price level o
- Page 33 and 34: c+b ot^l -o S=-c I--t JZ ' Atntgn R
- Page 35 and 36: 34 filoffi I I i.':-',-- C=A c)"^l
- Page 37 and 38: 36 #I.3-2. Quantities of work execu
- Page 39 and 40: C: O gvJz 0 D: t) I=o 38 1"6" Quali
- Page 41 and 42: gr,tzo DzO L=4 40 SAMPLE FORMAT FOR
- Page 43 and 44: C'-o oul zb D:b T=o 42 UNDERTAKING
- Page 45 and 46: 44 .,tlnffiw v)" I C=A gt^I? O D>O
- Page 47 and 48: I I r.ioN=o D>c f=o 46 t1 at(ilK )"
- Page 49 and 50: 48 Equipment is the Contractor's ma
- Page 51 and 52: OW: O .Dr c T=e 50 8. 8.1. Other Co
- Page 53 and 54: C =.O or.I = D Di o Iio 52 19. 19.1
- Page 55 and 56: 54 28.2 28.3 28.3A. 29. 30. 30.1 31
- Page 57: 38.2 The Engineer shal1 not adjust
- Page 61 and 62: DJc JzC 60 49.2. 49.3. If the Inten
- Page 63 and 64: g>t^l: O t> =O 58. 58.1 scope gf th
- Page 65 and 66: D =C I--o 64 F. SPE|CIAL CONDITIONS
- Page 67 and 68: 66 i) k) r) m) n) Payment of Bonus
- Page 69 and 70: ig (c) If one of the parties faiis
- Page 71 and 72: 70 Commissioner, Government of Arun
- Page 73 and 74: 72 SECTION 4 CONTRACT DATA c ao o\^
- Page 75 and 76: 74 (Al Road Works Clause Rederemc w
- Page 77 and 78: t) Clause Reference @-to section 3
- Page 79 and 80: C so c)t^): o D=o .L=o 78 :*"Tr["i:
- Page 81 and 82: ii. Equipment 80 9Ao/o fot rler.i.'
- Page 83 and 84: 82 SECTION 5 TDCIINICAL SPECIFICATI
- Page 85 and 86: 84 lrt f)\uffir'\ I V IV V Cr o eul
- Page 87 and 88: c,=.b outzg D=o Do 86 llrr A /l tl
- Page 89 and 90: c>b P>0 f=P 88 6. We accept the app
- Page 91 and 92: Ca o g t^}"-o D=0 I=a 90 ,j,',
- Page 93 and 94: 9'2 (,)lnfrw l0 ))" V I I CtA gr,Ie
- Page 95 and 96: 94 (illnffiw l!)' C-?t] ClvJ:O D=o
- Page 97 and 98: " '14- / :; :,1. : .- . -,' : '-: :
- Page 99 and 100: 98 ^lr( n nfn ll n\ a^ll?,))t)'" |
- Page 101 and 102: 100 This Guarantee will remain in f
- Page 103 and 104: o2 I ṭk= Cac ON:O D :-O IrO A
- Page 105 and 106: 104 I C, >c gt^i+_b D:c D=P
- Page 107 and 108: (s) forthwith replace the sarne wit
58<br />
(d)TheEngineerinstructstheContractortouncovErortocarryout<br />
additiona]t."t='po'workw*richisthenfoundtohavenoDefects.<br />
(e) The Engineer does not apprrove of a subcontract to be let, within 15 days"<br />
(0 Ground conditions are substmtially more adverse than could reasonabiy<br />
have been assumed before issuance of t etter of Acceptance from the<br />
inform<strong>at</strong>ion issued to Bidders (including the site Investig<strong>at</strong>ion Reports)'<br />
from inform<strong>at</strong>ion available publicly and from a visual inspection of the<br />
site.<br />
(g)TheEngineergivesanjnstructionfordealingwithanunforeseen<br />
condition, by the Employer, or add.itional work required for safety<br />
or other reasons"<br />
""rr"&<br />
(h)<br />
other contractors, pubiic utilities or the Employer does not<br />
_authorities,<br />
work within the d<strong>at</strong>es and other constraints st<strong>at</strong>ed in the contract' and<br />
they cause delay or extra cost to the Contractor'<br />
(il The ad.vance payment is delayed, beyond 28 days after receipt of<br />
applic<strong>at</strong>ion and bank guarantee"<br />
44.2<br />
44.3<br />
44.4<br />
45.<br />
45.1<br />
tilTheeffectontheContractorofarryoftheEmployer'sRisks.<br />
(k)<br />
The Engineer unreasonably delays issuing a certific<strong>at</strong>e of completion'<br />
(1) Other Compens<strong>at</strong>ion Events listed in the contract D<strong>at</strong>a or mentioned in<br />
the Contract.<br />
If a Compens<strong>at</strong>ion Event would cause additional cost or would prevent the<br />
work being cornpleted before the Intended completion D<strong>at</strong>e, the contract Price<br />
shall be increased and/or the intended completion D<strong>at</strong>e is extended' The<br />
Engineer shall decide whether and by how much the contract Price shall be<br />
increased and whether and by how much the Intended completion D<strong>at</strong>e shall<br />
be extended.<br />
As soon as inform<strong>at</strong>ion demonstr<strong>at</strong>ing the effect of each compens<strong>at</strong>ion Event<br />
upon the Contractor's forecast-cost-ttgl -bg"I=!ryytdfd<br />
by the Contractor' it is<br />
-Pdce<br />
to be .ss."s.d-ty tn. nngi.t*er and-the Contract shdfT-e{ustecr<br />
accordingly. If the contractor's forecast is deemed unreasonable, the Engineer<br />
shall adJust the Contract Price based on Engineer's own forecasl The<br />
Engineeiwill assume th<strong>at</strong> the Contractor will react competently and prompfly<br />
to the event.<br />
The contractor shall not be entitled to compens<strong>at</strong>ion to the extent th<strong>at</strong> the<br />
Employer's interests are adversety affected by the contractor not having given<br />
.*iy **tting or not having cooper<strong>at</strong>ed with the Engineer'<br />
Tax<br />
The r<strong>at</strong>es quoted by the Contractor shail be deemed to be inclusive of the sales<br />
and other taxes th<strong>at</strong> the contractor will have to pay for the performance of<br />
this Contract. The Employer will perform such duties in regard to the<br />
deduction of such taxes <strong>at</strong> source as per applicable law'<br />