The Engineer shall check the Contractor's monthly st<strong>at</strong>ement within 14 days<br />
and certify the amount to be paid to the Contractor aJter taking into account<br />
any credit or debit for the s16nth in question in respect of m<strong>at</strong>erials for the<br />
works in the relevant amounts and under conditions set forth in sub-clause<br />
51(3) of the Contract D<strong>at</strong>a (SecuredAdvance).<br />
The value of work er