09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

57<br />

422<br />

42.3<br />

42.4<br />

42.5<br />

42.6<br />

43.<br />

43.7<br />

The Engineer shall check the Contractor's monthly st<strong>at</strong>ement within 14 days<br />

and certify the amount to be paid to the Contractor aJter taking into account<br />

any credit or debit for the s16nth in question in respect of m<strong>at</strong>erials for the<br />

works in the relevant amounts and under conditions set forth in sub-clause<br />

51(3) of the Contract D<strong>at</strong>a (SecuredAdvance).<br />

The value of work er

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!