09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

54<br />

28.2<br />

28.3<br />

28.3A.<br />

29.<br />

30.<br />

30.1<br />

31.<br />

31.1<br />

3r.2<br />

32.<br />

32.1<br />

32.2<br />

The Engineer shall decide whether and by how much to extend fhe Interr-ded<br />

Completion D<strong>at</strong>e within 35 days of the Contractor asking the Engineer for a<br />

decision upon the effect of a Compens<strong>at</strong>ion Event or Vari<strong>at</strong>ion and submitting<br />

full supporting inform<strong>at</strong>ion. If the Contractor has failed to give early warning<br />

of a delay or has failed Lo coopr<strong>at</strong>e in dealing with a delay, ttre delay by this<br />

failure shall not be considered in assessing the new Intended Completion<br />

D<strong>at</strong>e.<br />

The Engineer shall within 14 days of receiving full justific<strong>at</strong>ion from the<br />

contractor for extension of Intended Completion D<strong>at</strong>e refer to the Employer his<br />

decision" The Employer shall in not more than 21 days communic<strong>at</strong>e to the<br />

Engineer the acceptance or otherwise of the Engineer's decision. If the<br />

Employer fails to give his acceptance, the Engineer shall not grant the<br />

extension and the contractor may refer the m<strong>at</strong>ter to the Dispute Review<br />

Expert under Clause 24. 1.<br />

In exercise of provisions contained in clause 28.30 of condition of contract, the<br />

Superintending Engineer shall take decision on behalf of employer which shall<br />

be final and binding.<br />

Deleted<br />

Delays Ordered by the Engineer<br />

The Engineer may instruct the Contractor to delay the start or progress of any<br />

activity within the Works.<br />

Management Meetings<br />

Either the Engineer or the Contractor may require the other to <strong>at</strong>tend a<br />

management meeting. The business of a management meeting shall be to<br />

review the plans for remaining work and to deal with m<strong>at</strong>ters raised in<br />

accordance with the eady warning procedure.<br />

The Engineer shall record the business of management meeLings and is to<br />

provide copiesof his record-.to those <strong>at</strong>tending. the meeting anrl Jo the-.,-<br />

Employer. The responsibility of the parties for actions to be taken is to be<br />

decided by the Engineer either <strong>at</strong> the management meeting or after the<br />

management meeting and st<strong>at</strong>ed in writing to all who <strong>at</strong>tended the meeting.<br />

Early Warning<br />

The Contractor is to warn the Engineer <strong>at</strong> the earliest oppor[unity of specific<br />

likely future events or circumstances th<strong>at</strong> may adversely affect the quality of<br />

the work, increase the Contract Price or delay the execution of works. The<br />

Engineer may require the Contractor to provide an estim<strong>at</strong>e of tlle expected<br />

effect of the future event or circumstance on the Contract Price and<br />

Completion D<strong>at</strong>e. The estim<strong>at</strong>e is to be provided by the Contractor as soon as<br />

reasonably possible.<br />

The Contractor shall cooper<strong>at</strong>e with the Engineer in making and bonsidering<br />

proposals for how the effect of such an event or circumstance can be avoided<br />

or reduced by anyone involved in the work and in carrying out any resulting<br />

instruction of the Engineer.<br />