C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
53<br />
25.2.<br />
25.3.<br />
26.<br />
26.r.<br />
27.<br />
27.t.<br />
27.2.<br />
27.3.<br />
27.4.<br />
28.<br />
28.r.<br />
The Dispute Review Expert (Board)* shall be paid daily <strong>at</strong> the r<strong>at</strong>e specified in<br />
the Contract D<strong>at</strong>a togsder with reimbursable expenses of tJle types specified<br />
in the Contract D<strong>at</strong>a and the cost shall be divided equally between the<br />
Employer and the Corrtractor, wh<strong>at</strong>ever decision is reached by the Dispute<br />
Review Expert. Either party may give notice to the other to refer a decision of<br />
the Dispute Review Expert to an Arbitr<strong>at</strong>or within 28 days of the Dispute<br />
Review Expert's written decision. If neither party refers the dispute to<br />
arbitr<strong>at</strong>ion within the next 28 days, the Dispute Review Expert's decision will<br />
be {inal and binding.<br />
The arbitr<strong>at</strong>ion shall be conducted in accordance with the arbitr<strong>at</strong>ion<br />
procedure st<strong>at</strong>ed in the Special Conditions of Contract.<br />
Replacement of Dispute Review brpert<br />
should the Dispute Review Expert resign or die, or should the Employer and<br />
the Contractor agree th<strong>at</strong> the Dispute Review Expert is not fulfilling his<br />
functions in accordance with the provisions of the Contract, a new Dispute<br />
Review Expert will be jointly appointed by the Employer and the Contractor. In<br />
case of disagreement between the Employer and the Contractor within 30<br />
days, the Dispute Review Expert shall be design<strong>at</strong>ed by the Appointing<br />
Authority design<strong>at</strong>ed in the Contract D<strong>at</strong>a <strong>at</strong> the request of either peirty,<br />
within 14 days of receipt of such request.<br />
B. TIME CONTROL<br />
Prograrnme<br />
Within the time st<strong>at</strong>ed in the Contract D<strong>at</strong>a the Contractor shall submit to the<br />
Engineer for approval a Programme showing the general methods,<br />
arrangements, order, and tirning for all the activities in the Works alongwith<br />
monthly cash flow forecasl<br />
An upd<strong>at</strong>e of the Programme shall be a prograrnme showing the actual<br />
progress achieved on each activity and the effect of the progress achieved on<br />
the timing of the remaining work including any changes to the sequence of the<br />
activities.<br />
The Contractor shall submit to the Engineer, for approval, an upd<strong>at</strong>ed<br />
Ffogramrne <strong>at</strong>-rntervalS nolonge? than tFe@odst<strong>at</strong>ecfin fhe ConiraCt n<strong>at</strong>a.<br />
If the Contractor does not submit an upd<strong>at</strong>ed Programme within this period,<br />
the Engineer may withhold the amount st<strong>at</strong>ed in the Contract D<strong>at</strong>a from the<br />
next payment certific<strong>at</strong>e and continue to withhold this amount until the next<br />
payment after the d<strong>at</strong>e on which the <strong>over</strong>due Programme has been submitted.<br />
The Engineer's approval of the Programme shall not alter the Contractor's<br />
oblig<strong>at</strong>ions. The Contractor may revise the Programme and submit it to the<br />
Engineer again <strong>at</strong> any time. A revised Programme is to show the elfect of<br />
Vari<strong>at</strong>ions and Compens<strong>at</strong>ion Events.<br />
Drtension of tle Intended Completion D<strong>at</strong>e<br />
The Engineer shall extend the Intended Completion D<strong>at</strong>e if a Compens<strong>at</strong>ion<br />
Event occurs or a Vari<strong>at</strong>ion is issued which makes it impossible for<br />
Completion to be achieved by the Intended Completion D<strong>at</strong>e without the<br />
Contractor taking steps to acceler<strong>at</strong>e the remaining work and which would<br />
cause the Contractor to incur additional cost.<br />
./a<br />
C=0 DIJ.=O- O=6 f=-O