09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C =.O or.I = D Di o Iio<br />

52<br />

19.<br />

19.1.<br />

2().<br />

20.t.<br />

2L"<br />

21.I.<br />

22.<br />

22.r.<br />

23.<br />

23.r.<br />

23.2.<br />

24.<br />

24.1.<br />

Safety<br />

The Contractor shall be responsible for the safety of all activities on the Site.<br />

Disc<strong>over</strong>ies<br />

Anything of historical or other interest or of significant value unexpectedly<br />

disc<strong>over</strong>ed on the Site is the property of the Employer. The Contractor is to<br />

notify the Engineer of such disc<strong>over</strong>ies and carry out tJ.e Engineer's<br />

instructions for dealing with them.<br />

Prcsiorr of ttre Site<br />

The Employer shall give possession of all parts of the Site to the Contractor. If<br />

possession of a part is not given by the d<strong>at</strong>e st<strong>at</strong>ed in the Contract D<strong>at</strong>a the<br />

Employer is deemed to have delayed the start of the relevant activities and this<br />

will be Compens<strong>at</strong>ion Event.<br />

Access to the Site<br />

The contractor shall allow the Engineer and any person authorized by the<br />

Engineer access to the Site, to any place where work in connection with the<br />

Contract is being carried out or is intended to be carried out and to any place<br />

where m<strong>at</strong>erials or plant are being manufactured/fabric<strong>at</strong>ed/assembled for<br />

the works.<br />

Instructions<br />

The Contractor shall carry out all instructions of the Engineer pertaining to<br />

works which comply with the applicable laws where the Site is loc<strong>at</strong>ed.<br />

The Contractor shall permit the Employer to inspect the Contractor's accounts<br />

and records rel<strong>at</strong>ing to the performance of the Contractor and to have them<br />

audited by auditors appointed by the Employer, if so required by the<br />

Employer.<br />

Disputes<br />

If the Contractor believes th<strong>at</strong> a decision taken by the Engineer was either<br />

outside the authority given to the Engineer by the Contract or th<strong>at</strong> the<br />

decision was wrongly taken, the decision shall be referred to the Dispute<br />

Review Expert within 14 days of the notific<strong>at</strong>ion of the Engineer's decision.<br />

25.<br />

25.7.<br />

Procedure for Disputes<br />

The Dispute Review Expert (Board)* shall give a decision in writing within 28<br />

davs of receipt of a notific<strong>at</strong>ion of a dispute.<br />

*Disputes Review Expert to be provided for works costing up to Rs. 50 Crores. Dispute<br />

Review Board of three members {One from Employer, One from Contractor and One to be<br />

nomin<strong>at</strong>ed by IRC Council and agreed by the represent<strong>at</strong>ive members of Employer and<br />

Contractor) for works costing more than Rs. 50 Crores.<br />