C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
13.2.<br />
13.3.<br />
13.4.<br />
13.5.<br />
L4.<br />
14.1.<br />
15.<br />
i5.1.<br />
16.<br />
16.1.<br />
L7.<br />
17.7"<br />
18.<br />
18.1.<br />
18.2.<br />
18.3.<br />
18.4.<br />
8.5. A1l<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
loss of or damage to the Works, plant and M<strong>at</strong>erials;<br />
loss of or damage to Equipment;<br />
loss of or damage of property (except the works, plant, M<strong>at</strong>erials and<br />
Equipment) in connection with the Q6n1y3gt and<br />
personal injury or de<strong>at</strong>h.<br />
Policies and certific<strong>at</strong>es for insurance shall be delivered by the Contraclor to<br />
the Engineer for the Engineer's approval before the Start D<strong>at</strong>e. Al1 such<br />
insurance shall provide for cornpens<strong>at</strong>inn to be payable in the types and<br />
proportions of currencies required to rectify the loss or damage incurred.<br />
If the Contractor does not provide any of the policies and certific<strong>at</strong>es required,<br />
the Employer may effect the insurance which the Contractor should have<br />
provided and rec<strong>over</strong> the premiums the Employer has paid from payments<br />
otherwise due to the contractor or, if no payment is due, the payment of the<br />
premiums shall be a debt due.<br />
Alter<strong>at</strong>ions to the terms of insurance shall not be made without the approval<br />
of the Engineer.<br />
Both parties shall comply with any conditions of the insurance policies.<br />
Site Investig<strong>at</strong>ion Reports<br />
The Contractor in preparing the Bid, shall rely on any site Investig<strong>at</strong>ion<br />
Reports referred to in the Contract D<strong>at</strong>a, supplemented by any inform<strong>at</strong>ion<br />
available to the Bidder.<br />
Queries about the Contract D<strong>at</strong>a<br />
The Engineer will clarify queries on the Contract D<strong>at</strong>a.<br />
Contractor to Construct the Works<br />
The Contractor shall constmct and install the Works in accordance with the<br />
Specific<strong>at</strong>ion and Drawings.<br />
The Tlorks to be Completed by the Intended Completion D<strong>at</strong>e<br />
The Contractor may commence execution of the Works on the Start D<strong>at</strong>e and<br />
shall carry out the Works in accordance with the programm. *t-itt.a Uy ttr.<br />
contractor, as upd<strong>at</strong>ed with the approval of the Engineer, and complete them<br />
by the Intended Completion D<strong>at</strong>e.<br />
Approval by the Engineer<br />
The Contractor shall submit Specific<strong>at</strong>ion and Drawings showing the proposed<br />
Temporary works to the Engineer, who is to approve them if they comply with<br />
the specilic<strong>at</strong>ion and Drawings.<br />
The contractor shall be responsible for design of remporarSr works.<br />
The Engineer's approval shall not alter the Contractor's responsibility for<br />
design of the Temporar5r Works.<br />
The Contractor shall obtain approval of third parties to the design of the<br />
Temporary Works where required.<br />
Drawings prepared by the Contractor for the execution of the temporar5z or<br />
pefinanent Worts, are subject to prior approval by the Engineer before their<br />
use.<br />
C='O 'OW =6 D: O I*O