48<br />

Equipment is the Contractor's machinery and vehicles brought temporarily to<br />

the Site to construct the Works.<br />

The Initial Contract Price is the Contract Price listed in the Employer's Letter<br />

of Acceptance.<br />

The Intended Completion D<strong>at</strong>e is the d<strong>at</strong>e on which it is intended th<strong>at</strong> the<br />

Contractor shall complete the Works" The Intended Completion D<strong>at</strong>e is<br />

specified in the Contract D<strong>at</strong>a- The Intended Completion D<strong>at</strong>e may be revised<br />

only by the Engineer by issuing an extension of time.<br />

M<strong>at</strong>erials are all supplies, including consumables, used by the contractor for<br />

incorpor<strong>at</strong>ion in the Works.<br />

Plant is an integral part of the Works which is to have a mechanica-l,<br />

electrical, electronic or chemical or biological function.<br />

The Site is the area defined as such in the Contract D<strong>at</strong>a.<br />

Site Investig<strong>at</strong>ion Reports are those which were included in the Bidding<br />

documents and are factual interpret<strong>at</strong>ive reports about the surface ad subsurface<br />

conditions <strong>at</strong> the site.<br />

Specitic<strong>at</strong>ion means the Specific<strong>at</strong>ion of the Works included in the Contract<br />

and any modific<strong>at</strong>ion or addition made or approved by the Engineer.<br />

The Start D<strong>at</strong>e is given in the Contract D<strong>at</strong>a. It is the d<strong>at</strong>e when the<br />

Contractor shall commence execution of the works. It does not necessarily<br />

coincide with any of tlle Site Possession D<strong>at</strong>es.<br />

A Subcontractor is a person or corpor<strong>at</strong>e body who has a Contract with the<br />

Contractor to carry out a part of the work in the Contract which includes work<br />

on the site.<br />

Temporary Works are works designed, constructed, installed and removed by<br />

the Contractor which are needed for construction or install<strong>at</strong>ion of the Works.<br />

1\ Vari<strong>at</strong>ion is an instmctioq glYqn by the Englneg:r-q[ich varies the Wor@<br />

The Works are wh<strong>at</strong> the Contract requires the Contractor to construct, install,<br />

and turn <strong>over</strong> to the Employer, as defined in the Contract D<strong>at</strong>a.<br />

2.<br />

2.1<br />

2.2<br />

Interpret<strong>at</strong>ion<br />

In interpreting these Conditions of Contract, singular also means plural, male<br />

also means female or neuter, and the other way afound. Headings have no<br />

significance. Words have their normal meaning under the language of the<br />

Contract unless specifically defined. The Engineer will provide instructions<br />

clarifying queries about the Conditions of Contract.<br />

If secti.onal completion is specified in the Contract D<strong>at</strong>a, references in the<br />

Conditions of Contract to the Works, the Completion D<strong>at</strong>e, and the Intended<br />

Completion D<strong>at</strong>e apply to any Section of the Works (other than references to<br />

the Completion D<strong>at</strong>e and Intended Completion d<strong>at</strong>e for the whole of the<br />

Works).<br />

i.<br />

c-- o Ot.I:.8 b=c f= g<br />

'1 ,",-'