39 1.8. Financial reports for the last five years: balance sheets, profit and loss staternents, auditors' reports (in case of companies/corporation), etc. List them below and attach copies. 1.9' Evidence of access to linancial resources to meet the qualification requirements: cash in hand, lines of credit, etc. List them Lrelow and attach copies of support documerets. 1.10. Name, address, and telephone, telex, and fax numbers of the Bidders' bankers who may provide references if contacted by the Employer. 1.1 1. Information on litigation history in which the Bidder is involved. Other Party (ies) Employer Cause of Dispute Amount involved Remarkshowing Present Status 1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instructions to Bidders. (Name of Consultant engaged for project preparation is ............) 1.13. Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as necessary to comply with the requirements of the Bidding documents. [Refer ITB Clause 4.1 & 4.3 (1)] I.14" Programme 1.15. Quality Assurance Programme 2. Deleted 3. Additional Requirements 3.1. Bidders should provide any additional information required to fulfill the requirernents of Clause 4 of the Instructions to the Bidders. if applicable. (i) Affidavit (ii) Undertaking *** (iii) Update of original pre-qualification application *** (iv) Copy of original pre-qualification application *** (v) Copy of pre-qualification letter * Delete, if pre-qualification has been carried out. ** Fill the Name of Consultant *** Delete, if pre-qualification has not been carried out. c" o orl:b D=-o L*- e
gr,tzo DzO L=4 40 SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF CREDIT FACILITIES (CLAUSE 4.2 (tl oF rTB) BANK CERTIFTCATE This is to certify that M/s. company with a good hnancial standing. If the contract for the work, namely is awarded to the above firm, we .n"ff to the extent of Rs. capitar,"q,i."_.i is a reputed dit faciiities ,.nffiJ jl;il:fJl,:, (Signature) Name of Bank Senior Bank Manager Address of the Bank
- Page 1 and 2: GOVERNMENT OF ARUNACHAL PRADESII PU
- Page 3 and 4: lrt t^ffitr l)(w' c--0 O\^J 2 O J=-
- Page 5 and 6: .*natr) I v/>) >., .4 ll.4 lv( i l'
- Page 7 and 8: -- .- f,=- D:b I >-
- Page 9 and 10: o ^M I ,i:-,-_
- Page 11 and 12: 10 SECTION 1 INSTRUCTIONS TO BIDDER
- Page 13 and 14: 1.2 A. GENERAL L 1. 1. r.2. 1.3 2.
- Page 15 and 16: T4 (k) 0) 4.4. 4.5. A. (a) (b) (c)
- Page 17 and 18: c-_ a ow=C I=O D=tl IO 4.7. Bidders
- Page 19 and 20: c-- o OU.l = D l-- o D: t) l8 9. 9.
- Page 21 and 22: 20 13. 13.1 13.2. Bid Prices The co
- Page 23 and 24: C:O Or^l: O (D=b t=- ol 2e (c) in t
- Page 25 and 26: AA z- 23.3. zJ.+ 23.5. 3.6. 23.7. '
- Page 27 and 28: o gN:e Dzb Such adjusteC bid price
- Page 29 and 30: z6 36. 36.1. 37. 37 "r" 37.2" Dispu
- Page 31 and 32: c -bl >C 5 =-t) 30 9. Price level o
- Page 33 and 34: c+b ot^l -o S=-c I--t JZ ' Atntgn R
- Page 35 and 36: 34 filoffi I I i.':-',-- C=A c)"^l
- Page 37 and 38: 36 #I.3-2. Quantities of work execu
- Page 39: C: O gvJz 0 D: t) I=o 38 1"6" Quali
- Page 43 and 44: C'-o oul zb D:b T=o 42 UNDERTAKING
- Page 45 and 46: 44 .,tlnffiw v)" I C=A gt^I? O D>O
- Page 47 and 48: I I r.ioN=o D>c f=o 46 t1 at(ilK )"
- Page 49 and 50: 48 Equipment is the Contractor's ma
- Page 51 and 52: OW: O .Dr c T=e 50 8. 8.1. Other Co
- Page 53 and 54: C =.O or.I = D Di o Iio 52 19. 19.1
- Page 55 and 56: 54 28.2 28.3 28.3A. 29. 30. 30.1 31
- Page 57 and 58: 38.2 The Engineer shal1 not adjust
- Page 59 and 60: 58 (d)TheEngineerinstructstheContra
- Page 61 and 62: DJc JzC 60 49.2. 49.3. If the Inten
- Page 63 and 64: g>t^l: O t> =O 58. 58.1 scope gf th
- Page 65 and 66: D =C I--o 64 F. SPE|CIAL CONDITIONS
- Page 67 and 68: 66 i) k) r) m) n) Payment of Bonus
- Page 69 and 70: ig (c) If one of the parties faiis
- Page 71 and 72: 70 Commissioner, Government of Arun
- Page 73 and 74: 72 SECTION 4 CONTRACT DATA c ao o\^
- Page 75 and 76: 74 (Al Road Works Clause Rederemc w
- Page 77 and 78: t) Clause Reference @-to section 3
- Page 79 and 80: C so c)t^): o D=o .L=o 78 :*"Tr["i:
- Page 81 and 82: ii. Equipment 80 9Ao/o fot rler.i.'
- Page 83 and 84: 82 SECTION 5 TDCIINICAL SPECIFICATI
- Page 85 and 86: 84 lrt f)\uffir'\ I V IV V Cr o eul
- Page 87 and 88: c,=.b outzg D=o Do 86 llrr A /l tl
- Page 89 and 90: c>b P>0 f=P 88 6. We accept the app
gr,tzo DzO L=4<br />
40<br />
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR<br />
AVAILABILITY OF CREDIT FACILITIES<br />
(CLAUSE 4.2 (tl oF rTB)<br />
BANK CERTIFTCATE<br />
This is to certify th<strong>at</strong> M/s.<br />
company with a good hnancial standing.<br />
If the contract for the work, namely<br />
is awarded to the above firm, we .n"ff<br />
to the extent of Rs.<br />
capitar,"q,i."_.i<br />
is a reputed<br />
dit faciiities<br />
,.nffiJ jl;il:fJl,:,<br />
(Sign<strong>at</strong>ure)<br />
Name of Bank<br />
Senior Bank Manager<br />
Address of the Bank