36<br />

#I.3-2.<br />

Quantities of work executed as prime contractor, wot'k performed in the<br />

past as a nomin<strong>at</strong>ed sub-contractor, will also be considered provided<br />

the sub-contract involved execution of all main items of work described<br />

in the bid document, provided further th<strong>at</strong> all other qualific<strong>at</strong>ion criteria<br />

are s<strong>at</strong>isfied (in the same name and style) in the last five years: **<br />

Year<br />

2005-2006<br />

2006-2007<br />

2007-2008<br />

2008-2009<br />

2009-2010<br />

Name of the<br />

work<br />

Name of the<br />

Employer*<br />

Quantity of work performed<br />

Fabric<strong>at</strong>ion of<br />

Fabric<strong>at</strong>ion of steel steel<br />

superstructure of cable superstructure<br />

supported bridge for other type<br />

of bridses<br />

Remarks<br />

(indic<strong>at</strong>e<br />

contract<br />

Ref)<br />

1..4. Inform<strong>at</strong>ion on Bid Capacity (works for which bids have been submitted and works<br />

which are yet to be completed) as on the d<strong>at</strong>e of this bid'<br />

{A} Edsting commitments and on-geing works:<br />

Description<br />

of works<br />

Contract No.<br />

Name &<br />

Address of<br />

Employer<br />

Value of<br />

Contract<br />

{Rs. Cr}<br />

Stipul<strong>at</strong>ed<br />

Period of<br />

Cornoletion<br />

Value of works*<br />

remaining to be<br />

completed {Rs. Cr)<br />

2<br />

A a 5 o 7 8<br />

Place<br />

&<br />

St<strong>at</strong>e<br />

Anticip<strong>at</strong>ed d<strong>at</strong>e of<br />

completion<br />

* Attach certific<strong>at</strong>e(s) from the Engineer(s)-in-Charge<br />

@ The item of uorkfor rahich d<strong>at</strong>a is requested should tally rttith th<strong>at</strong><br />

specifred in ITB clause a.SA(c)<br />

*'( immedi<strong>at</strong>elg preceding the financial Aear in ultich bids are receiued"<br />

# Delete, if pre-qualific<strong>at</strong>ion has been cqrried out<br />

C= A OrJ:0 f= C D:-O<br />