C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang) C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

arunachalpwd.org
from arunachalpwd.org More from this publisher
09.11.2014 Views

'rE QUALIFICATION INFORMATION The information to be hiled in by the Bidder in t1le following O"*"" will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This' information will not be incorporated in the Contract. 1. For Individual Biddcrs 1.1. Constitution or legal status of Bidder (At;tach copU) Place of registration: Principal place of business: Power of attorney of signatory of Bid (Attach/ I.2. Total value of Civil Engineering constmction 2005-2006 B work performed in the last five years** 2006-2047 (in Rs.in lakh) 2OO7-2OO8 2008-2009 2009-20LO 1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the subcontract involved execution of a1i main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name) on works of a similar nature over the last five years.** Project Name Name of the Employer Description of work Contract No, Value of Contract (Rs. Crore) Date of issue of work order Stipulated period of complet -ron Actuai date of completion* Remarks explainmg reasons for delay and work Completed * ** B Attach certificate{s) from the Engineer(s)-in-Charge immediately preceding the financial year in which bids are received Attach certificate from Chartered Accountant. C= O oLJ= O D =O T=- C)

36 #I.3-2. Quantities of work executed as prime contractor, wot'k performed in the past as a nominated sub-contractor, will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name and style) in the last five years: ** Year 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 Name of the work Name of the Employer* Quantity of work performed Fabrication of Fabrication of steel steel superstructure of cable superstructure supported bridge for other type of bridses Remarks (indicate contract Ref) 1..4. Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid' {A} Edsting commitments and on-geing works: Description of works Contract No. Name & Address of Employer Value of Contract {Rs. Cr} Stipulated Period of Cornoletion Value of works* remaining to be completed {Rs. Cr) 2 A a 5 o 7 8 Place & State Anticipated date of completion * Attach certificate(s) from the Engineer(s)-in-Charge @ The item of uorkfor rahich data is requested should tally rttith that specifred in ITB clause a.SA(c) *'( immediatelg preceding the financial Aear in ultich bids are receiued" # Delete, if pre-qualification has been cqrried out C= A OrJ:0 f= C D:-O I .r'

'rE<br />

QUALIFICATION<br />

INFORMATION<br />

The inform<strong>at</strong>ion to be hiled in by the Bidder in t1le following O"*"" will be used for<br />

purposes of post qualific<strong>at</strong>ion as provided for in Clause 4 of the Instructions to Bidders. This'<br />

inform<strong>at</strong>ion will not be incorpor<strong>at</strong>ed in the Contract.<br />

1. For Individual Biddcrs<br />

1.1. Constitution or legal st<strong>at</strong>us of Bidder<br />

(At;tach copU)<br />

Place of registr<strong>at</strong>ion:<br />

Principal place of business:<br />

Power of <strong>at</strong>torney of sign<strong>at</strong>ory of Bid<br />

(Attach/<br />

I.2. Total value of Civil Engineering constmction 2005-2006 B<br />

work performed in the last five years** 2006-2047<br />

(in Rs.in lakh)<br />

2OO7-2OO8<br />

2008-2009<br />

2009-20LO<br />

1.3.1 Work performed as prime contractor, work performed in the past as a<br />

nomin<strong>at</strong>ed sub-contractor will also be considered provided the subcontract<br />

involved execution of a1i main items of work described in the<br />

bid document, provided further th<strong>at</strong> all other qualific<strong>at</strong>ion criteria are<br />

s<strong>at</strong>isfied (in the same name) on works of a similar n<strong>at</strong>ure <strong>over</strong> the last<br />

five years.**<br />

Project<br />

Name<br />

Name of<br />

the<br />

Employer<br />

Description<br />

of<br />

work<br />

Contract<br />

No,<br />

Value of<br />

Contract<br />

(Rs.<br />

Crore)<br />

D<strong>at</strong>e of<br />

issue of<br />

work<br />

order<br />

Stipul<strong>at</strong>ed<br />

period<br />

of<br />

complet<br />

-ron<br />

Actuai<br />

d<strong>at</strong>e of<br />

completion*<br />

Remarks<br />

explainmg<br />

reasons<br />

for delay<br />

and work<br />

Completed<br />

*<br />

**<br />

B<br />

Attach certific<strong>at</strong>e{s) from the Engineer(s)-in-Charge<br />

immedi<strong>at</strong>ely preceding the financial year in which bids are received<br />

Attach certific<strong>at</strong>e from Chartered Accountant.<br />