'rE QUALIFICATION INFORMATION The information to be hiled in by the Bidder in t1le following O"*"" will be used for purposes of post qualification as provided for in Clause 4 of the Instructions to Bidders. This' information will not be incorporated in the Contract. 1. For Individual Biddcrs 1.1. Constitution or legal status of Bidder (At;tach copU) Place of registration: Principal place of business: Power of attorney of signatory of Bid (Attach/ I.2. Total value of Civil Engineering constmction 2005-2006 B work performed in the last five years** 2006-2047 (in Rs.in lakh) 2OO7-2OO8 2008-2009 2009-20LO 1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub-contractor will also be considered provided the subcontract involved execution of a1i main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name) on works of a similar nature over the last five years.** Project Name Name of the Employer Description of work Contract No, Value of Contract (Rs. Crore) Date of issue of work order Stipulated period of complet -ron Actuai date of completion* Remarks explainmg reasons for delay and work Completed * ** B Attach certificate{s) from the Engineer(s)-in-Charge immediately preceding the financial year in which bids are received Attach certificate from Chartered Accountant. C= O oLJ= O D =O T=- C)
36 #I.3-2. Quantities of work executed as prime contractor, wot'k performed in the past as a nominated sub-contractor, will also be considered provided the sub-contract involved execution of all main items of work described in the bid document, provided further that all other qualification criteria are satisfied (in the same name and style) in the last five years: ** Year 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 Name of the work Name of the Employer* Quantity of work performed Fabrication of Fabrication of steel steel superstructure of cable superstructure supported bridge for other type of bridses Remarks (indicate contract Ref) 1..4. Information on Bid Capacity (works for which bids have been submitted and works which are yet to be completed) as on the date of this bid' {A} Edsting commitments and on-geing works: Description of works Contract No. Name & Address of Employer Value of Contract {Rs. Cr} Stipulated Period of Cornoletion Value of works* remaining to be completed {Rs. Cr) 2 A a 5 o 7 8 Place & State Anticipated date of completion * Attach certificate(s) from the Engineer(s)-in-Charge @ The item of uorkfor rahich data is requested should tally rttith that specifred in ITB clause a.SA(c) *'( immediatelg preceding the financial Aear in ultich bids are receiued" # Delete, if pre-qualification has been cqrried out C= A OrJ:0 f= C D:-O I .r'
- Page 1 and 2: GOVERNMENT OF ARUNACHAL PRADESII PU
- Page 3 and 4: lrt t^ffitr l)(w' c--0 O\^J 2 O J=-
- Page 5 and 6: .*natr) I v/>) >., .4 ll.4 lv( i l'
- Page 7 and 8: -- .- f,=- D:b I >-
- Page 9 and 10: o ^M I ,i:-,-_
- Page 11 and 12: 10 SECTION 1 INSTRUCTIONS TO BIDDER
- Page 13 and 14: 1.2 A. GENERAL L 1. 1. r.2. 1.3 2.
- Page 15 and 16: T4 (k) 0) 4.4. 4.5. A. (a) (b) (c)
- Page 17 and 18: c-_ a ow=C I=O D=tl IO 4.7. Bidders
- Page 19 and 20: c-- o OU.l = D l-- o D: t) l8 9. 9.
- Page 21 and 22: 20 13. 13.1 13.2. Bid Prices The co
- Page 23 and 24: C:O Or^l: O (D=b t=- ol 2e (c) in t
- Page 25 and 26: AA z- 23.3. zJ.+ 23.5. 3.6. 23.7. '
- Page 27 and 28: o gN:e Dzb Such adjusteC bid price
- Page 29 and 30: z6 36. 36.1. 37. 37 "r" 37.2" Dispu
- Page 31 and 32: c -bl >C 5 =-t) 30 9. Price level o
- Page 33 and 34: c+b ot^l -o S=-c I--t JZ ' Atntgn R
- Page 35: 34 filoffi I I i.':-',-- C=A c)"^l
- Page 39 and 40: C: O gvJz 0 D: t) I=o 38 1"6" Quali
- Page 41 and 42: gr,tzo DzO L=4 40 SAMPLE FORMAT FOR
- Page 43 and 44: C'-o oul zb D:b T=o 42 UNDERTAKING
- Page 45 and 46: 44 .,tlnffiw v)" I C=A gt^I? O D>O
- Page 47 and 48: I I r.ioN=o D>c f=o 46 t1 at(ilK )"
- Page 49 and 50: 48 Equipment is the Contractor's ma
- Page 51 and 52: OW: O .Dr c T=e 50 8. 8.1. Other Co
- Page 53 and 54: C =.O or.I = D Di o Iio 52 19. 19.1
- Page 55 and 56: 54 28.2 28.3 28.3A. 29. 30. 30.1 31
- Page 57 and 58: 38.2 The Engineer shal1 not adjust
- Page 59 and 60: 58 (d)TheEngineerinstructstheContra
- Page 61 and 62: DJc JzC 60 49.2. 49.3. If the Inten
- Page 63 and 64: g>t^l: O t> =O 58. 58.1 scope gf th
- Page 65 and 66: D =C I--o 64 F. SPE|CIAL CONDITIONS
- Page 67 and 68: 66 i) k) r) m) n) Payment of Bonus
- Page 69 and 70: ig (c) If one of the parties faiis
- Page 71 and 72: 70 Commissioner, Government of Arun
- Page 73 and 74: 72 SECTION 4 CONTRACT DATA c ao o\^
- Page 75 and 76: 74 (Al Road Works Clause Rederemc w
- Page 77 and 78: t) Clause Reference @-to section 3
- Page 79 and 80: C so c)t^): o D=o .L=o 78 :*"Tr["i:
- Page 81 and 82: ii. Equipment 80 9Ao/o fot rler.i.'
- Page 83 and 84: 82 SECTION 5 TDCIINICAL SPECIFICATI
- Page 85 and 86: 84 lrt f)\uffir'\ I V IV V Cr o eul
'rE<br />
QUALIFICATION<br />
INFORMATION<br />
The inform<strong>at</strong>ion to be hiled in by the Bidder in t1le following O"*"" will be used for<br />
purposes of post qualific<strong>at</strong>ion as provided for in Clause 4 of the Instructions to Bidders. This'<br />
inform<strong>at</strong>ion will not be incorpor<strong>at</strong>ed in the Contract.<br />
1. For Individual Biddcrs<br />
1.1. Constitution or legal st<strong>at</strong>us of Bidder<br />
(At;tach copU)<br />
Place of registr<strong>at</strong>ion:<br />
Principal place of business:<br />
Power of <strong>at</strong>torney of sign<strong>at</strong>ory of Bid<br />
(Attach/<br />
I.2. Total value of Civil Engineering constmction 2005-2006 B<br />
work performed in the last five years** 2006-2047<br />
(in Rs.in lakh)<br />
2OO7-2OO8<br />
2008-2009<br />
2009-20LO<br />
1.3.1 Work performed as prime contractor, work performed in the past as a<br />
nomin<strong>at</strong>ed sub-contractor will also be considered provided the subcontract<br />
involved execution of a1i main items of work described in the<br />
bid document, provided further th<strong>at</strong> all other qualific<strong>at</strong>ion criteria are<br />
s<strong>at</strong>isfied (in the same name) on works of a similar n<strong>at</strong>ure <strong>over</strong> the last<br />
five years.**<br />
Project<br />
Name<br />
Name of<br />
the<br />
Employer<br />
Description<br />
of<br />
work<br />
Contract<br />
No,<br />
Value of<br />
Contract<br />
(Rs.<br />
Crore)<br />
D<strong>at</strong>e of<br />
issue of<br />
work<br />
order<br />
Stipul<strong>at</strong>ed<br />
period<br />
of<br />
complet<br />
-ron<br />
Actuai<br />
d<strong>at</strong>e of<br />
completion*<br />
Remarks<br />
explainmg<br />
reasons<br />
for delay<br />
and work<br />
Completed<br />
*<br />
**<br />
B<br />
Attach certific<strong>at</strong>e{s) from the Engineer(s)-in-Charge<br />
immedi<strong>at</strong>ely preceding the financial year in which bids are received<br />
Attach certific<strong>at</strong>e from Chartered Accountant.<br />