09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

c:o ou;:e b=6 J=9<br />

JI<br />

List of Key Plant & Equipment to be deployed on Contract Work<br />

[Reference C|.4.5 (B) (a)]<br />

. ANNEKTIRE.I<br />

sl.<br />

No.<br />

Type of Equipment<br />

Maximum age as<br />

on 01.4.2010<br />

(Years)<br />

Upto Rs.30<br />

crore<br />

Contractor Package Size<br />

Upto Rs.<br />

30-51 crore<br />

Upto Rs.51<br />

crore &<br />

Above<br />

1<br />

I Motor Grader 5 2 J 5<br />

z. Dozer 5 l 2<br />

a<br />

J. Front end Loader 5 2<br />

a<br />

J<br />

4. Smooth Wheeled Roller 5 2 2 3<br />

5. Vibr<strong>at</strong>ory Roller 5 I 2<br />

6. Hot Mix Plant with<br />

5 I 2<br />

Electronic Controls<br />

(Minimum 80-100 TPH)<br />

Paver Finiher with<br />

5 I 2<br />

8.<br />

Electronic Sensor.<br />

W<strong>at</strong>er Tanker 5 z J 4<br />

9. Bifumen Sprayer 5-7 I 2<br />

10. Tandem Roller 5 2 2<br />

tl<br />

t2<br />

Concrete Mixes with<br />

5 I<br />

I Integral weieh B<strong>at</strong>chins.<br />

Concrete B<strong>at</strong>ching and<br />

5 I<br />

Mixing Plan (Minimum<br />

Capacity - l5m3lhours)<br />

Total: t4 18 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!