09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2.<br />

2e<br />

Na:ne of the Employer Chief Engineer (EZ\, Arunachal Pradesh,<br />

PWD.<br />

The [,ast frve years<br />

2OO5 - 2006<br />

APPENDD( to ITB<br />

Cfause Reference<br />

' with reslrcct to<br />

Setim-I.<br />

lcl.1.1l<br />

2006<br />

2007<br />

2008<br />

- 2007<br />

- 2008<br />

- 2009<br />

2009 - 2010<br />

i<br />

3. This annual financial turn <strong>over</strong> amount is R s. 464.87 Lakhs<br />

(Rupees four hundred sixty four lakhs and eighty seven thousand<br />

only)<br />

4. Value of work is Rs. 235.00 Lakhs (Rupees Two hundred thirty<br />

five lakhs only)<br />

5. Quantities of work are:<br />

Earth work in F/C<br />

[C1.a.sA(a)]<br />

lc1.4.sA(b)l<br />

[C1.a.sA(c)]<br />

150O.00 cum<br />

ii<br />

E/W in excav<strong>at</strong>ion in trenches<br />

1845.O0 cum<br />

iii Plain RCC M-25<br />

iv PCC 1:3:6<br />

225.71c:uIJ]<br />

17.5O Sqm<br />

v<br />

vi<br />

vii<br />

viii<br />

ix<br />

X<br />

xi<br />

6.<br />

7.<br />

Design fabric<strong>at</strong>ion & steel<br />

Taking delivery /Erection of steel <strong>Arch</strong> bridge<br />

HYSD Bar<br />

RCC Approach slab<br />

Copper pl<strong>at</strong>e expansion joints<br />

Black filling<br />

<strong>Steel</strong> Rocker bearing<br />

The cost of electric work is Rs. NA<br />

The cost of w<strong>at</strong>er supply/sanitary works is Rs._ NA<br />

(In works).<br />

356.22 MT<br />

356.22 MT<br />

34.20 MT<br />

162.00 cum<br />

1O mtr<br />

1O4.00 cum<br />

(8Ox8O) Tone capacity<br />

lc1.4.sA(d)l<br />

Ic1.a.sA(e)]<br />

8.<br />

Liquid assets and/or availability of credit facilities is Rs. 50.00<br />

takh (Rupees Fifty lakhs) only.<br />

[C1.a.sB(c )]<br />

C =C Drja o -I=o b>- e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!