C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

c-- o OU.l = D l-- o D: t)<br />

l8<br />

9.<br />

9.1.<br />

9.2<br />

9.2.r.<br />

9.2.2.<br />

9.2.3.<br />

9.2"4.<br />

9.2.5.<br />

Clarific<strong>at</strong>ion of Biddirg Documents .<br />

A prospective bidder requiring any clarific<strong>at</strong>ion of the bidding documents may<br />

notify ine employer in writing oi ty cable (hereinafter "cablen includes telex<br />

and iacsimile) <strong>at</strong> lfr" g.,,ptoy=f" rddt =. indic'<strong>at</strong>ed in th€ invit<strong>at</strong>ion to bid. The<br />

Employer wili respond to any request for clarific<strong>at</strong>ion which he received earlier<br />

ttut iS days prior to the dea-diine for submission of bids. Copies of the<br />

Employer,s response will be forwarded to all purchasers of ttre bidding<br />

doclments, inciuding a description of the enquiry but without identifying its<br />

source.<br />

Pre_bid _sgring<br />

The bidder or his official represent<strong>at</strong>ive is invited to <strong>at</strong>tend a pre-bid megting<br />

which will take place <strong>at</strong> the address, venue, time and d<strong>at</strong>e as indic<strong>at</strong>ed in<br />

appendix.<br />

The purpose of the meeting will be to clarify issues and to answer questions on<br />

any m<strong>at</strong>ter th<strong>at</strong> may be raised <strong>at</strong> th<strong>at</strong> stage'<br />

The bidder is requested to submit any questions in writing or by cable to reach<br />

tJle employet ttoi l<strong>at</strong>er than one week before the meeting'<br />

Minutes of the meeting, including the text of the questions raised (without<br />

identifying the source Ji mquiry)<br />

"ttd the responses given will be transmitted<br />

without delay to all purctraslrs or the bidding documents. Any modific<strong>at</strong>ion of<br />

the bidding do..r-.ttts listed in Sub-Clause 8.1 which may become necessalJr<br />

as a result of the pre-bid meeting shall be made by the Employer exclusively<br />

through the issue of an Addendum pursuant to clause 10 and not through<br />

the minutes of the pre-bid meeting.<br />

Non- <strong>at</strong>tendance <strong>at</strong> the pre-bid meeting will not be a cause for disqualific<strong>at</strong>ion<br />

of a bidder.<br />

10.<br />

10.1<br />

Amendment<br />

of Bidding Documents<br />

Before the deadline for submission of bids, the Employer may modify the<br />

bidding documents by issuing addenda'<br />

r4.2.<br />

10.3.<br />

Any addendum thus issued shall be part of the bidding documents and shall<br />

be communic<strong>at</strong>ed in writing or by to all the purchasers of the bidding<br />

""bt"<br />

documents. Prospective bidler" acknowledge receipt of each addendum<br />

"ft<strong>at</strong><br />

in writing or by cable to the Employer. The Employer will assume no<br />

responsibility for postal delays.<br />

To give prospective bidders reasonable time in which to take an addendum<br />

into account in preparing their bids, the Employer may, <strong>at</strong> his discretion,<br />

extend u." .r".=""'rry the Ieadline for submission of bids, in accordance with<br />

Sub-Clause 2O.2 below.<br />

I<br />

i<br />

i<br />

.r