C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
I7<br />
6.<br />
6.1.<br />
7.<br />
7.1.<br />
Cost of Bidding<br />
The bidder shall bear all costs associ<strong>at</strong>ed with the prepar<strong>at</strong>ion and submission of his<br />
Rirt, and tfus ]rrnFloyer udlf in no case be responsibtre and liahle for th.ose costs.<br />
Site Visit<br />
The Bidder, <strong>at</strong> the Bidder's own responsibility and risk is encouraged to visit and<br />
examine the Site of Works and its surroundings and obtain all inform<strong>at</strong>ion th<strong>at</strong> may<br />
be necessar5r for preparing the Bid and entering into a contract for construction of the<br />
Works. The costs of visitingthe Site shallbe <strong>at</strong> the Bidder's own expense.<br />
B. BIDDING DOCUMENTS<br />
8.<br />
8.1.<br />
Content of Bidding Documents<br />
The set of bidding documents comprises the documents listed below and addenda<br />
issued in accordance with Clause 10:<br />
Section<br />
Invit<strong>at</strong>ion for Bids<br />
P<strong>at</strong>ticulars<br />
Votume<br />
No.<br />
Instmctions<br />
to Bidders<br />
I<br />
2 Quaiific<strong>at</strong>ion Inform<strong>at</strong>ion, and other forms<br />
2<br />
Conditions of Contract<br />
4 Contract d<strong>at</strong>a<br />
5 Technical Snecific<strong>at</strong>ion II<br />
6 Form of bid III<br />
ry<br />
Bill of Quantities<br />
8 Securities and other forms<br />
9 Drawings ry<br />
10 Documents to be furnished bv bidder<br />
I,7<br />
8.2.<br />
One copy of each of the volumes I, II, III and IV will be issued to the bidder.<br />
Documents to be furnished by the bidder in compliance to section 2 will be prepared<br />
by him and furnished as Volume-V in two parts (refer clause l2).<br />
8.3.<br />
The bidder is expected to examine carefully all instructions, conditions of contract,<br />
contract d<strong>at</strong>a, forms, terms, technical specific<strong>at</strong>ions, bill of quantities, forms, Annexes<br />
and drawings in the Bid Document. Failure to comply with the requirements of Bid<br />
Documents shall be <strong>at</strong> the bidder's own risk. Pursuant to clause 26 hereof , bids which<br />
are not substantially responsive to tlee requireneents of the Bid Documents shall be<br />
c= o ot/:o ]=0 D-O