09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

I7<br />

6.<br />

6.1.<br />

7.<br />

7.1.<br />

Cost of Bidding<br />

The bidder shall bear all costs associ<strong>at</strong>ed with the prepar<strong>at</strong>ion and submission of his<br />

Rirt, and tfus ]rrnFloyer udlf in no case be responsibtre and liahle for th.ose costs.<br />

Site Visit<br />

The Bidder, <strong>at</strong> the Bidder's own responsibility and risk is encouraged to visit and<br />

examine the Site of Works and its surroundings and obtain all inform<strong>at</strong>ion th<strong>at</strong> may<br />

be necessar5r for preparing the Bid and entering into a contract for construction of the<br />

Works. The costs of visitingthe Site shallbe <strong>at</strong> the Bidder's own expense.<br />

B. BIDDING DOCUMENTS<br />

8.<br />

8.1.<br />

Content of Bidding Documents<br />

The set of bidding documents comprises the documents listed below and addenda<br />

issued in accordance with Clause 10:<br />

Section<br />

Invit<strong>at</strong>ion for Bids<br />

P<strong>at</strong>ticulars<br />

Votume<br />

No.<br />

Instmctions<br />

to Bidders<br />

I<br />

2 Quaiific<strong>at</strong>ion Inform<strong>at</strong>ion, and other forms<br />

2<br />

Conditions of Contract<br />

4 Contract d<strong>at</strong>a<br />

5 Technical Snecific<strong>at</strong>ion II<br />

6 Form of bid III<br />

ry<br />

Bill of Quantities<br />

8 Securities and other forms<br />

9 Drawings ry<br />

10 Documents to be furnished bv bidder<br />

I,7<br />

8.2.<br />

One copy of each of the volumes I, II, III and IV will be issued to the bidder.<br />

Documents to be furnished by the bidder in compliance to section 2 will be prepared<br />

by him and furnished as Volume-V in two parts (refer clause l2).<br />

8.3.<br />

The bidder is expected to examine carefully all instructions, conditions of contract,<br />

contract d<strong>at</strong>a, forms, terms, technical specific<strong>at</strong>ions, bill of quantities, forms, Annexes<br />

and drawings in the Bid Document. Failure to comply with the requirements of Bid<br />

Documents shall be <strong>at</strong> the bidder's own risk. Pursuant to clause 26 hereof , bids which<br />

are not substantially responsive to tlee requireneents of the Bid Documents shall be<br />

c= o ot/:o ]=0 D-O

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!