C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
l5<br />
.(d)<br />
*(e)<br />
The contractor or his identified sub-contractor 9Kouldft>ossess.requiredrvalid<br />
electrical license for executing the building g%ctnfic<strong>at</strong>ftn works andXhould<br />
have executed similar electrical works for:fminimum nt as indic<strong>at</strong>ed in<br />
Appendix in anyone year.<br />
./<br />
\ KryZ ./<br />
The contractor or his identifi<br />
license for executing the w<strong>at</strong>eSAupptylsq&dry<br />
"a/-.ont.q"\q€/h;ufa<br />
rydss required valid<br />
engindnng works and should<br />
have executed similar vrter suppty#anitary supply#anitary /n$neering ,figrneering works for a<br />
minimum amount as i in Appendix in aryfone year.<br />
B.<br />
Each bidder should further demonstr<strong>at</strong>e:<br />
(a)<br />
availability (either owned or leased or by procurement against mobiliz<strong>at</strong>ion<br />
advances) of the following key and critical equipment for this work:<br />
[Note: Special equipment for the specialized job available are to be indic<strong>at</strong>ed].<br />
Based on the studies, carried out by the Engineer the minimum suggested<br />
major equipment to <strong>at</strong>tain the completion of works il accordance with the<br />
prescribed construction schedule are shown in the Aanexure-I.<br />
The bidders should, however, underlake their own studies and furnish with<br />
their bid, a detailed construction planning and methodolory supported with<br />
layout and necessary drawings and calcul<strong>at</strong>ions (detailed) as st<strong>at</strong>ed in clause<br />
4.3 (1) above to allow the employer to review their proposals. The numbers,<br />
types and capacities of each plant/equipment shall be shown in the proposals<br />
along with the cycle time for each oper<strong>at</strong>ion for tJ:e given production capacity<br />
to m<strong>at</strong>ch the requirements.<br />
(b)<br />
(c)<br />
availability for this work of personnel with adequ<strong>at</strong>e experience as required; as<br />
per Aasure{I.<br />
liquid assets and/or availability of credit facilities of not less than amount<br />
indic<strong>at</strong>ed in Appendix<br />
(Credit lines/letter of credit/certific<strong>at</strong>es from Banks for meeting the funds<br />
requirement etc. -usually the equivalent of the estim<strong>at</strong>ed cash flow for 3<br />
months in peak construction period.)<br />
C. To qualify for a package of contracts made up of this and other contracts<br />
for which bids are invited in the IFB, the bidder must demonstr<strong>at</strong>e having<br />
experience and resources suflicient to meet the aggreg<strong>at</strong>e of the qualifying<br />
criteria for the individual contracts.<br />
4.6. Sub-contractors' experience and resources shall not be taken into account in<br />
determining the bidder's compliance with the qualifying criteria except to the<br />
extent st<strong>at</strong>ed in 4.5 (A) above.<br />
* Delete, if not applicable.<br />
c>o ow> e I=a D_ o/