l5<br />

.(d)<br />

*(e)<br />

The contractor or his identified sub-contractor 9Kouldft>ossess.requiredrvalid<br />

electrical license for executing the building g%ctnfic<strong>at</strong>ftn works andXhould<br />

have executed similar electrical works for:fminimum nt as indic<strong>at</strong>ed in<br />

Appendix in anyone year.<br />

./<br />

\ KryZ ./<br />

The contractor or his identifi<br />

license for executing the w<strong>at</strong>eSAupptylsq&dry<br />

"a/-.ont.q"\q€/h;ufa<br />

rydss required valid<br />

engindnng works and should<br />

have executed similar vrter suppty#anitary supply#anitary /n$neering ,figrneering works for a<br />

minimum amount as i in Appendix in aryfone year.<br />

B.<br />

Each bidder should further demonstr<strong>at</strong>e:<br />

(a)<br />

availability (either owned or leased or by procurement against mobiliz<strong>at</strong>ion<br />

advances) of the following key and critical equipment for this work:<br />

[Note: Special equipment for the specialized job available are to be indic<strong>at</strong>ed].<br />

Based on the studies, carried out by the Engineer the minimum suggested<br />

major equipment to <strong>at</strong>tain the completion of works il accordance with the<br />

prescribed construction schedule are shown in the Aanexure-I.<br />

The bidders should, however, underlake their own studies and furnish with<br />

their bid, a detailed construction planning and methodolory supported with<br />

layout and necessary drawings and calcul<strong>at</strong>ions (detailed) as st<strong>at</strong>ed in clause<br />

4.3 (1) above to allow the employer to review their proposals. The numbers,<br />

types and capacities of each plant/equipment shall be shown in the proposals<br />

along with the cycle time for each oper<strong>at</strong>ion for tJ:e given production capacity<br />

to m<strong>at</strong>ch the requirements.<br />

(b)<br />

(c)<br />

availability for this work of personnel with adequ<strong>at</strong>e experience as required; as<br />

per Aasure{I.<br />

liquid assets and/or availability of credit facilities of not less than amount<br />

indic<strong>at</strong>ed in Appendix<br />

(Credit lines/letter of credit/certific<strong>at</strong>es from Banks for meeting the funds<br />

requirement etc. -usually the equivalent of the estim<strong>at</strong>ed cash flow for 3<br />

months in peak construction period.)<br />

C. To qualify for a package of contracts made up of this and other contracts<br />

for which bids are invited in the IFB, the bidder must demonstr<strong>at</strong>e having<br />

experience and resources suflicient to meet the aggreg<strong>at</strong>e of the qualifying<br />

criteria for the individual contracts.<br />

4.6. Sub-contractors' experience and resources shall not be taken into account in<br />

determining the bidder's compliance with the qualifying criteria except to the<br />

extent st<strong>at</strong>ed in 4.5 (A) above.<br />