09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1= C) ON =_e 9:Q T =-b<br />

"1<br />

Aqreement Form<br />

Agreement<br />

This<br />

agreement,<br />

lname<br />

made the day of between<br />

and address of Employer) [hereinafter called "the Employer] and<br />

(name and address of contractor) hereinafter called "the Contractor' of the other part.<br />

Whereas the Employer is desirous th<strong>at</strong> the Contractor execute<br />

(name and identific<strong>at</strong>ion number of Contract) (hereinafter<br />

Employer has accepted the Bid by the Contractor for the<br />

such Works and the remedying of any defects<br />

Rs.<br />

NOW THIS AGREEMENT WITHNESSETH as follows:<br />

called "the Works") and tJle<br />

execution and completion of<br />

therein, <strong>at</strong> a cost of<br />

I<br />

l. In this Agreement, words and expression shall have the same meanings as are<br />

respectively assigned to them in the conditions of contract hereinaJter referred to<br />

and they shall be deemed to fmr-arrd he read and constr.ucted as part oflbis.<br />

Agreement.<br />

2.<br />

In consider<strong>at</strong>ion of the payments to be made by the Employer to the Contractor as<br />

hereinafter mentioned, the Contractor hereby covenants with the Employer to<br />

execute and complete the Works and remedy any defects therein in conformity in all<br />

aspects with the provisions of the contract.<br />

The Employer hereby covenants to pay the Contractor in consider<strong>at</strong>ion of the<br />

execution and completion of the Works and the remedying the defects wherein<br />

Contract Price or such other sum as may become payable under the provisions of<br />

the Contract <strong>at</strong> the times and in the manner prescribed by the Contract.<br />

4. The following documents shall be deemed to form and be ready and constructed as<br />

part of this Agreement viz.<br />

(i) Letter of Acceptance<br />

(ii) Notice to proceed with the works;<br />

(iii) Contractor's Bid<br />

(iv) Condition of Contract: General and Special<br />

(v) Contract D<strong>at</strong>a<br />

(vi) Additionaicondition<br />

(vii) Drawings<br />

(viii) Bill of Quantities and<br />

(i*) Any other documents listed in the Contract D<strong>at</strong>a as forming part of the<br />

Contract.<br />

In witnessed whereof the parties there to have caused this Agreement to be<br />

executed the day and year first before written.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!