C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1= C) ON =_e 9:Q T =-b<br />
"1<br />
Aqreement Form<br />
Agreement<br />
This<br />
agreement,<br />
lname<br />
made the day of between<br />
and address of Employer) [hereinafter called "the Employer] and<br />
(name and address of contractor) hereinafter called "the Contractor' of the other part.<br />
Whereas the Employer is desirous th<strong>at</strong> the Contractor execute<br />
(name and identific<strong>at</strong>ion number of Contract) (hereinafter<br />
Employer has accepted the Bid by the Contractor for the<br />
such Works and the remedying of any defects<br />
Rs.<br />
NOW THIS AGREEMENT WITHNESSETH as follows:<br />
called "the Works") and tJle<br />
execution and completion of<br />
therein, <strong>at</strong> a cost of<br />
I<br />
l. In this Agreement, words and expression shall have the same meanings as are<br />
respectively assigned to them in the conditions of contract hereinaJter referred to<br />
and they shall be deemed to fmr-arrd he read and constr.ucted as part oflbis.<br />
Agreement.<br />
2.<br />
In consider<strong>at</strong>ion of the payments to be made by the Employer to the Contractor as<br />
hereinafter mentioned, the Contractor hereby covenants with the Employer to<br />
execute and complete the Works and remedy any defects therein in conformity in all<br />
aspects with the provisions of the contract.<br />
The Employer hereby covenants to pay the Contractor in consider<strong>at</strong>ion of the<br />
execution and completion of the Works and the remedying the defects wherein<br />
Contract Price or such other sum as may become payable under the provisions of<br />
the Contract <strong>at</strong> the times and in the manner prescribed by the Contract.<br />
4. The following documents shall be deemed to form and be ready and constructed as<br />
part of this Agreement viz.<br />
(i) Letter of Acceptance<br />
(ii) Notice to proceed with the works;<br />
(iii) Contractor's Bid<br />
(iv) Condition of Contract: General and Special<br />
(v) Contract D<strong>at</strong>a<br />
(vi) Additionaicondition<br />
(vii) Drawings<br />
(viii) Bill of Quantities and<br />
(i*) Any other documents listed in the Contract D<strong>at</strong>a as forming part of the<br />
Contract.<br />
In witnessed whereof the parties there to have caused this Agreement to be<br />
executed the day and year first before written.