o l/ Tl rc.3e (l 4. A pre-bid meeting will be held on e8-C I -aDtC <strong>at</strong>"1130 hrs in the office of the Superintending Engineer, Boleng Circle, PWD, AP, Boleng to clarify the issues and to answer questions on any m<strong>at</strong>ter th<strong>at</strong> may be raised <strong>at</strong> th<strong>at</strong> stage as st<strong>at</strong>ed in Clause 9.2 of "Instructions to Bidders" of the docrrn*errt. 5. The bidder who fulfills the following initial requirements shall only be eligible to parficip<strong>at</strong>e. (a) Experience of having succes#ully completed one similar work of aggreg<strong>at</strong>e cost not less than Rs 235.00 Lakhs during the last 5 years ending last day of Jurre 2010. (b) Should have had an annual financial turn <strong>over</strong> in civil engineering construction works in anv one year during th.e last five (5) vears ending March, 2010 of value Rs. 665.00 Lakhs. 6. The bidder will have to produce no due certific<strong>at</strong>e (NDC)/ no objection certific<strong>at</strong>e (NOC) from the Arunachal Pradesh St<strong>at</strong>e Co-oper<strong>at</strong>ive Apex Bank T imited, duly issued by the Managing Director cum Chief Executive Officer, Itanagar h order to particip<strong>at</strong>e. 7. Other details and other documents to be submitted will be as described in the bidding document. 8. Ttte bidder, <strong>at</strong> the bidder's own responsibility and risk is encouraged to visit the project site and obtain necessary inform<strong>at</strong>ion rel<strong>at</strong>ed to it to facilit<strong>at</strong>e prepar<strong>at</strong>ion of the bid. 9. The inform<strong>at</strong>ion/don'ments mentioned in (5), (6) and (4 above should be submitted in an orderly manner as and where required by indexing them as detailed in the relevant section(s) of *re bidding document" The guarmrtees, certific<strong>at</strong>es, etc from bank(s) and other authorities and other inform<strong>at</strong>ion shall be furnished as per the standard forms given in the relevant section (s) of the bidding document. Copy to: Executive Engineer Mariyang Division, PWD, AP Mariyang 1) The PS to Hon'ble Minister (PWD), for inform<strong>at</strong>ion of HM (PWD). 2) The Principal Secretary €WD), Govt. of Arunachal Pradesh, Itanagar for inform<strong>at</strong>ion. 3) The Resident Commissioner, New Delhi/ Kolk<strong>at</strong>a for inform<strong>at</strong>ion & wide publicity. 4) The Dy. Resident Commissioner, Guwah<strong>at</strong>i, Assam/ Shillong , Meghalaya for inform<strong>at</strong>ion & wide publicity. 5) Theehief Engineer, Western Zone, PWD AP, Itanagar, forinfurm<strong>at</strong>ion and publicity. 6) The Chief Engineer, Design & Planning, PWD, AP, Itanagar, for inform<strong>at</strong>ion and publicity. n The Chief Engineer, Central Zone,PWD, AP, Itanagar, for inform<strong>at</strong>ion and publicity. 8) The Director, Department of Inform<strong>at</strong>ion & Public Rel<strong>at</strong>ions, G<strong>over</strong>nrnent of Arunachal Pradesh,Itanagar with a request to publish this notice in two local dailies on or before and to forward the necessary bills to this office for payment. 9) The Superintending Engineer, Boleng Circle, PWD,AP, Boleng ,for inform<strong>at</strong>ion, and necessary action. . 10) The Executive Engineer, Mariyang Division, PWD, AP, Mariyang for inform<strong>at</strong>ion and necessary action. 11) The Deputy Commissioner, Upper Siang for inform<strong>at</strong>ion and wide publicity" 12) Notice Board. 13) Web site wrvw.arunachalpwd.org. In charge of IT Centre, Eastern Zone, PWD shall hoist/publish it in the official website of the A.P.P.W.D. 14) Web site www.mdoner.gpv.in. Executive Engirteer Marivang Division, PWD, AP Mariyang c: ol ohi >O I=Ot D:-O
10 SECTION 1 INSTRUCTIONS TO BIDDERS I' I t-- -.i':- e= O O\^t:-O .f=O g>t>
- Page 1 and 2: GOVERNMENT OF ARUNACHAL PRADESII PU
- Page 3 and 4: lrt t^ffitr l)(w' c--0 O\^J 2 O J=-
- Page 5 and 6: .*natr) I v/>) >., .4 ll.4 lv( i l'
- Page 7 and 8: -- .- f,=- D:b I >-
- Page 9: o ^M I ,i:-,-_
- Page 13 and 14: 1.2 A. GENERAL L 1. 1. r.2. 1.3 2.
- Page 15 and 16: T4 (k) 0) 4.4. 4.5. A. (a) (b) (c)
- Page 17 and 18: c-_ a ow=C I=O D=tl IO 4.7. Bidders
- Page 19 and 20: c-- o OU.l = D l-- o D: t) l8 9. 9.
- Page 21 and 22: 20 13. 13.1 13.2. Bid Prices The co
- Page 23 and 24: C:O Or^l: O (D=b t=- ol 2e (c) in t
- Page 25 and 26: AA z- 23.3. zJ.+ 23.5. 3.6. 23.7. '
- Page 27 and 28: o gN:e Dzb Such adjusteC bid price
- Page 29 and 30: z6 36. 36.1. 37. 37 "r" 37.2" Dispu
- Page 31 and 32: c -bl >C 5 =-t) 30 9. Price level o
- Page 33 and 34: c+b ot^l -o S=-c I--t JZ ' Atntgn R
- Page 35 and 36: 34 filoffi I I i.':-',-- C=A c)"^l
- Page 37 and 38: 36 #I.3-2. Quantities of work execu
- Page 39 and 40: C: O gvJz 0 D: t) I=o 38 1"6" Quali
- Page 41 and 42: gr,tzo DzO L=4 40 SAMPLE FORMAT FOR
- Page 43 and 44: C'-o oul zb D:b T=o 42 UNDERTAKING
- Page 45 and 46: 44 .,tlnffiw v)" I C=A gt^I? O D>O
- Page 47 and 48: I I r.ioN=o D>c f=o 46 t1 at(ilK )"
- Page 49 and 50: 48 Equipment is the Contractor's ma
- Page 51 and 52: OW: O .Dr c T=e 50 8. 8.1. Other Co
- Page 53 and 54: C =.O or.I = D Di o Iio 52 19. 19.1
- Page 55 and 56: 54 28.2 28.3 28.3A. 29. 30. 30.1 31
- Page 57 and 58: 38.2 The Engineer shal1 not adjust
- Page 59 and 60: 58 (d)TheEngineerinstructstheContra
- Page 61 and 62:
DJc JzC 60 49.2. 49.3. If the Inten
- Page 63 and 64:
g>t^l: O t> =O 58. 58.1 scope gf th
- Page 65 and 66:
D =C I--o 64 F. SPE|CIAL CONDITIONS
- Page 67 and 68:
66 i) k) r) m) n) Payment of Bonus
- Page 69 and 70:
ig (c) If one of the parties faiis
- Page 71 and 72:
70 Commissioner, Government of Arun
- Page 73 and 74:
72 SECTION 4 CONTRACT DATA c ao o\^
- Page 75 and 76:
74 (Al Road Works Clause Rederemc w
- Page 77 and 78:
t) Clause Reference @-to section 3
- Page 79 and 80:
C so c)t^): o D=o .L=o 78 :*"Tr["i:
- Page 81 and 82:
ii. Equipment 80 9Ao/o fot rler.i.'
- Page 83 and 84:
82 SECTION 5 TDCIINICAL SPECIFICATI
- Page 85 and 86:
84 lrt f)\uffir'\ I V IV V Cr o eul
- Page 87 and 88:
c,=.b outzg D=o Do 86 llrr A /l tl
- Page 89 and 90:
c>b P>0 f=P 88 6. We accept the app
- Page 91 and 92:
Ca o g t^}"-o D=0 I=a 90 ,j,',
- Page 93 and 94:
9'2 (,)lnfrw l0 ))" V I I CtA gr,Ie
- Page 95 and 96:
94 (illnffiw l!)' C-?t] ClvJ:O D=o
- Page 97 and 98:
" '14- / :; :,1. : .- . -,' : '-: :
- Page 99 and 100:
98 ^lr( n nfn ll n\ a^ll?,))t)'" |
- Page 101 and 102:
100 This Guarantee will remain in f
- Page 103 and 104:
o2 I ṭk= Cac ON:O D :-O IrO A
- Page 105 and 106:
104 I C, >c gt^i+_b D:c D=P
- Page 107 and 108:
(s) forthwith replace the sarne wit
- Page 109 and 110:
C=r] OWz O D=O ftC; 108 ^flr( aliaf
- Page 111 and 112:
c-r-o $$Je s D=O c fr/\ 1 ( _.
- Page 113 and 114:
l LZ franW C=O gw=o D:O )=e ; ''/^
- Page 115 and 116:
C zb euf >O D=O Ll4 The Common Seal
- Page 117 and 118:
lt6 \loffiW C=O OuI+P D=C ft' l 'L
- Page 119 and 120:
i18 ^rw glaffiy, C :O P aO \ '1r* L
- Page 121 and 122:
124 ^l1r( 11 r'tffi ll rr) a^llu)u'
- Page 123:
t2'2 lln .')alaffiru lT\il&r)>' I L