09.11.2014 Views

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

C/o Motorable Steel Arch Bridge over river Yamne at Reglat (Bysang)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

o<br />

l/<br />

Tl rc.3e (l<br />

4. A pre-bid meeting will be held on e8-C I -aDtC <strong>at</strong>"1130 hrs in the office of the Superintending<br />

Engineer, Boleng Circle, PWD, AP, Boleng to clarify the issues and to answer questions on any<br />

m<strong>at</strong>ter th<strong>at</strong> may be raised <strong>at</strong> th<strong>at</strong> stage as st<strong>at</strong>ed in Clause 9.2 of "Instructions to Bidders" of the<br />

docrrn*errt.<br />

5. The bidder who fulfills the following initial requirements shall only be eligible to parficip<strong>at</strong>e.<br />

(a) Experience of having succes#ully completed one similar work of aggreg<strong>at</strong>e cost not less than Rs<br />

235.00 Lakhs during the last 5 years ending last day of Jurre 2010.<br />

(b) Should have had an annual financial turn <strong>over</strong> in civil engineering construction works in anv<br />

one year during th.e last five (5) vears ending March, 2010 of value Rs. 665.00 Lakhs.<br />

6. The bidder will have to produce no due certific<strong>at</strong>e (NDC)/ no objection certific<strong>at</strong>e (NOC) from the<br />

Arunachal Pradesh St<strong>at</strong>e Co-oper<strong>at</strong>ive Apex Bank T imited, duly issued by the Managing Director<br />

cum Chief Executive Officer, Itanagar h order to particip<strong>at</strong>e.<br />

7. Other details and other documents to be submitted will be as described in the bidding document.<br />

8. Ttte bidder, <strong>at</strong> the bidder's own responsibility and risk is encouraged to visit the project site and<br />

obtain necessary inform<strong>at</strong>ion rel<strong>at</strong>ed to it to facilit<strong>at</strong>e prepar<strong>at</strong>ion of the bid.<br />

9. The inform<strong>at</strong>ion/don'ments mentioned in (5), (6) and (4 above should be submitted in an orderly<br />

manner as and where required by indexing them as detailed in the relevant section(s) of *re bidding<br />

document" The guarmrtees, certific<strong>at</strong>es, etc from bank(s) and other authorities and other inform<strong>at</strong>ion<br />

shall be furnished as per the standard forms given in the relevant section (s) of the bidding document.<br />

Copy to:<br />

Executive Engineer<br />

Mariyang Division, PWD, AP<br />

Mariyang<br />

1) The PS to Hon'ble Minister (PWD), for inform<strong>at</strong>ion of HM (PWD).<br />

2) The Principal Secretary €WD), Govt. of Arunachal Pradesh, Itanagar for inform<strong>at</strong>ion.<br />

3) The Resident Commissioner, New Delhi/ Kolk<strong>at</strong>a for inform<strong>at</strong>ion & wide publicity.<br />

4) The Dy. Resident Commissioner, Guwah<strong>at</strong>i, Assam/ Shillong , Meghalaya for inform<strong>at</strong>ion<br />

& wide publicity.<br />

5) Theehief Engineer, Western Zone, PWD AP, Itanagar, forinfurm<strong>at</strong>ion and publicity.<br />

6) The Chief Engineer, Design & Planning, PWD, AP, Itanagar, for inform<strong>at</strong>ion and publicity.<br />

n The Chief Engineer, Central Zone,PWD, AP, Itanagar, for inform<strong>at</strong>ion and publicity.<br />

8) The Director, Department of Inform<strong>at</strong>ion & Public Rel<strong>at</strong>ions, G<strong>over</strong>nrnent of Arunachal<br />

Pradesh,Itanagar with a request to publish this notice in two local dailies on or before<br />

and to forward the necessary bills to this office for payment.<br />

9) The Superintending Engineer, Boleng Circle, PWD,AP, Boleng ,for inform<strong>at</strong>ion, and<br />

necessary action. .<br />

10) The Executive Engineer, Mariyang Division, PWD, AP, Mariyang for inform<strong>at</strong>ion and<br />

necessary action.<br />

11) The Deputy Commissioner, Upper Siang for inform<strong>at</strong>ion and wide publicity"<br />

12) Notice Board.<br />

13) Web site wrvw.arunachalpwd.org. In charge of IT Centre, Eastern Zone, PWD shall<br />

hoist/publish it in the official website of the A.P.P.W.D.<br />

14) Web site www.mdoner.gpv.in.<br />

Executive Engirteer<br />

Marivang Division, PWD, AP<br />

Mariyang<br />

c: ol ohi >O I=Ot D:-O

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!