ANNUAL REPORT <strong>2011</strong>-<strong>12</strong><br />

NOTES FORMING PART OF BALANCE SHEET<br />

NOTE NO. - 15<br />

INVENTORIES<br />

(As certified by the Management)<br />

Raw Materials & Components 7594.20 6383.34<br />

Less: Provision 1482.78 1731.47<br />

Less: Stock Adjustment 0.00 6111.42 65.56 4586.31<br />

Stores, Spares & Components including Construction Materials 1394.51 1028.70<br />

Less: Provision / Stock Adjustment 229.85 1164.66 343.41 685.29<br />

Goods-in-Transit/ Under inspection 4250.28 2160.57<br />

Less: Provision 259.52 3990.76 259.51 1901.06<br />

Loose Tools, Drawing Instruments etc. 1322.11 982.20<br />

Less: Provision 43.88 <strong>12</strong>78.23 46.87 935.33<br />

Stock of Finished Products 811.53 446.92<br />

Less: Provision 44.04 767.49 39.36 407.56<br />

Work-In-Progress 11844.95 9513.28<br />

Less: Provision <strong>12</strong>8.50 11716.45 79.41 9433.87<br />

Work-In-Progress (Turnkey Project) 2345.80 5505.95<br />

Less: Provision 0.00 2345.80 0.00 5505.95<br />

Discarded Assets 3.52 3.52<br />

Less: Provision 3.52 0.00 3.52 0.00<br />

Total Inventory 29566.90 26024.48<br />

Less: Provision 2192.09 2503.55<br />

Less: Stock Adjustment 0.00 27374.81 65.56 23455.37<br />

TOTAL 27374.81 23455.37<br />

Notes:<br />

1. Finished Stock & WIP includes items worth ` 35.<strong>12</strong> Lakh (Previous Year ` 35.<strong>12</strong> L) against closed, cancelled & old work orders which has been<br />

valued at scrap rates.<br />

2. Non-Moving Raw Materials and Stores & Spares for more than 3 yrs are ` 1781.90Lakh (Previous Year ` 2039.54 L). The existing is provision is<br />

considered adequate.<br />

3. Goods In Transit includes CV Duty ` 14.18Lakh (Previous Year ` 220.35 L)<br />

4. Raw Materials & Components including scrap at shop floor ` 70.43Lakh (Previous Year ` 65.25 L)<br />

` in Lakhs<br />

AS AT 31.03.20<strong>12</strong> AS AT 31.03.<strong>2011</strong><br />

34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!