annual report 2011-12 - Heavy Engineering Corporation Limited

annual report 2011-12 - Heavy Engineering Corporation Limited annual report 2011-12 - Heavy Engineering Corporation Limited

09.11.2014 Views

ANNUAL REPORT 2011-12 NOTES FORMING PART OF BALANCE SHEET ` in Lakhs AS AT 31.03.2012 AS AT 31.03.2011 NOTE NO. - 13 LONG TERM LOANS & ADVANCES Loans & Advances Advances & other amounts recoverable in cash or in kind or for value to be received (including cost of materials supplied to the contractors, outside parties and/ or pending adjustment) Unsecured Considered Good 915.25 898.54 Deposits Deposits with Private Parties 2.28 2.25 Deposits with Government Authorities 651.01 632.76 Security deposit of Staff and Contractors as per contra in Note -3 0.86 654.15 0.81 635.82 Others Advances to Employees 74.25 93.95 Claims Receivable 85.76 50.40 Income Tax deducted at source 472.83 325.23 SUB TOTAL 2202.24 2003.94 Less: Provision for bad &doubtful Advances 772.87 938.93 TOTAL 1429.37 1065.01 32

ANNUAL REPORT 2011-12 NOTES FORMING PART OF BALANCE SHEET ` in Lakhs AS AT 31.03.2012 AS AT 31.03.2011 NOTE NO. - 14 OTHER NON-CURRENT ASSETS Long Term Trade Receivables (A) Public Sector & Govt. Deptt. Considered Good 20276.38 26410.57 Considered Doubtful 5053.74 4682.77 TOTAL (A) 25330.12 31093.34 (B) Others Considered Good 154.39 20.54 Considered Doubtful 53.47 52.53 TOTAL (B) 207.86 73.07 SUB TOTAL (A+B) 25537.98 31166.41 Less: Provision for Doubtful debts 4561.37 4465.76 Provision against LD deducted & charged 545.84 20430.77 269.54 26431.11 Rent Receivables (A) Public Sector & Govt. Deptt. Considered Good 2743.51 2714.44 Considered Doubtful 82.82 76.41 TOTAL (A) 2826.33 2790.85 (B) Others Considered Good 42.48 66.64 Considered Doubtful 382.07 346.85 TOTAL (B) 424.55 413.49 SUB TOTAL (A+B) 3250.88 3204.34 Less: Provision for Doubtful Realisation 464.89 2785.99 423.26 2781.08 GRAND TOTAL 23216.76 29212.19 Notes: 1. Long Term Trade Receivables includes unbilled despatches ` 8170.62Lakh (Previous Year ` 17864.73 L) 2. Long Term Trade Receivables also include not due ` 10353.19 Lakh (Previous Year ` 5623.63L) equipments and Spares already supplied but realization there of is subject to compliance of certain contractual obligation. 33

ANNUAL REPORT <strong>2011</strong>-<strong>12</strong><br />

NOTES FORMING PART OF BALANCE SHEET<br />

` in Lakhs<br />

AS AT 31.03.20<strong>12</strong> AS AT 31.03.<strong>2011</strong><br />

NOTE NO. - 14<br />

OTHER NON-CURRENT ASSETS<br />

Long Term Trade Receivables<br />

(A) Public Sector & Govt. Deptt.<br />

Considered Good 20276.38 26410.57<br />

Considered Doubtful 5053.74 4682.77<br />

TOTAL (A) 25330.<strong>12</strong> 31093.34<br />

(B) Others<br />

Considered Good 154.39 20.54<br />

Considered Doubtful 53.47 52.53<br />

TOTAL (B) 207.86 73.07<br />

SUB TOTAL (A+B) 25537.98 31166.41<br />

Less: Provision for Doubtful debts 4561.37 4465.76<br />

Provision against LD deducted & charged 545.84 20430.77 269.54 26431.11<br />

Rent Receivables<br />

(A) Public Sector & Govt. Deptt.<br />

Considered Good 2743.51 2714.44<br />

Considered Doubtful 82.82 76.41<br />

TOTAL (A) 2826.33 2790.85<br />

(B) Others<br />

Considered Good 42.48 66.64<br />

Considered Doubtful 382.07 346.85<br />

TOTAL (B) 424.55 413.49<br />

SUB TOTAL (A+B) 3250.88 3204.34<br />

Less: Provision for Doubtful Realisation 464.89 2785.99 423.26 2781.08<br />

GRAND TOTAL 23216.76 292<strong>12</strong>.19<br />

Notes:<br />

1. Long Term Trade Receivables includes unbilled despatches ` 8170.62Lakh (Previous Year ` 17864.73 L)<br />

2. Long Term Trade Receivables also include not due ` 10353.19 Lakh (Previous Year ` 5623.63L) equipments and Spares already supplied but<br />

realization there of is subject to compliance of certain contractual obligation.<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!