annual report 2011-12 - Heavy Engineering Corporation Limited

annual report 2011-12 - Heavy Engineering Corporation Limited annual report 2011-12 - Heavy Engineering Corporation Limited

09.11.2014 Views

ANNUAL REPORT 2011-12 NOTES FORMING PART OF BALANCE SHEET ` in Lakhs AS AT 31.03.2012 AS AT 31.03.2011 NOTE NO. - 4 LONG TERM PROVISIONS Provision for Employee Benefits Provision for Gratuity 7939.47 7912.44 Provision for Leave Encashment 3650.63 3577.52 Provision for RTA 84.67 102.93 Provision for Sick Leave 520.84 472.37 Provision for Revision of Pay Scale for Employees 1214.22 13409.83 0.00 12065.26 Others Provision for Impaired Assets 79.77 17.69 Provision for Warranty Expenses 393.07 472.84 239.42 257.11 TOTAL 13882.67 12322.37 NOTE NO. - 5 SHORT TERM BORROWINGS Secured Loans Working Capital Loan from Bank 9440.88 8965.67 (Secured by Hypothecation of raw materials, finished Goods, Work-in-Progress, Stores and Spare parts and Book Debts) TOTAL 9440.88 8965.67 NOTE NO. - 6 TRADE PAYABLES Sundry Creditors 10138.43 9718.45 Dues to SME 129.06 35.76 Advance from Customers 997.51 2948.73 TOTAL 11265.00 12702.94 28

ANNUAL REPORT 2011-12 NOTES FORMING PART OF BALANCE SHEET ` in Lakhs AS AT 31.03.2012 AS AT 31.03.2011 NOTE NO. - 7 OTHER CURRENT LIABILITIES Employees Liabilities 3702.80 1951.25 Securities & Other Deposits from Contractors 393.23 922.89 Book Overdraft with Scheduled Bank 139.98 323.30 Electricity Dues 251.41 263.17 Water Dues 256.35 525.67 Other liabilities 4335.73 4008.12 Miscellaneous 1159.67 709.84 TOTAL 10239.17 8704.24 NOTE NO. - 8 SHORT TERM PROVISIONS Provision for Employee Benefits Provision for Gratuity 2549.42 2065.02 Provision for Leave Encashment 1527.27 1339.79 Provision for RTA 20.87 20.02 Provision for Sick Leave 164.25 153.03 Provision for Revision of Pay Scale for Employees 1369.51 5631.32 1214.22 4792.08 Others Provision for Impaired Assets 2.29 62.07 Provision for Warranty Expenses 349.23 351.52 350.20 412.27 TOTAL 5982.84 5204.35 29

ANNUAL REPORT <strong>2011</strong>-<strong>12</strong><br />

NOTES FORMING PART OF BALANCE SHEET<br />

` in Lakhs<br />

AS AT 31.03.20<strong>12</strong> AS AT 31.03.<strong>2011</strong><br />

NOTE NO. - 7<br />

OTHER CURRENT LIABILITIES<br />

Employees Liabilities 3702.80 1951.25<br />

Securities & Other Deposits from Contractors 393.23 922.89<br />

Book Overdraft with Scheduled Bank 139.98 323.30<br />

Electricity Dues 251.41 263.17<br />

Water Dues 256.35 525.67<br />

Other liabilities 4335.73 4008.<strong>12</strong><br />

Miscellaneous 1159.67 709.84<br />

TOTAL 10239.17 8704.24<br />

NOTE NO. - 8<br />

SHORT TERM PROVISIONS<br />

Provision for Employee Benefits<br />

Provision for Gratuity 2549.42 2065.02<br />

Provision for Leave Encashment 1527.27 1339.79<br />

Provision for RTA 20.87 20.02<br />

Provision for Sick Leave 164.25 153.03<br />

Provision for Revision of Pay Scale for Employees 1369.51 5631.32 <strong>12</strong>14.22 4792.08<br />

Others<br />

Provision for Impaired Assets 2.29 62.07<br />

Provision for Warranty Expenses 349.23 351.52 350.20 4<strong>12</strong>.27<br />

TOTAL 5982.84 5204.35<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!