• Replacement of centralized compressor unit with decentralized Air Compressor at the load centres.<br />
ANNUAL REPORT <strong>2011</strong>-<strong>12</strong><br />
• Provision of Transparent Sheets at roof tops of production shops so as to utilize sunlight for illumination.<br />
Performance of Foundry Forge Unit in both physical and financial terms has been badly affected due to delay in upgradation program of 2650T<br />
press. Energy consumption in this area is quasi variable as such specific energy consumption has gone up despite overall reduction in consumption<br />
of electricity and Coal. Coal is used for producing producer gas. Quality of Coal and deteriorating condition of gas plant has resulted in increased<br />
consumption of coal. Energy Consumption details per Ton of physical production of FFP during the recent years are as under :<br />
Units Consumption per Ton of Production<br />
Particulars <strong>2011</strong>-<strong>12</strong> 2010-11 2009-10 2008-09 2007-08<br />
Electricity (KWH) 2853.50 2904.83 2554.47 2421.87 2436.91<br />
Coal (MT) 5.44 5.55 4.62 4.49 4.32<br />
Diesel (Liters) 13.16 24.11 24.62 20.35 18.93<br />