ANNUAL REPORT <strong>2011</strong>-<strong>12</strong><br />

RESEARCH & DEVELOPMENT ACTIVITIES<br />

The company continued its efforts for the technology up gradation and development of products/systems during the year.<br />

I. Specific areas in which R&D activities were carried out by the company are detailed below :-<br />

III.<br />

IV.<br />

ANNEXURE-A<br />

RESEARCH & DEVELOPMENT,TECHNOLOGY ABSORPTION,ADAPTATION,<br />

INNOVATION AND ENERGY CONSERVATION<br />

• Design development and manufacture of Rotating Head Stock Spindle Assembly, Bottle Boring facility and programmable movement of Steady<br />

Rest for CNC Deep Hole Boring machine. The machine was supplied to OFC, Kanpur.<br />

• Development of Motorised swiveling of Arms for Radial Drilling machine. Modified machine was supplied to BHEL, Jagdishpur.<br />

• Development of 100T capacity Tundish Traverse for ISP.<br />

• Development of 65T and 60T Scrap charging Traverse for BSP and ISP respectively<br />

• Design development of pushing mechanism with drive for Coke pusher for 4.45m Coke Oven Battery for DSP.<br />

II.<br />

Import Substitution Efforts<br />

Following important items were manufactured and supplied<br />

• CNC Deep Hole Boring Machine, Model BDH-140N with special features like Rotating Spindle Head Stock, Bottle Boring facility & Programmable<br />

Steady Rest Movement.<br />

• 7 nos. of 5 Cum Rope Shovels to CIL subsidiaries<br />

• Phased dispatch of 2 nd Dragline 24/96 to NCL.<br />

Technology Absorption, Adaptation and Innovation<br />

i) The 1 st CNC Under Floor Wheel Lathe Machine out of 7 nos. was assembled and tested at HEC, Ranchi by engineers of M/s Hegenscheidt –<br />

MFD, Germany. HEC team has absorbed the assembly technology and assembled next 5 machines themselves without the assistance of M/s<br />

Hegenscheidt – MFD.<br />

ii) Upgradation of 2650T Press<br />

To reduce the overall cycle time, production of size forging, upgradtion of 2650T Press was initiated and completed.<br />

Energy Conservation<br />

Foundry Forge unit of the company is the most energy intensive unit which consumes more than 75% of total electrical energy and 100% of Coal.<br />

Various efforts made for reduction in melting cycle helped in substantial reduction in specific electricity consumption in the melting area during<br />

the year 2007-08. However, due to production of high quality steel the energy consumption had gone up during 2008-09 onwards. In addition,<br />

electric arc furnaces need upgradation, as these were installed in 60s. Delay in upgradation of Arc Furnaces also affected specific Power consumption.<br />

Company continued its thrust to reduce power consumption. Power consumption in melting area are as under :<br />

Power Consumption (KWH) per Ton of Liquid Metal<br />

Production<br />

<strong>2011</strong>-<strong>12</strong> 2010-11 2009-10 2008-09 2007-08 2006- 07<br />

917.99 960.31 937.35 981.46 868.72 1029.69<br />

The various steps being taken in Foundry Forge unit to bring down energy overall consumption and specific energy consumption are as under:<br />

• Reduction in maximum Demand of Power by proper load planning.<br />

• Use of energy efficient high pressure sodium vapor lamps/Tube lights.<br />

• Replacement of MG Sets by Static Transformers and Rectifiers.<br />

• Use of ceramic lining in Furnaces and by installing programmable controller in electric pit furnace.<br />

• Reduction in heat cycle time for melting furnaces etc.<br />