BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT
BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT
BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Bruce Heavy Water Plant Decommissioning<br />
Environmental Assessment Study Report<br />
Ontario Power Generation<br />
Final Submission to CNSC<br />
• identify those members of the project staff with specific EH&S responsibilities and describe<br />
the responsibility, authority and accountability of each;<br />
• identify the safety training required by workers engaged in various aspects of the work;<br />
• describe the procedures used to identify, report and control hazards in the workplace;<br />
• describe the procedures used to investigate accidents or injuries and eliminate the causes of<br />
those events;<br />
• describe the procedures used to perform hazardous work;<br />
• describe the procedures established to provide a safe work environment within the<br />
Construction Islands; and<br />
• describe the procedures that will be implemented to prepare for any accident, fire, flood, spill<br />
or other emergency situation that might occur during the course of the work.<br />
OPG will review the EH&S Management Plan prepared by the GDC who will not be permitted<br />
to begin work in any Construction Island until a plan acceptable to the OPG is in place. The<br />
GDC will be responsible for ensuring that all work in the Construction Islands, including work<br />
performed by subcontractors, is performed in accordance with the EH&S Management Plan.<br />
3.4.2.3 Construction Safety<br />
It is recognized that the demolition of the buildings, structures and pipe racks presents hazards to<br />
the safety of workers and visitors to the Construction Island. The GDC will be required to take<br />
all of the actions that are reasonably required to maintain a safe work environment within the<br />
Construction Islands, and must include Construction Safety procedures in the EH&S<br />
Management Plan. This may include procedures controlling:<br />
• the distribution, use, maintenance and testing of personal protective equipment;<br />
• work with power tools;<br />
• work at heights and fall protection;<br />
• work in confined spaces;<br />
• work in inclement weather;<br />
• hot work such as welding or cutting metals;<br />
• asbestos removal;<br />
• the operation and maintenance of heavy machinery;<br />
• the operation of cranes and the lifting of heavy loads; and<br />
• housekeeping.<br />
OPG will be entitled to audit the GDC’s compliance with the EH&S Management Plan. This<br />
may include inspecting the Construction Islands or observing work being performed. In the<br />
3-25 December 2002