2. Retention Basin Aesthetics & Multi-Use Evaluation As a separate part of the project, an additional evaluation was performed to determine the additional land area required to enhance an “engineered” basin by incorporating aesthetic and multi-use features to create a “kinder and gentler” basin design that, with additional enhancements, can be utilized as a public park. The results of this evaluation determined that the additional area required is highly dependent on the individual site, but could range from approximately a 10 percent increase to approximately a 50 percent increase. The full evaluation of this analysis can be found in Appendix G. DIBBLE & ASSOCIATES 38 DURANGO AREA DRAINAGE MASTER PLAN August 2002 RECOMMENDED DESIGN REPORT
- Page 1 and 2: Durango Area Drainage Master Plan R
- Page 3 and 4: DURANGO AREA DRAINAGE MASTER PLAN R
- Page 5: I. INTRODUCTION A. Objective This R
- Page 8 and 9: II. HYDROLOGY A. Introduction The h
- Page 10 and 11: 7/18/02 Figure II-2. - Build-Out Co
- Page 12 and 13: Concrete Lining - For planning purp
- Page 14 and 15: 3. Detention Basins Detention basin
- Page 16: continuing to receive such requests
- Page 20 and 21: V. RECOMMENDED PLAN A. Introduction
- Page 22 and 23: 4. Environmental Considerations: a.
- Page 24 and 25: 4. Environmental Considerations: a.
- Page 26: Q. Watershed Build-Out Conditions D
- Page 30 and 31: 3. Multiple Use Opportunities The r
- Page 32 and 33: UPRR at 107th Avenue (Photo key loc
- Page 34 and 35: agricultural lands which are quickl
- Page 36 and 37: Durango Regional Conveyance Channel
- Page 38 and 39: Grading. Slopes and grading for bot
- Page 40 and 41: 2. Desired Landscape Character Them
- Page 46 and 47: VII. ENVIRONMENTAL & PERMIT ISSUES
- Page 48 and 49: prior to construction and there are
- Page 50 and 51: 4. 47 th Avenue System The 47 th Av
- Page 52 and 53: National Fish and Wildlife Challeng
- Page 55 and 56: Durango ADMP TABLE 3 - PROJECTED PR
- Page 57 and 58: Durango ADMP TABLE 5 - PROJECTED CO
- Page 59 and 60: X. REFERENCES American Engineering
2. Retention Basin Aesthetics & Multi-Use Evaluation<br />
As a separate part <strong>of</strong> the project, an additional evaluation was<br />
performed to determine the additional land area required to enhance an<br />
“engineered” basin by incorporating aesthetic and multi-use features to<br />
create a “kinder and gentler” basin design that, with additional<br />
enhancements, can be utilized as a public park. The results <strong>of</strong> this<br />
evaluation determined that the additional area required is highly<br />
dependent on the individual site, but could range from approximately a<br />
10 percent increase to approximately a 50 percent increase. The full<br />
evaluation <strong>of</strong> this analysis can be found in Appendix G.<br />
DIBBLE & ASSOCIATES 38 DURANGO AREA DRAINAGE MASTER PLAN<br />
August 2002<br />
RECOMMENDED DESIGN REPORT