LIST OF FIGURES<br />

Page<br />

Figure I-1. - Study Area Location ........................ 1<br />

Figure I-2. - Study Area Map ........................... 2<br />

Figure II-1. - Improved Conditions Drainage Sub-Area<br />

Boundaries ..................................... 5<br />

Figure II-2. - Build-Out Conditions Land Use .............. 6<br />

Figure IV-1. - Existing & Planned Utilities ............... 13<br />

Figure IV-2. - Planned Private Development .............. 15<br />

Figure V-1. - Recommended Plan ....................... 22<br />

Figure V-2. - Existing and Residual <strong>Flood</strong>plains ........... 24<br />

Figure VI-1. - Recommended Plan Key Map .............. 25<br />

Figure VI-2. - Visual Analysis Photo Key Map ............ 26<br />

Figure VI-3. - Proposed Landscape Themes .............. 39<br />

Figure VI-4. - Landscape Character ..................... 40<br />

Figure VI-5. - Landscape Character ..................... 41<br />

Figure VIII-1. - Project Priorites ........................ 50<br />

LIST OF TABLES<br />

Page<br />

Table 1 - Utility Company Contacts ...................... 12<br />

Table 2 - Recommended Plan Estimated Project Costs ...... 49<br />

Table 3 - Projected Project Expenditures ................. 51<br />

Table 4 - Project Cost Sharing .......................... 52<br />

Table 5 - Projected Cost vs. Revenues .................... 53<br />

Table 6 - Recommended Plan Estimated Maintenance Costs . 54<br />

APPENDICES<br />

A. HEC-1 Storm Comparison Flow Summary<br />

B. Build-Out Conditions Retention Calculations<br />

C. Southwest Area Re-Study<br />

D. Northeast Area Alternatives Analysis<br />

E. Tres Rios Interior Drainage Study<br />

F. Public Involvement Documentation<br />

G. Retention Basin Aesthetics and Multi-Use Evaluation<br />

H. 75 th Avenue Preliminary Storm Drain Study<br />

I. Summary <strong>of</strong> Utility Pothole Results<br />

ABBREVIATIONS<br />

ADA - Americans with Disabilities Act<br />

ADMP - Area Drainage Master Plan<br />

APS - Arizona Public Service<br />

BFC - Buckeye Feeder Canal<br />

BID - Buckeye Irrigation <strong>District</strong><br />

cfs - cubic feet per second<br />

CIP - Capital Improvement Program<br />

DDMSW - Drainage Design Management System for Windows<br />

DOE - Department <strong>of</strong> Energy<br />

FCDMC - <strong>Flood</strong> <strong>Control</strong> <strong>District</strong> <strong>of</strong> <strong>Maricopa</strong> <strong>County</strong><br />

FEMA - Federal Emergency Management Agency<br />

FIRM - <strong>Flood</strong> Insurance Rate Map<br />

IGA - Inter-Governmental Agreement<br />

MAG - <strong>Maricopa</strong> Association <strong>of</strong> Governments<br />

MCDOT - <strong>Maricopa</strong> <strong>County</strong> Department <strong>of</strong> Transportation<br />

NAMU - Natural Appearing Multi-Use<br />

NPDES - National Pollutant Discharge Elimination System<br />

RID - Roosevelt Irrigation <strong>District</strong><br />

RRS - Roads <strong>of</strong> Regional Significance<br />

SRP - Salt River Project<br />

UPRR - Union Pacific Railroad<br />

EXHIBITS<br />

Recommended Plan Exhibits and Cost Summary<br />

Preliminary Design Plans<br />

DIBBLE & ASSOCIATES ii DURANGO AREA DRAINAGE MASTER PLAN<br />

August 2002<br />

RECOMMENDED DESIGN REPORT