Ironwood Rd<br />
Gantzel Rd<br />
Mountain View Rd<br />
33°24'0"N<br />
Old West Hwy<br />
Meridian Rd<br />
Southern Ave<br />
Improve <strong>Powerline</strong><br />
North Diversion Channel<br />
Goldfield Rd<br />
33°23'0"N<br />
33°22'0"N<br />
New <strong>Powerline</strong><br />
100-yr Channel<br />
Segment CP25<br />
<strong>Powerline</strong> FRS<br />
New <strong>Powerline</strong><br />
100-yr Channel<br />
Segment CP25 Hardened<br />
New <strong>Powerline</strong><br />
100-yr Channel<br />
Segment CP9<br />
New <strong>Powerline</strong><br />
100-yr Channel<br />
Segment CP5R Hardened<br />
33°21'0"N<br />
Remove Existing FRS<br />
New 66" Principal Outlet<br />
kj<br />
New <strong>Powerline</strong><br />
100-yr Channel<br />
Segment CP5R<br />
New <strong>Powerline</strong><br />
100-yr Channel<br />
Segment CP4 (Siphon Draw)<br />
Vineyard Road FRS<br />
North Auxiliary Spillway<br />
33°19'0"N<br />
33°20'0"N<br />
Raise Vineyard Road<br />
FRS Crest<br />
Vineyard Road FRS<br />
33°18'0"N<br />
Vineyard Road FRS<br />
South Auxiliary Spillway<br />
33°17'0"N<br />
33°16'0"N<br />
33°15'0"N<br />
33°14'0"N<br />
Legend<br />
kj<br />
Ocotillo Rd<br />
Principal Spillway<br />
Proposed IDSM Alignment<br />
Existing PVR Structures<br />
Raise FRS Crest<br />
Rittenhouse Levee<br />
Approximate Footprint to Top of FRS<br />
Modified Easement<br />
Apache Junction City Limits<br />
SR 802 Study Area Boundary<br />
Superstition Foothills Waterline<br />
Transmission Lines<br />
Regional Transit<br />
<strong>Flood</strong> Pool to Emergency Spillway Crest<br />
Mesquite Bosques<br />
Impacted<br />
Likely Impacted<br />
No Impact<br />
O<br />
0 2,000 4,000 8,000<br />
Feet<br />
Rittenhouse FRS<br />
Convert Rittenhouse<br />
FRS to a Levee<br />
111°35'0"W<br />
111°34'0"W<br />
111°33'0"W<br />
111°32'0"W<br />
111°31'0"W<br />
111°30'0"W<br />
111°29'0"W<br />
111°28'0"W<br />
DRAWING NAME<br />
091131019<br />
PROJECT NO.<br />
Figure 5: Alternative 8A<br />
Replace <strong>Powerline</strong>, Convert Rittenhouse<br />
<strong>and</strong> Raise Vineyard Road<br />
SCALE(H): AS SHOWN<br />
SCALE(V): N/A<br />
DESIGNED BY: TDD<br />
DRAWN BY: TDD<br />
CHECKED BY: RAE<br />
DATE: APRIL 2012<br />
Engineering, <strong>Plan</strong>ning <strong>and</strong><br />
<strong>Environ</strong>mental Consultants<br />
7878 North 16th Street, Suite 300<br />
Phoenix, Arizona 85020 (602) 944-5500<br />
NO.<br />
REVISION BY DATE APPR.