06.11.2014 Views

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />

Pinal County, AZ<br />

Draft Supplemental Watershed <strong>Plan</strong><br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

9.0 REFERENCES<br />

AMEC Earth & <strong>Environ</strong>mental, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project – Draft Earth Fissure Risk Zoning<br />

Memor<strong>and</strong>um.” <strong>Jan</strong>uary, 2012.<br />

AMEC Earth & <strong>Environ</strong>mental, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project – Draft Filter Alternatives Memor<strong>and</strong>um.”<br />

<strong>Jan</strong>uary, 2012.<br />

AMEC Earth & <strong>Environ</strong>mental, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project - Final Initial Subsidence <strong>and</strong> Earth<br />

Fissure Report.” August, 2010.<br />

AMEC Earth & <strong>Environ</strong>mental, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project - Final Geotechnical Summary <strong>and</strong><br />

Analysis Report.” August 2010.<br />

Arizona Department of Water Resources. “Arizona Administrative Code, Title 12, Chapter 15,<br />

Article 12 – Dam Safety Procedures.” June 2000.<br />

Arizona State L<strong>and</strong> Department. “Desert Drive Area Study Existing Conditions Hydrology.”<br />

Prepared by J.E. Fuller Hydrology <strong>and</strong> Geomorphology, Inc. December, 2007.<br />

Arizona State L<strong>and</strong> Department. “Desert Drive Area Study Existing Conditions Inundation <strong>and</strong><br />

Sedimentation Analysis for PVR Structures.” Prepared by J.E. Fuller Hydrology <strong>and</strong><br />

Geomorphology, Inc. April, 2008.<br />

East Valley Partnership. “Superstition Vistas Scenario Report.” September 2009.<br />

EPG, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding Structures Rehabilitation<br />

or Replacement Project - Site Analysis Report.” February, 2010.<br />

<strong>Flood</strong> <strong>Control</strong> District of Maricopa County. “Hydrology Study, Volume I, Dambreak Analysis for<br />

<strong>Powerline</strong>, Vineyard, Rittenhouse <strong>Flood</strong> Retarding Structures.” Prepared by James M.<br />

Montgomery Consulting Engineers Inc., October 1989.<br />

<strong>Flood</strong> <strong>Control</strong> District of Maricopa County. “Preliminary Design Report – Site Evaluation of<br />

Interim Dam Safety Measure, <strong>Powerline</strong> <strong>Flood</strong> Retarding Structure.” Prepared by AMEC<br />

Earth & <strong>Environ</strong>mental, Inc., July 2009.<br />

<strong>Flood</strong> <strong>Control</strong> District of Maricopa County. “Structures <strong>Assessment</strong> Program – Phase I Alternatives<br />

Analysis Report: Cave Buttes Dam, <strong>Powerline</strong> FRS, Vineyard Road FRS, Rittenhouse<br />

FRS.” Prepared by Kimley-Horn <strong>and</strong> Associates, Inc. February, 2001.<br />

<strong>Flood</strong> <strong>Control</strong> District of Maricopa County. “Structures <strong>Assessment</strong> Program – Phase I Final<br />

Failure Modes <strong>and</strong> Effects Analysis Report: Cave Buttes Dam, <strong>Powerline</strong> FRS, Vineyard<br />

USDA- NRCS Page 9-1 <strong>Jan</strong>uary <strong>2013</strong><br />

Kimley-Horn <strong>and</strong> Associates, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!