<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />

Pinal County, AZ<br />

Draft Supplemental Watershed <strong>Plan</strong><br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

NRCS Table 6 - Comparison of NED Benefits <strong>and</strong> Costs<br />

<strong>Powerline</strong> FRS<br />

Apache Junction-Gilbert Watershed, Maricopa <strong>and</strong> Pinal Counties, AZ<br />

(Dollars) 1/<br />

Works of<br />

Improvement<br />

Average<br />

Annual<br />

Benefits (Ag-<br />

Related)<br />

Average<br />

Annual<br />

Benefits (Non<br />

Ag-Related)<br />

Average<br />

Annual<br />

Costs 2/<br />

Benefit/ Cost<br />

Ratio 3/<br />

<strong>Powerline</strong> FRS $0 $0 $1,006,700 0.0 to 1.0<br />

1/ Price Base 2012.<br />

<strong>Jan</strong>uary <strong>2013</strong><br />

2/ From Table 4.<br />

3/ The proposed project will provide an estimated $14,779,300 in average annual equivalent damage reduction benefits. However, as the "no<br />

action" or future without project alternative also provides this same benefit stream, the project does not have a positive incremental NED benefit.<br />

The benefits of the project are tied to reducing the risk of catastrophic failure of the existing structures <strong>and</strong> thus reducing the risk to life <strong>and</strong><br />

property, as described in the plan.<br />

USDA- NRCS Page 8-14 <strong>Jan</strong>uary <strong>2013</strong><br />

Kimley-Horn <strong>and</strong> Associates, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!