Powerline Flood Retarding Structure Draft Supplemental Watershed Plan Pinal County, AZ and Environmental Assessment NRCS Table 3b - Structural Data – Channel Work, Powerline FRS Apache Junction-Gilbert Watershed, Maricopa and Pinal Counties, AZ Channel Dimensions n-Value Velocities (ft/s) Channel Name (Reach) Station Drain Area (mi 2 ) 100 Year Freq Design Discharge (ft 3 /s) Water Surface Elevation Feet (msl) Hydraulic Gradient (ft/ft) Gradient (ft/ft) Bottom Width (ft) Elevation (ft/msl) Side Slope Aged As- Built Aged As- Built Excavation Volume (yd 3 ) Type of Work 1/ Existing Channel Type 2/ Present Flow Condition 3/ CP25 10+00 to 27+50 2.1 984 1602.0 1597.1 0.0017 0.0017 60 1598.0 1595.1 6 0.045 - 2.9 - 13,900 I O E CP25 Hardened 27+50 to 46+50 2.1 939 1597.1 1593.8 0.0017 0.0017 60 1595.1 1591.8 2 0.013 - 7.0 - 13,800 I O E CP9 46+50 to 61+50 12.5 3,153 1593.8 1594.1 0.0017 0.0017 150 1591.8 1589.2 6 0.045 - 3.4 - 30,600 I O E CP5R Hardened 61+50 to 77+50 21.5 7,746 CP5R 77+50 to Vineyard Road Flood Pool 21.5 8,129 CP4 (Siphon Draw) 25.2 13,444 1/ 2/ 3/ I-Establishment of new channel including necessary stabilization measures II-Enlargement or realignment of existing channel or stream 1594.1 1590.7 0.0017 0.0017 150 1590.7 1580.4 0.0017 0.0017 500 1599.0 1579.1 0.0037 0.0037 1000 III-Cleaning out natural or manmade channel (including bar removal and major clearing and snagging operations) IV-Clearing and removal of loose debris within channel section V-Stabilization as primary purpose (by continuous treatment or localized problem areas-present capacity adequate) N-An unmodified, well-defined natural channel or stream M-Manmade ditch or previously modified channel or stream (show approximate date of original construction in parenthesis) O-None or practically no defined channel Pr: Perennial - Flows at all times except during extreme drought I: Intermittent - Continuous flow through some seasons of the year E: Ephemeral - Flows only during periods of surface runoff, otherwise dry S: Ponded water with no noticeable flow-caused by lack of outlet or high groundwater table 1589.2 1586.5 2 0.013 - 11.0 - 48,700 I O E 1586.5 1576.0 6 0.045 - 3.3 - 911,900 I O E 1595.9 1576.0 6 0.045 - 4.1 - 455,500 I O E January 2013 USDA- NRCS Page 8-11 January 2013 Kimley-Horn and Associates, Inc.
Powerline Flood Retarding Structure Draft Supplemental Watershed Plan Pinal County, AZ and Environmental Assessment NRCS Table 4 - Estimated Average Annual National Economic Development (NED) Costs Powerline FRS Apache Junction-Gilbert Watershed, Maricopa and Pinal Counties, AZ (Dollars) 1/ Works of Improvement ----------Project Outlays----------- Amortization of Rehabilitation Cost 2/ Operation, Maintenance and Replacement Cost Total Powerline FRS $794,000 $212,700 $1,006,700 1/ Price Base 2012. TOTAL $794,000 $212,700 $1,006,700 2/ Amortized for 102 years at 3.750 percent. January 2013 USDA- NRCS Page 8-12 January 2013 Kimley-Horn and Associates, Inc.
- Page 25 and 26: Powerline Flood Retarding Structure
- Page 27 and 28: Powerline Flood Retarding Structure
- Page 29 and 30: Powerline Flood Retarding Structure
- Page 31 and 32: Powerline Flood Retarding Structure
- Page 33 and 34: Powerline Flood Retarding Structure
- Page 35 and 36: Powerline Flood Retarding Structure
- Page 37 and 38: Powerline Flood Retarding Structure
- Page 39 and 40: Powerline Flood Retarding Structure
- Page 41 and 42: Powerline Flood Retarding Structure
- Page 43 and 44: Powerline Flood Retarding Structure
- Page 45 and 46: Powerline Flood Retarding Structure
- Page 47 and 48: Powerline Flood Retarding Structure
- Page 49 and 50: Powerline Flood Retarding Structure
- Page 51 and 52: Powerline Flood Retarding Structure
- Page 53 and 54: Powerline Flood Retarding Structure
- Page 55 and 56: Powerline Flood Retarding Structure
- Page 57 and 58: Powerline Flood Retarding Structure
- Page 59 and 60: Powerline Flood Retarding Structure
- Page 61 and 62: Powerline Flood Retarding Structure
- Page 63 and 64: Powerline Flood Retarding Structure
- Page 65 and 66: Powerline Flood Retarding Structure
- Page 67 and 68: Powerline Flood Retarding Structure
- Page 69 and 70: Powerline Flood Retarding Structure
- Page 71 and 72: Powerline Flood Retarding Structure
- Page 73 and 74: Powerline Flood Retarding Structure
- Page 75: Powerline Flood Retarding Structure
- Page 79 and 80: Powerline Flood Retarding Structure
- Page 81 and 82: Powerline Flood Retarding Structure
- Page 83 and 84: Powerline Flood Retarding Structure
- Page 85 and 86: Powerline Flood Retarding Structure
- Page 87 and 88: Powerline Flood Retarding Structure
- Page 89 and 90: Signal Butte Rd Meridian Rd Ironwoo
- Page 91: POWERLINE FRS TYPICAL SECTION
- Page 95 and 96: Ironwood Rd Gantzel Rd Mountain Vie
- Page 97 and 98: Figure 22 Figure 21 - Conceptual Mu
- Page 99 and 100: K:\PHX_WaterResources\91131019\CADD
- Page 101 and 102: K:\PHX_WaterResources\91131019\CADD
- Page 103 and 104: Exhibit A-2 - Emergency Spillway Di
- Page 105 and 106: Price Price Price Dobson Alma Schoo
- Page 107 and 108: Powerline Flood Retarding Structure
- Page 109 and 110: Powerline Flood Retarding Structure
- Page 111 and 112: Powerline Flood Retarding Structure
- Page 113 and 114: Powerline Flood Retarding Structure
- Page 115 and 116: Powerline Flood Retarding Structure
- Page 117 and 118: Powerline Flood Retarding Structure
- Page 119 and 120: Powerline Flood Retarding Structure
- Page 121 and 122: Powerline Flood Retarding Structure
- Page 123 and 124: Powerline Flood Retarding Structure
- Page 125 and 126: Powerline Flood Retarding Structure
<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure Draft Supplemental Watershed <strong>Plan</strong><br />
Pinal County, AZ<br />
<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />
NRCS Table 3b - Structural Data – Channel Work, <strong>Powerline</strong> FRS Apache Junction-Gilbert Watershed, Maricopa <strong>and</strong> Pinal Counties, AZ<br />
Channel Dimensions<br />
n-Value<br />
Velocities<br />
(ft/s)<br />
Channel<br />
Name<br />
(Reach)<br />
Station<br />
Drain<br />
Area<br />
(mi 2 )<br />
100 Year<br />
Freq Design<br />
Discharge<br />
(ft 3 /s)<br />
Water<br />
Surface<br />
Elevation<br />
Feet<br />
(msl)<br />
Hydraulic<br />
Gradient<br />
(ft/ft)<br />
Gradient<br />
(ft/ft)<br />
Bottom<br />
Width<br />
(ft)<br />
Elevation<br />
(ft/msl)<br />
Side<br />
Slope<br />
Aged<br />
As-<br />
Built<br />
Aged<br />
As-<br />
Built<br />
Excavation<br />
Volume<br />
(yd 3 )<br />
Type<br />
of<br />
Work<br />
1/<br />
Existing<br />
Channel<br />
Type 2/<br />
Present<br />
Flow<br />
Condition<br />
3/<br />
CP25<br />
10+00 to<br />
27+50 2.1 984<br />
1602.0<br />
1597.1 0.0017 0.0017 60<br />
1598.0<br />
1595.1 6 0.045 - 2.9 - 13,900 I O E<br />
CP25<br />
Hardened<br />
27+50 to<br />
46+50 2.1 939<br />
1597.1<br />
1593.8 0.0017 0.0017 60<br />
1595.1<br />
1591.8 2 0.013 - 7.0 - 13,800 I O E<br />
CP9<br />
46+50 to<br />
61+50 12.5 3,153<br />
1593.8<br />
1594.1 0.0017 0.0017 150<br />
1591.8<br />
1589.2 6 0.045 - 3.4 - 30,600 I O E<br />
CP5R<br />
Hardened<br />
61+50 to<br />
77+50 21.5 7,746<br />
CP5R<br />
77+50 to<br />
Vineyard<br />
Road <strong>Flood</strong><br />
Pool 21.5 8,129<br />
CP4<br />
(Siphon<br />
Draw) 25.2 13,444<br />
1/<br />
2/<br />
3/<br />
I-Establishment of new channel including necessary stabilization measures<br />
II-Enlargement or realignment of existing channel or stream<br />
1594.1<br />
1590.7 0.0017 0.0017 150<br />
1590.7<br />
1580.4 0.0017 0.0017 500<br />
1599.0<br />
1579.1 0.0037 0.0037 1000<br />
III-Cleaning out natural or manmade channel (including bar removal <strong>and</strong> major clearing <strong>and</strong> snagging operations)<br />
IV-Clearing <strong>and</strong> removal of loose debris within channel section<br />
V-Stabilization as primary purpose (by continuous treatment or localized problem areas-present capacity adequate)<br />
N-An unmodified, well-defined natural channel or stream<br />
M-Manmade ditch or previously modified channel or stream (show approximate date of original construction in parenthesis)<br />
O-None or practically no defined channel<br />
Pr: Perennial - Flows at all times except during extreme drought<br />
I: Intermittent - Continuous flow through some seasons of the year<br />
E: Ephemeral - Flows only during periods of surface runoff, otherwise dry<br />
S: Ponded water with no noticeable flow-caused by lack of outlet or high groundwater table<br />
1589.2<br />
1586.5 2 0.013 - 11.0 - 48,700 I O E<br />
1586.5<br />
1576.0 6 0.045 - 3.3 - 911,900 I O E<br />
1595.9<br />
1576.0 6 0.045 - 4.1 - 455,500 I O E<br />
<strong>Jan</strong>uary <strong>2013</strong><br />
USDA- NRCS Page 8-11 <strong>Jan</strong>uary <strong>2013</strong><br />
Kimley-Horn <strong>and</strong> Associates, Inc.