Powerline Flood Retarding Structure Draft Supplemental Watershed Plan Pinal County, AZ and Environmental Assessment NRCS Table 3b - Structural Data – Channel Work, Powerline FRS Apache Junction-Gilbert Watershed, Maricopa and Pinal Counties, AZ Channel Dimensions n-Value Velocities (ft/s) Channel Name (Reach) Station Drain Area (mi 2 ) 100 Year Freq Design Discharge (ft 3 /s) Water Surface Elevation Feet (msl) Hydraulic Gradient (ft/ft) Gradient (ft/ft) Bottom Width (ft) Elevation (ft/msl) Side Slope Aged As- Built Aged As- Built Excavation Volume (yd 3 ) Type of Work 1/ Existing Channel Type 2/ Present Flow Condition 3/ CP25 10+00 to 27+50 2.1 984 1602.0 1597.1 0.0017 0.0017 60 1598.0 1595.1 6 0.045 - 2.9 - 13,900 I O E CP25 Hardened 27+50 to 46+50 2.1 939 1597.1 1593.8 0.0017 0.0017 60 1595.1 1591.8 2 0.013 - 7.0 - 13,800 I O E CP9 46+50 to 61+50 12.5 3,153 1593.8 1594.1 0.0017 0.0017 150 1591.8 1589.2 6 0.045 - 3.4 - 30,600 I O E CP5R Hardened 61+50 to 77+50 21.5 7,746 CP5R 77+50 to Vineyard Road Flood Pool 21.5 8,129 CP4 (Siphon Draw) 25.2 13,444 1/ 2/ 3/ I-Establishment of new channel including necessary stabilization measures II-Enlargement or realignment of existing channel or stream 1594.1 1590.7 0.0017 0.0017 150 1590.7 1580.4 0.0017 0.0017 500 1599.0 1579.1 0.0037 0.0037 1000 III-Cleaning out natural or manmade channel (including bar removal and major clearing and snagging operations) IV-Clearing and removal of loose debris within channel section V-Stabilization as primary purpose (by continuous treatment or localized problem areas-present capacity adequate) N-An unmodified, well-defined natural channel or stream M-Manmade ditch or previously modified channel or stream (show approximate date of original construction in parenthesis) O-None or practically no defined channel Pr: Perennial - Flows at all times except during extreme drought I: Intermittent - Continuous flow through some seasons of the year E: Ephemeral - Flows only during periods of surface runoff, otherwise dry S: Ponded water with no noticeable flow-caused by lack of outlet or high groundwater table 1589.2 1586.5 2 0.013 - 11.0 - 48,700 I O E 1586.5 1576.0 6 0.045 - 3.3 - 911,900 I O E 1595.9 1576.0 6 0.045 - 4.1 - 455,500 I O E January 2013 USDA- NRCS Page 8-11 January 2013 Kimley-Horn and Associates, Inc.

Powerline Flood Retarding Structure Draft Supplemental Watershed Plan Pinal County, AZ and Environmental Assessment NRCS Table 4 - Estimated Average Annual National Economic Development (NED) Costs Powerline FRS Apache Junction-Gilbert Watershed, Maricopa and Pinal Counties, AZ (Dollars) 1/ Works of Improvement ----------Project Outlays----------- Amortization of Rehabilitation Cost 2/ Operation, Maintenance and Replacement Cost Total Powerline FRS $794,000 $212,700 $1,006,700 1/ Price Base 2012. TOTAL $794,000 $212,700 $1,006,700 2/ Amortized for 102 years at 3.750 percent. January 2013 USDA- NRCS Page 8-12 January 2013 Kimley-Horn and Associates, Inc.

<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure Draft Supplemental Watershed <strong>Plan</strong><br />

Pinal County, AZ<br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

NRCS Table 3b - Structural Data – Channel Work, <strong>Powerline</strong> FRS Apache Junction-Gilbert Watershed, Maricopa <strong>and</strong> Pinal Counties, AZ<br />

Channel Dimensions<br />

n-Value<br />

Velocities<br />

(ft/s)<br />

Channel<br />

Name<br />

(Reach)<br />

Station<br />

Drain<br />

Area<br />

(mi 2 )<br />

100 Year<br />

Freq Design<br />

Discharge<br />

(ft 3 /s)<br />

Water<br />

Surface<br />

Elevation<br />

Feet<br />

(msl)<br />

Hydraulic<br />

Gradient<br />

(ft/ft)<br />

Gradient<br />

(ft/ft)<br />

Bottom<br />

Width<br />

(ft)<br />

Elevation<br />

(ft/msl)<br />

Side<br />

Slope<br />

Aged<br />

As-<br />

Built<br />

Aged<br />

As-<br />

Built<br />

Excavation<br />

Volume<br />

(yd 3 )<br />

Type<br />

of<br />

Work<br />

1/<br />

Existing<br />

Channel<br />

Type 2/<br />

Present<br />

Flow<br />

Condition<br />

3/<br />

CP25<br />

10+00 to<br />

27+50 2.1 984<br />

1602.0<br />

1597.1 0.0017 0.0017 60<br />

1598.0<br />

1595.1 6 0.045 - 2.9 - 13,900 I O E<br />

CP25<br />

Hardened<br />

27+50 to<br />

46+50 2.1 939<br />

1597.1<br />

1593.8 0.0017 0.0017 60<br />

1595.1<br />

1591.8 2 0.013 - 7.0 - 13,800 I O E<br />

CP9<br />

46+50 to<br />

61+50 12.5 3,153<br />

1593.8<br />

1594.1 0.0017 0.0017 150<br />

1591.8<br />

1589.2 6 0.045 - 3.4 - 30,600 I O E<br />

CP5R<br />

Hardened<br />

61+50 to<br />

77+50 21.5 7,746<br />

CP5R<br />

77+50 to<br />

Vineyard<br />

Road <strong>Flood</strong><br />

Pool 21.5 8,129<br />

CP4<br />

(Siphon<br />

Draw) 25.2 13,444<br />

1/<br />

2/<br />

3/<br />

I-Establishment of new channel including necessary stabilization measures<br />

II-Enlargement or realignment of existing channel or stream<br />

1594.1<br />

1590.7 0.0017 0.0017 150<br />

1590.7<br />

1580.4 0.0017 0.0017 500<br />

1599.0<br />

1579.1 0.0037 0.0037 1000<br />

III-Cleaning out natural or manmade channel (including bar removal <strong>and</strong> major clearing <strong>and</strong> snagging operations)<br />

IV-Clearing <strong>and</strong> removal of loose debris within channel section<br />

V-Stabilization as primary purpose (by continuous treatment or localized problem areas-present capacity adequate)<br />

N-An unmodified, well-defined natural channel or stream<br />

M-Manmade ditch or previously modified channel or stream (show approximate date of original construction in parenthesis)<br />

O-None or practically no defined channel<br />

Pr: Perennial - Flows at all times except during extreme drought<br />

I: Intermittent - Continuous flow through some seasons of the year<br />

E: Ephemeral - Flows only during periods of surface runoff, otherwise dry<br />

S: Ponded water with no noticeable flow-caused by lack of outlet or high groundwater table<br />

1589.2<br />

1586.5 2 0.013 - 11.0 - 48,700 I O E<br />

1586.5<br />

1576.0 6 0.045 - 3.3 - 911,900 I O E<br />

1595.9<br />

1576.0 6 0.045 - 4.1 - 455,500 I O E<br />

<strong>Jan</strong>uary <strong>2013</strong><br />

USDA- NRCS Page 8-11 <strong>Jan</strong>uary <strong>2013</strong><br />

Kimley-Horn <strong>and</strong> Associates, Inc.