<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />

Pinal County, AZ<br />

Draft Supplemental Watershed <strong>Plan</strong><br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

NRCS Table 1 - Estimated Installation Cost<br />

<strong>Powerline</strong> FRS<br />

Apache Junction-Gilbert Watershed, Maricopa <strong>and</strong> Pinal Counties, AZ<br />

(Dollars) 1/<br />

Installation Cost Item Unit Number<br />

Federal<br />

Funds<br />

1/, 2/<br />

Estimated Cost<br />

Other Funds<br />

Total<br />

Replacement of<br />

<strong>Powerline</strong> FRS<br />

No. 1 $15,476,200 $8,417,600 $23,893,800<br />

Total Project $15,476,200 $8,417,600 $23,893,800<br />

<strong>Jan</strong>uary <strong>2013</strong><br />

1/ 2012 Prices.<br />

2/ Federal Funds include NRCS Engineering Services <strong>and</strong> Project Administration ($650,000), which are not included when calculating eligible<br />

federal cost share. Permit costs ($434,300) are also not included. Therefore, federal cost share is based on Total Eligible Project Cost of<br />

$22,809,500.<br />

USDA- NRCS Page 8-9 <strong>Jan</strong>uary <strong>2013</strong><br />

Kimley-Horn <strong>and</strong> Associates, Inc.