<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />
Pinal County, AZ<br />
Draft Supplemental Watershed <strong>Plan</strong><br />
<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />
LIST OF TABLES<br />
Table 3-1 Evaluation of Identified Concerns .............................................................................. 3-1<br />
Table 4-1 Non-Inclusive Listing of Vegetation ........................................................................... 4-5<br />
Table 6-1 Summary <strong>and</strong> Comparison of C<strong>and</strong>idate <strong>Plan</strong>s – NED Account .................................. 6-9<br />
Table 6-2 Summary <strong>and</strong> Comparison of C<strong>and</strong>idate <strong>Plan</strong>s – EQ Account................................... 6-10<br />
Table 6-3 Summary <strong>and</strong> Comparison of C<strong>and</strong>idate <strong>Plan</strong>s – OSE Account ................................ 6-12<br />
Table 6-4 Effects of the Alternatives on Resources of National Recognition............................. 6-13<br />
Table 8-1 Summary of <strong>Powerline</strong> Channel Geometry <strong>and</strong> Results. ............................................. 8-2<br />
Table 10-1 List of Preparers ..................................................................................................... 10-1<br />
LIST OF NRCS NATIONAL WATERSHED MANUAL TABLES (SECTION 8)<br />
NRCS Table 1 - Estimated Installation Cost ................................................................................ 8-9<br />
NRCS Table 2 - Estimated Cost Distribution - Structural <strong>and</strong> Non-Structural Measures ............ 8-10<br />
NRCS Table 3b - Structural Data – Channel Work, <strong>Powerline</strong> Channel, Pinal County, AZ........ 8-11<br />
NRCS Table 4 - Estimated Average Annual National Economic Development (NED) Costs ..... 8-12<br />
NRCS Table 5 - Estimated Average Annual <strong>Flood</strong> Damage Reduction Benefits ........................ 8-13<br />
NRCS Table 6 - Comparison of NED Benefits <strong>and</strong> Costs .......................................................... 8-14<br />
LIST OF FIGURES<br />
Figure C-1. <strong>Powerline</strong> FRS Existing Embankment - Typical Section<br />
Figure C-2. <strong>Powerline</strong> FRS Principal Spillway<br />
Figure C-3. <strong>Powerline</strong> FRS Auxiliary Spillway<br />
Figure C-4. Earth Fissure Risk Zones<br />
Figure C-5. <strong>Plan</strong> View Preferred Alternative<br />
Figure C-6. Proposed <strong>Powerline</strong> Channel – Typical Section<br />
Figure C-7. Proposed <strong>Powerline</strong> Channel – Hardened Typical Section<br />
Figure C-8. <strong>Plan</strong> View of Proposed North Diversion Channel<br />
Figure C-9. Proposed North Diversion Channel - Typical Section<br />
Figure C-10. Emergency Spillway Inundation Areas – <strong>Powerline</strong> FRS<br />
Figure C-11. Dam Failure Inundation Areas – <strong>Powerline</strong> FRS<br />
Figure C-12. 100-year <strong>Flood</strong>plain Mapping with Dams In-Place<br />
Figure C-13. 100-year <strong>Flood</strong>plain Mapping without Dams In-Place<br />
LIST OF APPENDICES<br />
Appendix A. Comments <strong>and</strong> Responses<br />
Appendix B. Project Map<br />
Appendix C. Support Maps<br />
Appendix D. Investigation <strong>and</strong> Analysis Report<br />
Appendix E. Other Supporting Information<br />
Appendix F. Compact Disk (CD)<br />
USDA- NRCS Page vi <strong>Jan</strong>uary <strong>2013</strong><br />
Kimley-Horn <strong>and</strong> Associates, Inc.