Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...
Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ... Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...
Powerline Flood Retarding Structure Pinal County, AZ Draft Supplemental Watershed Plan and Environmental Assessment Sediment Damage Table 6-3 Summary and Comparison of Candidate Plans – OSE Account Human Health and Safety Alternative 1 No Federal Action No effect Continued risk of loss-oflife due to dam failure from embankment cracking and/or overtopping. Land Rights and Relocations No effect No effect Alternative 2 Decommissioning Sponsor's Preferred/NED Plan Discharge to Vineyard Road FRS. Powerline sediment carried to Vineyard Road FRS. Un-safe dam removed. No impoundment of water for Powerline Channel. Land Use Breach of dam could limit downstream development Flood protection provided for the 100-year event Environmental Justice Municipal and Irrigation Water Transportation Potential to inundate residential structures from dambreak CAP canal subject to inundation in a dam break flood Continued risk of transportation infrastructure due to dam failure from embankment cracking or overtopping Flood protection provided for residential structures No effect Flood protection provided for public infrastructure The effects of the alternatives on resources of national recognition are summarized in Table 6-4. USDA- NRCS Page 6-12 January 2013 Kimley-Horn and Associates, Inc.
Powerline Flood Retarding Structure Pinal County, AZ Draft Supplemental Watershed Plan and Environmental Assessment Table 6-4 Effects of the Alternatives on Resources of National Recognition Types of Resources Air Quality Coastal Zone Endangered & Threatened Species Critical Habitat Fish and Wildlife Habitat Floodplains Historic and Cultural Properties Prime and Unique Farmland Water Quality Principal Sources of National Recognition Clean Air Act, as amended (42 USC 7401 et seq.) Coastal Zone Management Act of 1972, as amended (16 USC 1451 et seq.) Endangered Species Act of 1973, as amended (16 USC 1531 et seq.) Fish and Wildlife Coordination Act (16 USC 661 et seq.) Executive Order 11988, Flood plain Management National Historic Preservation Act of 1966, as amended (16 USC 470 et seq) CEQ Memorandum of August 1, 1980: Analysis of Impacts on Prime or Unique Agricultural Lands in Implementing the National Environmental Policy Act, Farmland Protection Policy Act of 1981. Clean Water Act of 1977, as amended (33 USC 1251 et seq.) Alternative 1 No Federal Action No effect No effect No effect No effect No effect No effect No effect No effect Measurement of Effects Alternative 2 Decommissioning Sponsor's Preferred/NED Plan Short-term minor adverse effect during construction. No effect No effect Short-term minor adverse effect during construction. Establish floodplain associated with channel. Sites in the APE that will not be subject to projectrelated impacts will be avoided by project implementation activities. Data recovery studies will be performed to mitigate impacts to all sites likely to suffer project-related impacts No effect No effect USDA- NRCS Page 6-13 January 2013 Kimley-Horn and Associates, Inc.
- Page 9 and 10: Powerline Flood Retarding Structure
- Page 11 and 12: Powerline Flood Retarding Structure
- Page 13 and 14: Powerline Flood Retarding Structure
- Page 15 and 16: Powerline Flood Retarding Structure
- Page 17 and 18: Powerline Flood Retarding Structure
- Page 19 and 20: Powerline Flood Retarding Structure
- Page 21 and 22: Powerline Flood Retarding Structure
- Page 23 and 24: Powerline Flood Retarding Structure
- Page 25 and 26: Powerline Flood Retarding Structure
- Page 27 and 28: Powerline Flood Retarding Structure
- Page 29 and 30: Powerline Flood Retarding Structure
- Page 31 and 32: Powerline Flood Retarding Structure
- Page 33 and 34: Powerline Flood Retarding Structure
- Page 35 and 36: Powerline Flood Retarding Structure
- Page 37 and 38: Powerline Flood Retarding Structure
- Page 39 and 40: Powerline Flood Retarding Structure
- Page 41 and 42: Powerline Flood Retarding Structure
- Page 43 and 44: Powerline Flood Retarding Structure
- Page 45 and 46: Powerline Flood Retarding Structure
- Page 47 and 48: Powerline Flood Retarding Structure
- Page 49 and 50: Powerline Flood Retarding Structure
- Page 51 and 52: Powerline Flood Retarding Structure
- Page 53 and 54: Powerline Flood Retarding Structure
- Page 55 and 56: Powerline Flood Retarding Structure
- Page 57 and 58: Powerline Flood Retarding Structure
- Page 59: Powerline Flood Retarding Structure
- Page 63 and 64: Powerline Flood Retarding Structure
- Page 65 and 66: Powerline Flood Retarding Structure
- Page 67 and 68: Powerline Flood Retarding Structure
- Page 69 and 70: Powerline Flood Retarding Structure
- Page 71 and 72: Powerline Flood Retarding Structure
- Page 73 and 74: Powerline Flood Retarding Structure
- Page 75 and 76: Powerline Flood Retarding Structure
- Page 77 and 78: Powerline Flood Retarding Structure
- Page 79 and 80: Powerline Flood Retarding Structure
- Page 81 and 82: Powerline Flood Retarding Structure
- Page 83 and 84: Powerline Flood Retarding Structure
- Page 85 and 86: Powerline Flood Retarding Structure
- Page 87 and 88: Powerline Flood Retarding Structure
- Page 89 and 90: Signal Butte Rd Meridian Rd Ironwoo
- Page 91: POWERLINE FRS TYPICAL SECTION
- Page 95 and 96: Ironwood Rd Gantzel Rd Mountain Vie
- Page 97 and 98: Figure 22 Figure 21 - Conceptual Mu
- Page 99 and 100: K:\PHX_WaterResources\91131019\CADD
- Page 101 and 102: K:\PHX_WaterResources\91131019\CADD
- Page 103 and 104: Exhibit A-2 - Emergency Spillway Di
- Page 105 and 106: Price Price Price Dobson Alma Schoo
- Page 107 and 108: Powerline Flood Retarding Structure
- Page 109 and 110: Powerline Flood Retarding Structure
<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />
Pinal County, AZ<br />
Draft Supplemental Watershed <strong>Plan</strong><br />
<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />
Table 6-4 Effects of the Alternatives on Resources of National Recognition<br />
Types of Resources<br />
Air Quality<br />
Coastal Zone<br />
Endangered &<br />
Threatened Species<br />
Critical Habitat<br />
Fish <strong>and</strong> Wildlife<br />
Habitat<br />
<strong>Flood</strong>plains<br />
Historic <strong>and</strong> Cultural<br />
Properties<br />
Prime <strong>and</strong> Unique<br />
Farml<strong>and</strong><br />
Water Quality<br />
Principal Sources of<br />
National Recognition<br />
Clean Air Act, as amended<br />
(42 USC 7401 et seq.)<br />
Coastal Zone Management<br />
Act of 1972, as amended (16<br />
USC 1451 et seq.)<br />
Endangered Species Act of<br />
1973, as amended (16 USC<br />
1531 et seq.)<br />
Fish <strong>and</strong> Wildlife<br />
Coordination Act (16 USC<br />
661 et seq.)<br />
Executive Order 11988, <strong>Flood</strong><br />
plain Management<br />
National Historic Preservation<br />
Act of 1966, as amended (16<br />
USC 470 et seq)<br />
CEQ Memor<strong>and</strong>um of August<br />
1, 1980: Analysis of Impacts<br />
on Prime or Unique<br />
Agricultural L<strong>and</strong>s in<br />
Implementing the National<br />
<strong>Environ</strong>mental Policy Act,<br />
Farml<strong>and</strong> Protection Policy<br />
Act of 1981.<br />
Clean Water Act of 1977, as<br />
amended (33 USC 1251 et<br />
seq.)<br />
Alternative 1<br />
No Federal<br />
Action<br />
No effect<br />
No effect<br />
No effect<br />
No effect<br />
No effect<br />
No effect<br />
No effect<br />
No effect<br />
Measurement of Effects<br />
Alternative 2<br />
Decommissioning<br />
Sponsor's<br />
Preferred/NED <strong>Plan</strong><br />
Short-term minor adverse<br />
effect during<br />
construction.<br />
No effect<br />
No effect<br />
Short-term minor adverse<br />
effect during<br />
construction.<br />
Establish floodplain<br />
associated with channel.<br />
Sites in the APE that will<br />
not be subject to projectrelated<br />
impacts will be<br />
avoided by project<br />
implementation<br />
activities. Data recovery<br />
studies will be performed<br />
to mitigate impacts to all<br />
sites likely to suffer<br />
project-related impacts<br />
No effect<br />
No effect<br />
USDA- NRCS Page 6-13 <strong>Jan</strong>uary <strong>2013</strong><br />
Kimley-Horn <strong>and</strong> Associates, Inc.