<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />
Pinal County, AZ<br />
Draft Supplemental Watershed <strong>Plan</strong><br />
<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />
Table 6–2 Summary <strong>and</strong> Comparison of C<strong>and</strong>idate <strong>Plan</strong>s – EQ Account (continued)<br />
PLANTS<br />
Vegetative Communities<br />
ANIMALS<br />
Fish <strong>and</strong> Wildlife<br />
Habitat<br />
Threatened <strong>and</strong><br />
Endangered Species<br />
Migratory Birds/Bald<br />
<strong>and</strong> Golden Eagles<br />
HUMANS<br />
Aesthetics<br />
Alternative 1 Alternative 2<br />
No Federal Action<br />
Decommissioning<br />
Sponsor's Preferred/NED <strong>Plan</strong><br />
No effect<br />
No effect<br />
No effect<br />
No effect<br />
No effect<br />
Removal of existing vegetation<br />
within project footprint. Effect<br />
minimized due to post-construction<br />
hydro-seeding <strong>and</strong> other mitigation<br />
measures.<br />
Short-term minor adverse effect<br />
during construction<br />
No effect<br />
Mitigation for burrowing owl<br />
Moderate effects during<br />
construction, no long-term effect;<br />
provides opportunity for multi-use<br />
<strong>Flood</strong> Damages<br />
Cost, Sponsor<br />
Cost, NED<br />
Historic Properties/Cultural<br />
Resources<br />
Downstream properties,<br />
residences, business at<br />
risk from inundation<br />
from dam failure or dam<br />
overtopping<br />
Continued O&M costs<br />
No effect<br />
No effect<br />
<strong>Powerline</strong> channel discharge to<br />
Vineyard Road FRS. Reduced risk<br />
of downstream flood damages.<br />
Action will require significant<br />
expenditure of funds.<br />
Action will require significant<br />
expenditure of funds.<br />
Sites in the APE that will not be<br />
subject to project-related impacts<br />
will be avoided by project<br />
implementation activities. Data<br />
recovery studies will be performed<br />
to mitigate impacts to all sites likely<br />
to suffer project-related impacts.<br />
USDA- NRCS Page 6-11 <strong>Jan</strong>uary <strong>2013</strong><br />
Kimley-Horn <strong>and</strong> Associates, Inc.