06.11.2014 Views

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />

Pinal County, AZ<br />

Draft Supplemental Watershed <strong>Plan</strong><br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

Table 6–2 Summary <strong>and</strong> Comparison of C<strong>and</strong>idate <strong>Plan</strong>s – EQ Account (continued)<br />

PLANTS<br />

Vegetative Communities<br />

ANIMALS<br />

Fish <strong>and</strong> Wildlife<br />

Habitat<br />

Threatened <strong>and</strong><br />

Endangered Species<br />

Migratory Birds/Bald<br />

<strong>and</strong> Golden Eagles<br />

HUMANS<br />

Aesthetics<br />

Alternative 1 Alternative 2<br />

No Federal Action<br />

Decommissioning<br />

Sponsor's Preferred/NED <strong>Plan</strong><br />

No effect<br />

No effect<br />

No effect<br />

No effect<br />

No effect<br />

Removal of existing vegetation<br />

within project footprint. Effect<br />

minimized due to post-construction<br />

hydro-seeding <strong>and</strong> other mitigation<br />

measures.<br />

Short-term minor adverse effect<br />

during construction<br />

No effect<br />

Mitigation for burrowing owl<br />

Moderate effects during<br />

construction, no long-term effect;<br />

provides opportunity for multi-use<br />

<strong>Flood</strong> Damages<br />

Cost, Sponsor<br />

Cost, NED<br />

Historic Properties/Cultural<br />

Resources<br />

Downstream properties,<br />

residences, business at<br />

risk from inundation<br />

from dam failure or dam<br />

overtopping<br />

Continued O&M costs<br />

No effect<br />

No effect<br />

<strong>Powerline</strong> channel discharge to<br />

Vineyard Road FRS. Reduced risk<br />

of downstream flood damages.<br />

Action will require significant<br />

expenditure of funds.<br />

Action will require significant<br />

expenditure of funds.<br />

Sites in the APE that will not be<br />

subject to project-related impacts<br />

will be avoided by project<br />

implementation activities. Data<br />

recovery studies will be performed<br />

to mitigate impacts to all sites likely<br />

to suffer project-related impacts.<br />

USDA- NRCS Page 6-11 <strong>Jan</strong>uary <strong>2013</strong><br />

Kimley-Horn <strong>and</strong> Associates, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!