06.11.2014 Views

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />

Pinal County, AZ<br />

Draft Supplemental Watershed <strong>Plan</strong><br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

ITEM/CONCERN<br />

Table 3–1 Evaluation of Identified Concerns (continued)<br />

Relevant to the<br />

proposed<br />

action? 1/<br />

RATIONALE<br />

PLANTS<br />

Natural Areas X No natural areas in study area<br />

Riparian Areas X No riparian areas in study area<br />

Forest Resources X Not Applicable<br />

Parkl<strong>and</strong>s X None Present<br />

Vegetative Communities X Mesquite Bosque located upstream of structure<br />

ANIMALS<br />

Fish <strong>and</strong> Wildlife<br />

Habitat<br />

X<br />

No fish present in study area. Mesquite Bosque<br />

habitat located upstream of structure.<br />

Threatened <strong>and</strong><br />

X<br />

Endangered Species<br />

No occurrences in study area.<br />

Invasive Species X Minimal invasive species present on study area<br />

Migratory Birds/Bald<br />

X<br />

<strong>and</strong> Golden Eagles<br />

Potential habitat for western burrowing owl.<br />

HUMANS<br />

Aesthetics X Structures are significant features on l<strong>and</strong>scape<br />

<strong>Flood</strong> Damages<br />

X<br />

Substantial downstream damages from<br />

flooding from catastrophic dam failure is no<br />

action taken<br />

Action will require significant expenditure of<br />

X<br />

Cost, Sponsor<br />

funds.<br />

Action will require significant expenditure of<br />

X<br />

Cost, NED<br />

funds.<br />

Historic Properties/Cultural<br />

Resources<br />

<strong>Environ</strong>mental Justice<br />

X<br />

X<br />

Cultural Resources have been identified in the<br />

vicinity of the structures.<br />

Minority <strong>and</strong> disadvantaged populations are at<br />

high risk in the event of a catastrophic failure<br />

of the dam if no action is taken<br />

Local <strong>and</strong> Regional<br />

X<br />

Structures provide flood protection to<br />

Economy<br />

downstream benefitted area.<br />

Scientific Resources X Not Applicable<br />

Potable Water Supply X No potable water system within study area.<br />

Public Health <strong>and</strong> Safety is at high risk in the<br />

X<br />

event of a catastrophic failure of the dam if no<br />

Public Health <strong>and</strong> Safety<br />

action is taken<br />

Recreation X Opportunities for recreational elements<br />

1/ Concerns relevant to the proposed action must be considered in the analysis of alternatives<br />

USDA- NRCS Page 3-3 <strong>Jan</strong>uary <strong>2013</strong><br />

Kimley-Horn <strong>and</strong> Associates, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!