06.11.2014 Views

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />

Pinal County, AZ<br />

Draft Supplemental Watershed <strong>Plan</strong><br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

Stability Design Hydrograph <strong>and</strong> Freeboard Hydrograph Technical Memor<strong>and</strong>um.” July<br />

2010.<br />

Kimley-Horn <strong>and</strong> Associates, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project - PVR Existing <strong>and</strong> Future Conditions<br />

Hydrology <strong>and</strong> Hydraulics Updated Technical Report.” July 2010.<br />

Kimley-Horn <strong>and</strong> Associates, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project – Social Population <strong>and</strong> Demographics<br />

Existing Conditions Study.” July 2010.<br />

Kimley-Horn <strong>and</strong> Associates, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project Stakeholder Alternatives Workshop<br />

Meeting Minutes”, September 2010.<br />

Kimley-Horn <strong>and</strong> Associates, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project Alternatives Screening Workshop<br />

Meeting Notes”, December 2010.<br />

Kimley-Horn <strong>and</strong> Associates, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project Final Level I Alternatives Summary<br />

Report”, February 2011.<br />

Kimley-Horn <strong>and</strong> Associates, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project Technical Memor<strong>and</strong>um for Earthwork”,<br />

June 2011.<br />

Kimley-Horn <strong>and</strong> Associates, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project Final Level II Alternatives Summary<br />

Report”, June, 2012.<br />

Kimley-Horn <strong>and</strong> Associates, Inc. “<strong>Powerline</strong>, Vineyard Road <strong>and</strong> Rittenhouse <strong>Flood</strong> Retarding<br />

Structures Rehabilitation or Replacement Project Final Level III Alternatives Summary<br />

Report”, November 2011.<br />

USDA, NRCS. “Part 630 Hydrology – National Engineering H<strong>and</strong>book”, Chapter 21, Revised<br />

August 1972.<br />

USDA, NRCS. “<strong>Plan</strong>s for the Construction of <strong>Powerline</strong> <strong>Flood</strong>water Retarding Dam”, June 6,<br />

1966.<br />

USDA, NRCS. “<strong>Plan</strong>s for the Construction of Rittenhouse <strong>Flood</strong>water Retarding Structure, Asbuilt”,<br />

June 1968.<br />

USDA, NRCS. “<strong>Plan</strong>s for the Construction of Vineyard Road <strong>Flood</strong>water Retarding Dam, Asbuilt”,<br />

June 1967<br />

USDA- NRCS <strong>Jan</strong>uary <strong>2013</strong><br />

Kimley-Horn <strong>and</strong> Associates, Inc. Page 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!