06.11.2014 Views

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

Powerline Plan and Environ. Assessment Jan. 2013 - Flood Control ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />

Pinal County, AZ<br />

Draft Supplemental Watershed <strong>Plan</strong><br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

2. HYDROLOGY AND HYDRAULICS<br />

This section of the “Investigations <strong>and</strong> Analyses Report” provides a summary of the hydrologic<br />

<strong>and</strong> hydraulics analysis in previous investigations as well as studies conducted by Kimley-Horn<br />

for the PVR project.<br />

2.1. Previous Studies<br />

Previous existing conditions of the PVR FRS watersheds have been studied as part of the<br />

following investigations:<br />

• “Desert Drive Area Study Existing Conditions Hydrology” (DDA Existing Conditions<br />

Hydrology) by the Arizona State L<strong>and</strong> Department (ASLD, 2007)<br />

o The Arizona State L<strong>and</strong> Department conducted an existing conditions hydrology<br />

study for an area of State L<strong>and</strong>s known as Desert Drive Area (DDA). The Desert<br />

Drive Area study includes the PVR structures <strong>and</strong> their contributing watersheds.<br />

The purpose of the hydrology study was to determine the rainfall runoff response<br />

for the Desert Drive Area under existing conditions.<br />

o HEC- 1 models were developed for the l00-year, 200-year, 500-year, <strong>and</strong> PMF<br />

storm events. The 100-year, 200-year <strong>and</strong> 500-year storm events were analyzed<br />

for 6-hour <strong>and</strong> 24-hour storm durations. The PMF storms were analyzed for the<br />

6-hour <strong>and</strong> 72-hour storms. For the Desert Drive Area downstream of the PVR<br />

structures, only the 100-year, 6-hour <strong>and</strong> 24-hour models were developed.<br />

• “Desert Drive Area Study Existing Conditions Inundation <strong>and</strong> Sedimentation Analysis<br />

for PVR Structures (DDA Inundation <strong>and</strong> Sedimentation) by the Arizona State L<strong>and</strong><br />

Department (ASLD 2008).<br />

This is Volume II of the Desert Drive Area study. This study utilized FLO-2D software to<br />

create a two dimensional model of the discharges entering the PVR structures. The FLO-<br />

2D model was completed in order to evaluate the interconnected character of the PVR<br />

Structures <strong>and</strong> to determine the existing condition inundation limits of the structures for<br />

the 100-year, 24-hour storm <strong>and</strong> the 6-hour <strong>and</strong> 72-hour PMF events (full <strong>and</strong> half). The<br />

results of the analysis provide overtopping depths <strong>and</strong> durations for each of the storms<br />

evaluated.<br />

2.2. Hydrologic Design Criteria<br />

The rehabilitation or replacement of the PVR structures must meet the most critical design<br />

criteria between NRCS, ADWR <strong>and</strong> District hydrologic design criteria. The project must meet<br />

both District <strong>and</strong> NRCS requirements for flood protection <strong>and</strong> District, NRCS <strong>and</strong> ADWR<br />

requirements for dam safety. NRCS design criteria, flood protection, <strong>and</strong> dam safety<br />

requirements are documented in “Earth Dams <strong>and</strong> Reservoirs,” Technical Release No. 60, dated<br />

July 2005. ADWR design criteria <strong>and</strong> dam safety requirements are documented in the “Arizona<br />

Administrative Code Title 12, Chapter 15, Article 12 – Dam Safety Procedures” dated June 12,<br />

2000.<br />

Per NRCS criteria for High Hazard Dams, the principal spillway design flood is the 100-year <strong>and</strong><br />

10-day storm, <strong>and</strong> the principal spillway must have: a) the capacity to prevent the auxiliary<br />

spillway from functioning more frequently than the 100 year event. ADWR requires that the<br />

USDA- NRCS <strong>Jan</strong>uary <strong>2013</strong><br />

Kimley-Horn <strong>and</strong> Associates, Inc. Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!