<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />
Pinal County, AZ<br />
Draft Supplemental Watershed <strong>Plan</strong><br />
<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />
Estimated Project Costs:<br />
Item<br />
PL 83-566<br />
Funds ($)<br />
Other Funds<br />
($) 1/ Total ($)<br />
Construction Cost $14,826,200 $7,321,800 $22,148,000<br />
Technical Assistance $600,000 $651,500 $1,251,500<br />
Project Administration $50,000 $10,000 $60,000<br />
L<strong>and</strong> Rights (Sponsors) $0 $0 $0<br />
Required Permits<br />
(Sponsors)<br />
$0 $434,300 $434,300<br />
Total $15,476,200 $8,630,300 $23,893,800<br />
1/ The Sponsor’s annual operation <strong>and</strong> maintenance cost for the project is $212,700.<br />
Estimated Project Benefits:<br />
An estimated 27,100 current residents, associated homes, businesses, <strong>and</strong> infrastructure are<br />
protected from catastrophic dam failure <strong>and</strong> flooding. Additional residents <strong>and</strong> infrastructure<br />
will be protected in the future as development continues to occur in the downstream benefitted<br />
area.<br />
Category<br />
Average Annual Equivalent<br />
Benefits<br />
Beneficial Annual 1/ $0<br />
Adverse Annual $1,006,700<br />
Net Beneficial ($1,006,700)<br />
Benefit-Cost Ratio 0.0 to 1.0<br />
1/ The proposed project will provide an estimated $14,779,300 in average annual equivalent damage reduction benefits. However, as the "no action"<br />
or future without project alternative also provides this same benefit stream, the project does not have a positive incremental benefit. The benefits of<br />
the project are tied to reducing the risk of catastrophic failure of the existing structures <strong>and</strong> thus reducing the risk to life <strong>and</strong> property, as described in<br />
the plan.<br />
Funding Schedule: <strong>Powerline</strong> FRS FY 2022 (Vineyard Road FRS FY 2018; Rittenhouse FRS FY<br />
2024)<br />
Period of Analysis: 103 Years<br />
Project Life: 100 Years<br />
<strong>Environ</strong>mental Effects <strong>and</strong> Impacts:<br />
1. Cultural Resources – Sites in the area of potential effects that will not be subject to projectrelated<br />
impacts will be avoided by project implementation activities. Data recovery<br />
studies will be performed to mitigate impacts to all sites likely to suffer project-related<br />
impacts. Based on known sites in the vicinity, the majority of the cultural resources<br />
present would be either prehistoric sites without evidence of habitation (which might<br />