<strong>Powerline</strong> <strong>Flood</strong> Retarding Structure<br />

Pinal County, AZ<br />

Draft Supplemental Watershed <strong>Plan</strong><br />

<strong>and</strong> <strong>Environ</strong>mental <strong>Assessment</strong><br />

Estimated Project Costs:<br />

Item<br />

PL 83-566<br />

Funds ($)<br />

Other Funds<br />

($) 1/ Total ($)<br />

Construction Cost $14,826,200 $7,321,800 $22,148,000<br />

Technical Assistance $600,000 $651,500 $1,251,500<br />

Project Administration $50,000 $10,000 $60,000<br />

L<strong>and</strong> Rights (Sponsors) $0 $0 $0<br />

Required Permits<br />

(Sponsors)<br />

$0 $434,300 $434,300<br />

Total $15,476,200 $8,630,300 $23,893,800<br />

1/ The Sponsor’s annual operation <strong>and</strong> maintenance cost for the project is $212,700.<br />

Estimated Project Benefits:<br />

An estimated 27,100 current residents, associated homes, businesses, <strong>and</strong> infrastructure are<br />

protected from catastrophic dam failure <strong>and</strong> flooding. Additional residents <strong>and</strong> infrastructure<br />

will be protected in the future as development continues to occur in the downstream benefitted<br />

area.<br />

Category<br />

Average Annual Equivalent<br />

Benefits<br />

Beneficial Annual 1/ $0<br />

Adverse Annual $1,006,700<br />

Net Beneficial ($1,006,700)<br />

Benefit-Cost Ratio 0.0 to 1.0<br />

1/ The proposed project will provide an estimated $14,779,300 in average annual equivalent damage reduction benefits. However, as the "no action"<br />

or future without project alternative also provides this same benefit stream, the project does not have a positive incremental benefit. The benefits of<br />

the project are tied to reducing the risk of catastrophic failure of the existing structures <strong>and</strong> thus reducing the risk to life <strong>and</strong> property, as described in<br />

the plan.<br />

Funding Schedule: <strong>Powerline</strong> FRS FY 2022 (Vineyard Road FRS FY 2018; Rittenhouse FRS FY<br />

2024)<br />

Period of Analysis: 103 Years<br />

Project Life: 100 Years<br />

<strong>Environ</strong>mental Effects <strong>and</strong> Impacts:<br />

1. Cultural Resources – Sites in the area of potential effects that will not be subject to projectrelated<br />

impacts will be avoided by project implementation activities. Data recovery<br />

studies will be performed to mitigate impacts to all sites likely to suffer project-related<br />

impacts. Based on known sites in the vicinity, the majority of the cultural resources<br />

present would be either prehistoric sites without evidence of habitation (which might<br />

USDA- NRCS Page 1-4 <strong>Jan</strong>uary <strong>2013</strong><br />