pdf, 1Mb - Auroville Green Practices

pdf, 1Mb - Auroville Green Practices pdf, 1Mb - Auroville Green Practices

green.aurovilleportal.org
from green.aurovilleportal.org More from this publisher
03.11.2014 Views

Solar Charging Stations • First station set up in 2009 for four vehicles to charge simultaneously • Plans to build more, with additional features using our battery monitoring system to correctly gauge remaining charge capacity in the charging station • Developing a model for gridconnected charging stations using a prepaid card system which could be widely adopted Electric Two Wheeler Solutions | Akash Heimlich Auroville Green Practices Seminar 2010 6 of 7 Electric Two Wheeler Solutions | Akash Heimlich Auroville Green Practices Seminar 2010 7 of 7

Electric Two Wheeler Solutions | Akash Heimlich Auroville Green Practices Seminar 2010 8 of 7 The HumVee Akash Heimlich EV Future Contact: T:+91 413 - 2622380 E:evfuture@auroville.org.in W: www.evfuture.com Electric Two Wheeler Solutions | Akash Heimlich Auroville Green Practices Seminar 2010 9 of 7

Solar Charging Stations<br />

• First station set up in 2009 for four<br />

vehicles to charge simultaneously<br />

• Plans to build more, with additional<br />

features using our battery monitoring<br />

system to correctly gauge remaining<br />

charge capacity in the charging<br />

station<br />

• Developing a model for gridconnected<br />

charging stations using<br />

a prepaid card system which could<br />

be widely adopted<br />

Electric Two Wheeler Solutions | Akash Heimlich <strong>Auroville</strong> <strong>Green</strong> <strong>Practices</strong> Seminar 2010 6 of 7<br />

Electric Two Wheeler Solutions | Akash Heimlich <strong>Auroville</strong> <strong>Green</strong> <strong>Practices</strong> Seminar 2010 7 of 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!