02.11.2014 Views

Institutional Equities - Online Share Trading

Institutional Equities - Online Share Trading

Institutional Equities - Online Share Trading

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Institutional</strong> <strong>Equities</strong><br />

Exhibit 55: Recent order inflow trend (April 2011 till date)<br />

Apr-11 Companies Rsmn Order description<br />

Sadbhav Engineering. 2,362 EPC project work for Sardar Sarovar Narmda Nigam, Gandhinagar, Gujarat<br />

Ahluwalia Contracts 5,350 Construction of residential commercial, institutional buildings<br />

Supreme Infrastructure 3,600 Construction of building complex for Oswal Chemicals<br />

Punj Llyod 1,140 Railway contract<br />

Unity Infrastructure 893 Construction of office building in Hyderabad for IRDA<br />

Pratibha Industries 2,415 Construction and rehabilitation of transmission main for Goa water supply authority<br />

Pratibha Industries 606 Secures contract for construction of residential building<br />

Pratibha Industries 1,010 Secures water supply project<br />

May-11 Companies Rsmn Order description<br />

HCC 2,986 Construction work of Limbdi branch canal in Gujarat<br />

Unity Infrastructure 1,980 Construction order<br />

L&T 35,000 Secures gas-based power plant EPC order from PPN Power<br />

L&T 14,500 Gets GSPC contract for offshore process platform in KG basin<br />

Pratibha Industries 2,381 Design and construction of tunnel for Delhi MRTS project<br />

Unity Infrastructure 1,437 Construction of city road in Nagpur, construction of hostel in Pune<br />

IVRCL 2,947 Water supply authority order<br />

5,175 Building construction order<br />

442 Power plant construction order<br />

373 Order from the transportation segment<br />

Valecha engineering 3,214 Order for road construction<br />

Jun-11 Companies Rsmn Order description<br />

Punj Llyod 8,900 Onshore oil operations for carrying out EPC in South East, Abu Dhabi.<br />

ARSS Infrastructure 2,075 Two orders from Madhya Pradesh Road Development Corporation for road construction<br />

Punj Llyod 6,780 EPC nuclear power contract from NPCIL<br />

L&T 13,660 Orders from the Gulf for power transmission, constructing sub-station<br />

L&T 26,000 Concession agreement with NHAI<br />

L&T 41,000 Constructing office building, factories<br />

L&T 16,100 Metallurgical and material handling system for Tata Steel, Indiabulls Power<br />

Punj Llyod 8,260 Offshore contract from GSPC<br />

HCC 7,010 Construction of Tehri pumped storage project plant, Uttarakhand<br />

Unity Infrastructure 997 Construction of Harsi high level main canal<br />

Jul-11 Companies Rsmn Order description<br />

NCC 8,150 Rs2,150mn order from Rail Vikas Nigam, Rs1,590mn order from CIDCO<br />

Punj Llyod 990 Kolkata West International City contract<br />

L&T 12,100 Construction order from Qatar in the electrical space<br />

Ahluwalia Contracts 4,820 Construction of residential, commercial, institutional buildings<br />

Punj Llyod 2,100 Civil contract for thermal power project of NTPC, Assam<br />

Pratibha Industries 12,490 Order from Delhi Jal Board<br />

Valecha Engineering 1,480 Construction of roads in Madhya Pradesh, Kota<br />

Jaypee Associates 20,790 Secures two contracts from Punatsangchhu-II Hydro-electric Project Authority, Bhutan<br />

Punj Llyod 3,300 To build process facilities for crude oil storage cavern in Mangalore<br />

Aug-11 Companies Rsmn Order description<br />

McNally Bharat Engineering 1,093 Order from BECL for design, engineering, commissioning of ash handling system package for 2X 250MW thermal plant<br />

ARSS Infrastructure 2,335 Order for development, O&M of Ropar-Chamkaur Sahib -Neefon-Dorah road on DBFOT basis<br />

Jyoti Structures 4,380 M. P. Vidyut Vitran Companies Limited for feeder separation programme<br />

L&T 40,005 Hydrocarbon order from Abu Dhabi gas industry<br />

Sadbhav Engineering 2,020 Road and irrigation project from Bihar Road State Development<br />

L&T 13,400 Construction of residential and commercial buildings<br />

Sep-11 Companies Rsmn Order description<br />

NCC 6,290 Order from Water Resources Division at Raigarh, Chhattisgarh, and MSEDCL, Mumbai, for turnkey contracts<br />

L&T 10,150 Order for construction of office building, factories<br />

L&T 7000 Bagged order from Petroleum Development Oman LLC<br />

IVRCL 22289 Construction of road and building ,water transportation project.<br />

Source: Company, Nirmal Bang <strong>Institutional</strong> <strong>Equities</strong> Research<br />

24 Infrastructure Sector

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!