<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />

3.10.2.2 <strong>Wambo</strong> Rail Development Vibration<br />

Monitoring<br />

Construction of the <strong>Wambo</strong> <strong>Coal</strong> Terminal (WCT)<br />

commenced in May 2005 and has been operational<br />

since June 2006. Quarterly vibration monitoring was<br />

undertaken between 2005 and 2008 for the WRD in<br />

accordance with DA 177-8-2004, Schedule 4,<br />

Condition 12, and the approved <strong>Wambo</strong> Rail<br />

Development Vibration Monitoring Program.<br />

Monitoring results from 2005 to 2008 concluded that<br />

WRD has not increased vibration levels in the<br />

Warkworth area. In the previous reporting period<br />

(2008/2009), WCPL engaged a vibration consultant<br />

to complete a summary of all of the vibration<br />

monitoring results since the construction of the<br />

WCT. The summary report was sent to the DoP to<br />

seek approval to discontinue monitoring and<br />

approval was granted in December 2008.<br />

3.11 Operational Noise<br />

3.11.1 Environmental Management<br />

Noise monitoring is undertaken in accordance with<br />

WCPL’s approved Noise Monitoring Program<br />

(NMP).<br />

A number of proactive management measures<br />

designed to minimise noise generation from<br />

operations at WCPL and the WRD have been<br />

implemented over the reporting period including:<br />

<br />

Regular maintenance of plant and equipment<br />

and pre-start up inspections;<br />

The applicant shall ensure noise emissions from the<br />

operation of the JPRL when measured at any<br />

residence along the railway line corridor shall not<br />

exceed the following EPA criteria<br />

a) Planning level of L Aeq24hr 55dB(A); and<br />

b) Maximum pass-by level of L Amax 85dB(A).<br />

Real Time Noise Monitoring<br />

Four real-time monitoring locations have been<br />

established at representative locations to the south<br />

and north-west of WCPL.<br />

The noise environment surrounding WCPL is<br />

monitored using four fixed remote continuous noise<br />

monitors. The monitors are installed on properties<br />

identified in the WCPL’s NMP, including Kelly (N03),<br />

Muller (N16), Thelander (N20) and the WCPL<br />

owned WA (N21).<br />

Attended Noise monitoring<br />

Attended environmental noise monitoring was<br />

undertaken on a quarterly basis at five sites during<br />

Quarters (3) and (4) <strong>2011</strong> and Quarters (1) and (2)<br />

<strong>2012</strong> around the mine. The survey purpose is to<br />

quantify and describe the existing acoustic<br />

environment around WCPL and WRD and compare<br />

results with relevant development consent<br />

conditions or modelled EIS noise levels. Noise<br />

levels from WCPL complied with the development<br />

consent criteria or modelled noise levels at all sites<br />

during the <strong>2011</strong>/<strong>2012</strong> attended monitoring (see<br />

Figure 3.1).<br />

Positioning of portable generators and<br />

machinery to take advantage of natural and<br />

man made barriers to mitigate sound travel;<br />

<br />

Equipment is turned off or throttled down when<br />

not in use;<br />

Construction of noise and visual bunds<br />

surrounding the operational activities; and<br />

<br />

Minimal disturbance of vegetation between the<br />

site and nearby residences to provide a screen<br />

to mitigate sound dispersal.<br />

The noise monitoring criteria for the mine and WRD<br />

are presented in Table 3.3. The noise criteria only<br />

apply to noise generated from WCPL’s mining<br />

operations, rail loop and rail loading operations.<br />

In addition to these noise criteria the <strong>Wambo</strong> rail<br />

line also has rail pass-by criteria as set out in<br />

consent DA 235/97 from SSC. These criteria are<br />

listed in consent Condition 8 DA 235/97 and are as<br />

follows:<br />

Page 68