3.10.2.2 <strong>Wambo</strong> Rail Development Vibration<br />
Monitoring<br />
Construction of the <strong>Wambo</strong> <strong>Coal</strong> Terminal (WCT)<br />
commenced in May 2005 and has been operational<br />
since June 2006. Quarterly vibration monitoring was<br />
undertaken between 2005 and 2008 for the WRD in<br />
accordance with DA 177-8-2004, Schedule 4,<br />
Condition 12, and the approved <strong>Wambo</strong> Rail<br />
Development Vibration Monitoring Program.<br />
Monitoring results from 2005 to 2008 concluded that<br />
WRD has not increased vibration levels in the<br />
Warkworth area. In the previous reporting period<br />
(2008/2009), WCPL engaged a vibration consultant<br />
to complete a summary of all of the vibration<br />
monitoring results since the construction of the<br />
WCT. The summary report was sent to the DoP to<br />
seek approval to discontinue monitoring and<br />
approval was granted in December 2008.<br />
3.11 Operational Noise<br />
3.11.1 Environmental Management<br />
Noise monitoring is undertaken in accordance with<br />
WCPL’s approved Noise Monitoring Program<br />
(NMP).<br />
A number of proactive management measures<br />
designed to minimise noise generation from<br />
operations at WCPL and the WRD have been<br />
implemented over the reporting period including:<br />
<br />
Regular maintenance of plant and equipment<br />
and pre-start up inspections;<br />
The applicant shall ensure noise emissions from the<br />
operation of the JPRL when measured at any<br />
residence along the railway line corridor shall not<br />
exceed the following EPA criteria<br />
a) Planning level of L Aeq24hr 55dB(A); and<br />
b) Maximum pass-by level of L Amax 85dB(A).<br />
Real Time Noise Monitoring<br />
Four real-time monitoring locations have been<br />
established at representative locations to the south<br />
and north-west of WCPL.<br />
The noise environment surrounding WCPL is<br />
monitored using four fixed remote continuous noise<br />
monitors. The monitors are installed on properties<br />
identified in the WCPL’s NMP, including Kelly (N03),<br />
Muller (N16), Thelander (N20) and the WCPL<br />
owned WA (N21).<br />
Attended Noise monitoring<br />
Attended environmental noise monitoring was<br />
undertaken on a quarterly basis at five sites during<br />
Quarters (3) and (4) <strong>2011</strong> and Quarters (1) and (2)<br />
<strong>2012</strong> around the mine. The survey purpose is to<br />
quantify and describe the existing acoustic<br />
environment around WCPL and WRD and compare<br />
results with relevant development consent<br />
conditions or modelled EIS noise levels. Noise<br />
levels from WCPL complied with the development<br />
consent criteria or modelled noise levels at all sites<br />
during the <strong>2011</strong>/<strong>2012</strong> attended monitoring (see<br />
Figure 3.1).<br />
Positioning of portable generators and<br />
machinery to take advantage of natural and<br />
man made barriers to mitigate sound travel;<br />
<br />
Equipment is turned off or throttled down when<br />
not in use;<br />
Construction of noise and visual bunds<br />
surrounding the operational activities; and<br />
<br />
Minimal disturbance of vegetation between the<br />
site and nearby residences to provide a screen<br />
to mitigate sound dispersal.<br />
The noise monitoring criteria for the mine and WRD<br />
are presented in Table 3.3. The noise criteria only<br />
apply to noise generated from WCPL’s mining<br />
operations, rail loop and rail loading operations.<br />
In addition to these noise criteria the <strong>Wambo</strong> rail<br />
line also has rail pass-by criteria as set out in<br />
consent DA 235/97 from SSC. These criteria are<br />
listed in consent Condition 8 DA 235/97 and are as<br />
follows:<br />
Page 68