Wambo Coal AEMR 2011-2012 - Peabody Energy
Wambo Coal AEMR 2011-2012 - Peabody Energy Wambo Coal AEMR 2011-2012 - Peabody Energy
SUMP SUMP GW20 GW16 GW17 GW19 P1 P11 NORTH WAMBO CREEK DIVERSION P3 P20 STAGE 3 CREEK DIVERSION P5 P6 GW21 WAMBO CHPP GW18 WAMBO ADMIN P315 WAMBO GW09 NORTH CREEK GW08 WOLLOMBI BROOK GW15 P301 GW12 P114 P206 P116 P106 P202 GW14 STONY CREEK P109 GW02 SOUTH GW11 WAMBO CREEK GW22 GW13 Legend Colliery Holding Boundary DA Approved Open Cut Limits MOP Open Cut Limits Wambo Owned Land Wambo Ground Water Well Monitoring Site Wambo Peizometer Monitoring Site Wambo Proposed Groundwater Monitoring Site United Peizometer Monitoring Site North Wambo Underground Workings (Existing) Prepared by Pegasus Technical CAD FILE: 08674A North Wambo Underground Workings (Proposed) Dams WAMBO COAL GROUND WATER MONITORING LOCATIONS FIGURE 3.12
2011-2012 AEMR Figure 3.13a – Ground Water (Brosi Wells) Depth to Water Monthly Piezometer Monitoring 100 Series Figure 3.13b – Ground Water (Wambo Wells) Depth to Water Monthly Ground Water Monitoring Wambo Property P106 P109 P110 P111 P114 P116 GW08 - Old Well No. 1 (United Well 1) GW09 - New Well No. 2 (United Well 2) Month Month Depth to Water (m) 0 1 2 3 4 5 6 7 8 9 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Depth to Water (m) 0 1 2 3 4 5 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Figure 3.14 – Ground Water (100 Series) Depth to Water Figure 3.15 – Ground Water (200 Series) Depth to Water Monthly Piezometer Monitoring 100 Series Monthly Piezometer Monitoring 200 Series Depth to Water (m) 0 1 2 3 4 5 6 7 8 9 Jul-11 Aug-11 P106 P109 P110 P111 P114 P116 Sep-11 Oct-11 Nov-11 Dec-11 Month Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Depth to Water (m) 0 2 4 6 8 10 12 14 16 18 20 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 P202 Dec-11 Month Jan-12 P206 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Figure 3.16 – Ground Water (300 Series) Depth to Water Monthly Piezometer Monitoring 300 Series P301 P311 P315 Figure 3.17 – Ground Water (United) Depth to Water Monthly Piezometer Monitoring United Piezometers P1 P3 P5 P6 P11 P12 Depth to Water (m) 0 5 10 15 20 25 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Month Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Depth to Water (m) 0 5 10 15 20 25 30 35 Jul-11 P13 P15 P16 P17 P18 P20 Month Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Page 57
- Page 17 and 18: SUMP SUMP N NEW Muswellbrook LOCALI
- Page 19 and 20: 2011-2012 AEMR Table 1.2 - WCPL Min
- Page 21 and 22: 2011-2012 AEMR 1.3.3 Environmental
- Page 23 and 24: SUMP SUMP 5 UNITED COLLIERY GOLDEN
- Page 25 and 26: 2010-2011 AEMR 1.3.7 Subsidence Man
- Page 27 and 28: 2010-2011 AEMR 1.5 Review of 2011-2
- Page 29 and 30: 2010-2011 AEMR No DP&I Issue DP&I A
- Page 31 and 32: 2011-2012 AEMR Figure 2.2 - Vegetat
- Page 33 and 34: 2011-2012 AEMR Table 2.1 - Producti
- Page 35 and 36: 2011-2012 AEMR The exposed coal is
- Page 37 and 38: 2011-2012 AEMR Figure 2.3 - Coal Ha
- Page 39 and 40: 2011-2012 AEMR January 2009, the wa
- Page 41 and 42: 2011-2012 AEMR Table 2.3 - Stored W
- Page 43 and 44: 2011-2012 AEMR Table 2.4 - WCPL Was
- Page 45 and 46: 2011-2012 AEMR reference creeks for
- Page 47 and 48: 2011-2012 AEMR The purpose of the e
- Page 49 and 50: SUMP SUMP N19 SW46 SW45 Hunter Rive
- Page 51 and 52: 2011-2012 AEMR Figure 3.4 - 2010-20
- Page 53 and 54: 2011-2012 AEMR 3.2.1.2 Penalty Infr
- Page 55 and 56: 2011-2012 AEMR 3.2.2.3 PM 10 Four r
- Page 57 and 58: 2011-2012 AEMR Particulate Matter A
- Page 59 and 60: 2011-2012 AEMR Assessment criterion
- Page 61 and 62: 2011-2012 AEMR 3.4 Surface Water 3.
- Page 63 and 64: 2011-2012 AEMR Variations in TSS ob
- Page 65 and 66: 2011-2012 AEMR replacement program
- Page 67: 2011-2012 AEMR Table 3.2 - Groundwa
- Page 71 and 72: 2011-2012 AEMR 3.6 Contaminated Lan
- Page 73 and 74: 2011-2012 AEMR prior to undermining
- Page 75 and 76: SUMP SUMP V10-A2 NORTH WAMBO CREEK
- Page 77 and 78: 2011-2012 AEMR 3.8 Weeds 3.8.1 Envi
- Page 79 and 80: 2011-2012 AEMR WCPL’s development
- Page 81 and 82: 2011-2012 AEMR Day L Aeq(15 minute)
- Page 83 and 84: 2011-2012 AEMR Disturbance (L A1,1m
- Page 85 and 86: 2011-2012 AEMR Stakeholders (WACS)
- Page 87 and 88: 2011-2012 AEMR 3.13.2 European Heri
- Page 89 and 90: 2011-2012 AEMR 3.15 Bushfire Manage
- Page 91 and 92: 2011-2012 AEMR non-sensitive enviro
- Page 93 and 94: 2011-2012 AEMR Table 4.1 - WCPL Emp
- Page 95 and 96: 2011-2012 AEMR 4.3 Community Liaiso
- Page 97 and 98: 2011-2012 AEMR 5.0 Rehabilitation T
- Page 99 and 100: 2011-2012 AEMR 5.1.1.1 Rehabilitati
- Page 101 and 102: 2011-2012 AEMR 5.1.3 NWC Diversion
- Page 103 and 104: 2011-2012 AEMR Riparian EFA Riparia
- Page 105 and 106: Appendix 1 Rail Haulage Records
- Page 107 and 108: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 109 and 110: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 111 and 112: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 113 and 114: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 115 and 116: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 117 and 118: Wambo Coal Pty Ltd AEMR 2011-2012 R
SUMP<br />
SUMP<br />
GW20<br />
GW16 GW17 GW19<br />
P1<br />
P11<br />
NORTH WAMBO CREEK<br />
DIVERSION<br />
P3<br />
P20<br />
STAGE 3 CREEK<br />
DIVERSION<br />
P5<br />
P6<br />
GW21<br />
WAMBO CHPP<br />
GW18<br />
WAMBO ADMIN<br />
P315<br />
WAMBO<br />
GW09<br />
NORTH<br />
CREEK<br />
GW08<br />
WOLLOMBI<br />
BROOK<br />
GW15<br />
P301<br />
GW12<br />
P114 P206<br />
P116<br />
P106<br />
P202<br />
GW14<br />
STONY<br />
CREEK<br />
P109<br />
GW02<br />
SOUTH<br />
GW11<br />
WAMBO<br />
CREEK<br />
GW22<br />
GW13<br />
Legend<br />
Colliery Holding Boundary<br />
DA Approved Open Cut Limits<br />
MOP Open Cut Limits<br />
<strong>Wambo</strong> Owned Land<br />
<strong>Wambo</strong> Ground Water Well Monitoring Site<br />
<strong>Wambo</strong> Peizometer Monitoring Site<br />
<strong>Wambo</strong> Proposed Groundwater Monitoring Site<br />
United Peizometer Monitoring Site<br />
North <strong>Wambo</strong> Underground Workings (Existing)<br />
Prepared by Pegasus Technical CAD FILE: 08674A<br />
North <strong>Wambo</strong> Underground<br />
Workings (Proposed)<br />
Dams<br />
WAMBO COAL<br />
GROUND WATER MONITORING LOCATIONS<br />
FIGURE 3.12