<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />

reference creeks for use in assessing the relative<br />

performance of the diversion.<br />

Recommendations were made for remedial works in<br />

areas where it was considered that intervention was<br />

necessary to limit continued erosion and instability<br />

at unnaturally high rates and to reduce the potential<br />

for the erosional features from expanding into<br />

adjacent, stable areas. Recommendations were<br />

also made for ongoing revegetation and<br />

maintenance works to enhance the longer term<br />

integrity of the diversion as a whole.<br />

Subsequent remediation works were implemented<br />

by <strong>Wambo</strong> <strong>Coal</strong> in <strong>2011</strong> in response to the review.<br />

A second review 6 and survey of the diversion was<br />

conducted in mid-February <strong>2012</strong> following additional<br />

flow events experienced in late January early<br />

February <strong>2012</strong>.<br />

North <strong>Wambo</strong> Creek Diversion - View looking<br />

upstream from the third bend (15th February <strong>2012</strong>)<br />

The review involved inspections and survey of the<br />

condition of the diversion and repeat inspections of<br />

the reference creeks. This report has been compiled<br />

to document the finding of this second review. The<br />

focus of the second review has been on the<br />

changes that have occurred in the diversion<br />

between July 2009 and February <strong>2012</strong> surveys.<br />

Recommendations are made for remedial works in<br />

areas where it is considered that intervention is<br />

necessary to limit continued erosion and instability<br />

at un-naturally high rates and to reduce the potential<br />

for the current erosion from expanding into adjacent,<br />

stable areas. Recommendations are also made for<br />

ongoing revegetation and maintenance works to<br />

enhance the longer term integrity of the diversion as<br />

a whole.<br />

North <strong>Wambo</strong> Creek Diversion – View of Bend 8 with<br />

rip-rap on outside bank and plantings on inside bank<br />

(14th July 2009)<br />

North <strong>Wambo</strong> Creek Diversion - View looking<br />

upstream from the third bend (14th July 2009)<br />

North <strong>Wambo</strong> Creek Diversion – View of Bend 8 with<br />

rip-rap on outside bank and planting on inside bank<br />

(16th February <strong>2012</strong>)<br />

For further information regarding any remedial<br />

recommendations within the NWC Diversion, please<br />

refer to Section 5.1.4.<br />

6 Gilbert & Associates Pty Ltd “Review of North <strong>Wambo</strong> Creek<br />

Diversion (Stage 2)”, April <strong>2012</strong><br />

Page 33