Legend Colliery Holding Boundary Inpit Catchments Dump Catchments Dams Creeks WAMBO COAL WATER STORAGE CATCHMENT AREAS FIGURE 2.4 Prepared by Pegasus Technical CAD FILE: 08672A
<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong> Table 2.4 – WCPL Waste Statistics <strong>Wambo</strong> <strong>Coal</strong> Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 YTD Chemical Anchors 3018 739 1409 1747 3410 10,323 Medical Waste 0 Oily Rags 482 521 454 643 669 597 923 790 832 963 889 7,763 Miscellaneous Chemical disposal 0 Hazardous Disposal 482 3,539 454 1,382 2,078 2,344 923 790 4,242 963 889 0 18,086 General Waste Bulk 40,940 68,520 45,120 40,300 51,460 53,800 28,980 76,820 45,640 43,764 34,340 529,684 General Waste Front Lift 9,885 12,549 8,620 10,560 11,265 13,130 10,040 15,320 11,919 13,640 14,010 130,938 Pallets/Timber Recycling 2,400 2,880 2,420 1,440 9,140 Non-Hazardous Disposal 50,825 81,069 53,740 50,860 62,725 66,930 39,020 94,540 60,439 59,824 49,790 0 669,762 Total Disposal 51,307 84,608 54,194 52,242 64,803 69,274 39,943 95,330 64,681 60,787 50,679 0 687,848 % 28.39% 34.30% 20.82% 16.74% 25.51% 22.73% 20.71% 29.33% 21.53% 24.15% 20.55% #DIV/0! #DIV/0! Contaminated Grease 584 2,158 210 42 37 1,786 32 79 4,928 Empty Oil Drums 881 3,468 2,683 2,197 1,509 986 695 1,134 1,266 1,818 1,185 17,822 Fluorescent Tubes 0 Hydraulic Hose 1,539 2,158 1,445 475 1,175 981 932 2,861 1,948 2,319 1,153 16,986 Oil Filters 1,413 40 1,345 2,798 Oily Water 0 15,610 15,610 Parts Washer 35 0 120 155 0 0 240 550 Hazardous Recycle / Reuse 2,420 7,658 6,286 2,922 2,846 2,159 1,627 5,781 3,214 21,124 2,657 0 58,694 Confidential Documents 93 129 97 86 53 74 103 202 837 Comingled Recycling 2,550 1,910 1,740 2,339 2,182 1,710 1,550 4,496 1,440 1,690 2,130 23,737 Non-Hazardous Recycle / Reuse 2,643 2,039 1,740 2,436 2,268 1,763 1,550 4,570 1,543 1,690 2,332 0 24,574 E-Waste 70,000 114,000 130,500 90,500 97,500 502,500 Effluent 78,500 51,750 72,500 166,250 121,500 119,200 609,700 Recycle cartridges Planet Ark 13 13 Coolant 4,700 4,700 Timber Recycling 4,860 2,240 2,520 2,220 3,320 429 15,589 Scrap Steel 2,680 46,340 77,240 35,860 22,900 51,750 31,540 51,560 43,960 41,480 34,460 439,770 Tyre Recycling 0 Waste Batteries 54 54 Waste Oil 38,300 47,000 40,300 40,200 39,700 57,300 43,500 53,800 44,000 35,000 58,500 497,600 Washbay 5,000 5,500 10,000 12,455 1,100 34,055 Other Recycle / Reuse 124,353 152,384 198,060 254,530 184,100 231,570 149,740 219,360 230,915 168,080 190,889 0 2,103,981 Total Recycle / Reuse 129,416 162,081 206,086 259,888 189,214 235,492 152,917 229,711 235,672 190,894 195,878 0 2,187,249 % 71.61% 65.70% 79.18% 83.26% 74.49% 77.27% 79.29% 70.67% 78.47% 75.85% 79.45% #DIV/0! #DIV/0! Figure 2.5 Water Reticulation Diagram Page 31
- Page 1 and 2: Wambo Coal Pty Limited ANNUAL ENVIR
- Page 3 and 4: Name of Mine: Titles/Mining Lease:
- Page 5 and 6: 2011-2012 AEMR 2.8 Water Management
- Page 7 and 8: 2011-2012 AEMR 3.13.1 Aboriginal He
- Page 9 and 10: 2011-2012 AEMR List of Figures Figu
- Page 11 and 12: 2011-2012 AEMR List of Appendices A
- Page 13 and 14: 2011-2012 AEMR 1.0 Introduction 1.1
- Page 15 and 16: 2011-2012 AEMR Table 1.0 - Annual R
- Page 17 and 18: SUMP SUMP N NEW Muswellbrook LOCALI
- Page 19 and 20: 2011-2012 AEMR Table 1.2 - WCPL Min
- Page 21 and 22: 2011-2012 AEMR 1.3.3 Environmental
- Page 23 and 24: SUMP SUMP 5 UNITED COLLIERY GOLDEN
- Page 25 and 26: 2010-2011 AEMR 1.3.7 Subsidence Man
- Page 27 and 28: 2010-2011 AEMR 1.5 Review of 2011-2
- Page 29 and 30: 2010-2011 AEMR No DP&I Issue DP&I A
- Page 31 and 32: 2011-2012 AEMR Figure 2.2 - Vegetat
- Page 33 and 34: 2011-2012 AEMR Table 2.1 - Producti
- Page 35 and 36: 2011-2012 AEMR The exposed coal is
- Page 37 and 38: 2011-2012 AEMR Figure 2.3 - Coal Ha
- Page 39 and 40: 2011-2012 AEMR January 2009, the wa
- Page 41: 2011-2012 AEMR Table 2.3 - Stored W
- Page 45 and 46: 2011-2012 AEMR reference creeks for
- Page 47 and 48: 2011-2012 AEMR The purpose of the e
- Page 49 and 50: SUMP SUMP N19 SW46 SW45 Hunter Rive
- Page 51 and 52: 2011-2012 AEMR Figure 3.4 - 2010-20
- Page 53 and 54: 2011-2012 AEMR 3.2.1.2 Penalty Infr
- Page 55 and 56: 2011-2012 AEMR 3.2.2.3 PM 10 Four r
- Page 57 and 58: 2011-2012 AEMR Particulate Matter A
- Page 59 and 60: 2011-2012 AEMR Assessment criterion
- Page 61 and 62: 2011-2012 AEMR 3.4 Surface Water 3.
- Page 63 and 64: 2011-2012 AEMR Variations in TSS ob
- Page 65 and 66: 2011-2012 AEMR replacement program
- Page 67 and 68: 2011-2012 AEMR Table 3.2 - Groundwa
- Page 69 and 70: 2011-2012 AEMR Figure 3.13a - Groun
- Page 71 and 72: 2011-2012 AEMR 3.6 Contaminated Lan
- Page 73 and 74: 2011-2012 AEMR prior to undermining
- Page 75 and 76: SUMP SUMP V10-A2 NORTH WAMBO CREEK
- Page 77 and 78: 2011-2012 AEMR 3.8 Weeds 3.8.1 Envi
- Page 79 and 80: 2011-2012 AEMR WCPL’s development
- Page 81 and 82: 2011-2012 AEMR Day L Aeq(15 minute)
- Page 83 and 84: 2011-2012 AEMR Disturbance (L A1,1m
- Page 85 and 86: 2011-2012 AEMR Stakeholders (WACS)
- Page 87 and 88: 2011-2012 AEMR 3.13.2 European Heri
- Page 89 and 90: 2011-2012 AEMR 3.15 Bushfire Manage
- Page 91 and 92: 2011-2012 AEMR non-sensitive enviro
- Page 93 and 94:
2011-2012 AEMR Table 4.1 - WCPL Emp
- Page 95 and 96:
2011-2012 AEMR 4.3 Community Liaiso
- Page 97 and 98:
2011-2012 AEMR 5.0 Rehabilitation T
- Page 99 and 100:
2011-2012 AEMR 5.1.1.1 Rehabilitati
- Page 101 and 102:
2011-2012 AEMR 5.1.3 NWC Diversion
- Page 103 and 104:
2011-2012 AEMR Riparian EFA Riparia
- Page 105 and 106:
Appendix 1 Rail Haulage Records
- Page 107 and 108:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 109 and 110:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 111 and 112:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 113 and 114:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 115 and 116:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 117 and 118:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 119 and 120:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 121 and 122:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 123 and 124:
Appendix 2A Meteorological Data
- Page 125 and 126:
Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 127 and 128:
Appendix 2B Air Monitoring Data
- Page 129 and 130:
Wambo Coal Pty Ltd AEMR 2011-2012 D
- Page 131 and 132:
Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 133 and 134:
Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 135 and 136:
Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 137 and 138:
Wambo Coal Pty Ltd AEMR 2011-2012 D
- Page 139 and 140:
Appendix 2C Surface Water Monitorin
- Page 141 and 142:
Annual Environmental Management Rep
- Page 143 and 144:
Annual Environmental Management Rep
- Page 145 and 146:
Annual Environmental Management Rep
- Page 147 and 148:
Annual Environmental Management Rep
- Page 149 and 150:
Annual Environmental Management Rep
- Page 151 and 152:
Annual Environmental Management Rep
- Page 153 and 154:
Annual Environmental Management Rep
- Page 155 and 156:
Releases to the Hunter River via th
- Page 157 and 158:
Wambo Coal Pty Ltd AEMR 2011‐2012
- Page 159 and 160:
Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 161 and 162:
Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 163 and 164:
Wambo Coal Pty Ltd AEMR 2011-2012 G
- Page 165 and 166:
Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 167 and 168:
Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 169 and 170:
Wambo Coal Pty Ltd AEMR 2011-2012 G
- Page 171 and 172:
Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 173 and 174:
Wambo Coal Pty Ltd AEMR 2011-2012 H
- Page 176 and 177:
WAMBO HOMESTEAD 1 B L A S T V I B R
- Page 178 and 179:
• individual wall panels — 20 H
- Page 180 and 181:
5 Figure 5: Setup for recording in
- Page 182 and 183:
• spectrograms were constructed u
- Page 184 and 185:
APPENDIX A Waveforms and spectrogra
- Page 186:
East - west ground monitor (“tran
- Page 189 and 190:
Channel 1: Channel 2: Channel 3:
- Page 191 and 192:
Appendix 2F Noise Monitoring Result
- Page 193 and 194:
Wambo Coal Mine Annual Report 2011/
- Page 195 and 196:
Table of Contents 1 INTRODUCTION...
- Page 197 and 198:
The survey purpose is to quantify a
- Page 199 and 200:
1.3 Terminology Some definitions of
- Page 201 and 202:
1.5 Wambo Coal Rail Spur Developmen
- Page 203 and 204:
2 METHODOLOGY 2.1 Assessment Method
- Page 205 and 206:
Table 3.2 L A1(1 minute) dB GENERAT
- Page 207 and 208:
Table 3.4 L A1(1 minute) dB GENERAT
- Page 209 and 210:
Table 3.6 L A1(1 minute) dB GENERAT
- Page 211 and 212:
Table 3.8 L A1(1 minute) dB GENERAT
- Page 213 and 214:
Table 3.10L A1(1 minute) dB GENERAT
- Page 215 and 216:
Table 3.12 L A1(1 minute) dB GENERA
- Page 217 and 218:
Table 3.14 L A1(1 minute) dB GENERA
- Page 219 and 220:
Table 3.16 L A1(1 minute) dB GENERA
- Page 221 and 222:
A P P E N D I X A . D EVELOPMENT CO
- Page 223 and 224:
Land Acquisition Criteria 7. If the
- Page 225 and 226:
Table 1: Noise Impact Assessment Cr
- Page 227 and 228:
27 July 2012 Wambo Coal Pty Ltd GPO
- Page 229 and 230:
Appendix 2G Flora & Fauna Monitorin
- Page 231 and 232:
Results The onsite population of A.
- Page 233 and 234:
We trust this report proves useful
- Page 235 and 236:
Document Status Review Format Issue
- Page 237 and 238:
ellied Glider (P. australis) and Sq
- Page 239 and 240:
3.3.4 Spotlighting 26 3.3.5 Herpeto
- Page 241:
1 Introduction RPS Australia East (
- Page 244 and 245:
2 Flora 2.1 Methods In 2011, a tota
- Page 246 and 247:
WARNING No part of this plan should
- Page 248 and 249:
similar to the results obtained in
- Page 250 and 251:
Figure 2-3: Percentage of Native Di
- Page 252 and 253:
2.3 Discussion 2.3.1 Species Divers
- Page 254 and 255:
» Due to the low density of Scarle
- Page 256 and 257:
WARNING No part of this plan should
- Page 258 and 259:
3.1.6 Bat Surveys Nocturnal bat sur
- Page 260 and 261:
WARNING No part of this plan should
- Page 262 and 263:
Figure 3-3: Number of Sites per Spe
- Page 264 and 265:
An additional species, namely the W
- Page 266 and 267:
3.3.3 Owl Call Playback No threaten
- Page 268 and 269:
3.4 Conclusion While no Swift Parro
- Page 270 and 271:
• Ground cover characteristics;
- Page 273 and 274:
4.2.1 South Wambo Creek South Wambo
- Page 275 and 276:
Sections Stoney Creek sections scor
- Page 277 and 278:
5 References Braun-Blanquet, J. (19
- Page 279 and 280:
Appendix A Flora Diversity Results
- Page 281 and 282:
Table 2: Number of Flora Species Re
- Page 283 and 284:
Table 4: Percentage Change in Intro
- Page 285 and 286:
Plot: V1-A1 Flora Species Braun Bla
- Page 287 and 288:
Plot: V1-B1 Flora Species Braun Bla
- Page 289 and 290:
Plot: V1-B3 Flora Species Braun Bla
- Page 291 and 292:
Plot: V2-B1 Flora Species Braun Bla
- Page 293 and 294:
Plot: V3-B1 Flora Species Braun Bla
- Page 295 and 296:
Plot: V5-B2 Flora Species Braun Bla
- Page 297 and 298:
Plot: V5-B4 Flora Species Braun Bla
- Page 299 and 300:
Plot: V6-A3 Flora Species Braun Bla
- Page 301 and 302:
Plot: V6-B1c Flora Species Braun Bl
- Page 303 and 304:
Plot: V6-B2c Flora Species Braun Bl
- Page 305 and 306:
Plot: V6-B4 Flora Species Braun Bla
- Page 307 and 308:
Plot: V9-B1 Flora Species Braun Bla
- Page 309 and 310:
Plot: V1--A1 Flora Species Braun Bl
- Page 311 and 312:
Plot: V1--B1 Flora Species Braun Bl
- Page 313 and 314:
Plot: V11-B1 Flora Species Braun Bl
- Page 315 and 316:
Plot: V13-B1 Flora Species Braun Bl
- Page 317 and 318:
Plot: V14-A1 Flora Species Braun Bl
- Page 319 and 320:
Plot: V14-B2 Flora Species Braun Bl
- Page 321 and 322:
Table 1: Introduced Species Frequen
- Page 323 and 324:
Appendix D Fauna Species List 2011
- Page 325 and 326:
Family Scientific Name Common Name
- Page 327 and 328:
Family Scientific Name Common Name
- Page 329 and 330:
Appendix E Riparian Condition Asses
- Page 331 and 332:
Understorey (shrub layer) (Score) C
- Page 333 and 334:
Surface Stability (Score) Comments
- Page 335 and 336:
Appendix F Riparian Condition Score
- Page 337 and 338:
Overstorey Understorey Ground Cover
- Page 339 and 340:
Overstorey Understorey Ground Cover
- Page 341 and 342:
Table 5-4: 2011 Stoney Creek Ripari
- Page 343 and 344:
Transect Left Bank 1 Upstream 2 Rig
- Page 345 and 346:
Transect Left Bank 1 Upstream 2 Rig
- Page 347 and 348:
Table 5-6: 2011 North Wambo Riparia
- Page 349 and 350:
Transect Left Bank 1 Upstream 2 Rig
- Page 351 and 352:
Transect Left Bank 1 Upstream 2 Rig
- Page 353 and 354:
Transect Left Bank 1 Upstream 2 Rig
- Page 355 and 356:
Appendix H Staff Qualifications 201
- Page 357 and 358:
Curriculum Vitae - CONTINUED - proj
- Page 359 and 360:
Curriculum Vitae ROB SANSOM Botanis
- Page 361 and 362:
Curriculum Vitae ANDREW SMITH Field
- Page 363 and 364:
Appendix 3 Summary of Environmental
- Page 365 and 366:
Wambo Coal Pty Limited AEMR 2011-20
- Page 367 and 368:
Wambo Coal Pty Limited AEMR 2011-20
- Page 369 and 370:
Wambo Coal Pty Ltd AEMR 2011-2012 N
- Page 371 and 372:
Wambo Coal Pty Ltd AEMR 2011-2012 1
- Page 373 and 374:
Wambo Coal Pty Ltd AEMR 2011-2012 3
- Page 375 and 376:
Number Date (d/m/yr) Complainant ID
- Page 377 and 378:
Wambo Coal Pty Ltd AEMR 2011-2012 7
- Page 379 and 380:
Appendix 5 Rehabilitation Plan