01.11.2014 Views

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />

January 2009, the waste from the Open Cut<br />

workshop is now managed as part of the TWMS.<br />

<br />

<br />

Underground portal area, and<br />

Open Cut workshop and wash down area.<br />

The TWMS was reviewed during the reporting<br />

period and a revised contract with the preferred<br />

licensed waste contractor commenced in December<br />

<strong>2011</strong>.<br />

2.6.1 Sewage Treatment and<br />

Disposal<br />

Sewage from the various areas of mining operation<br />

is treated in four onsite treatment systems as<br />

follows:<br />

<br />

<br />

<br />

<br />

CHPP Bathhouse – septic tank system which<br />

feeds to a transpiration area;<br />

CHPP Control Room – biocycle system;<br />

Administration Buildings – effluent system<br />

pumps to a transpiration dam located to the<br />

west of the complex; and<br />

North <strong>Wambo</strong> Underground Portal – effluent<br />

collection tank.<br />

The Wollemi Bathhouse and Facilities are no longer<br />

in use. The effluent treatment system is not<br />

operational and these facilities have now been<br />

decommissioned.<br />

Effluent treatment systems are inspected and<br />

maintained on a periodic basis to ensure effective<br />

operation. All effluent collected from the<br />

Underground portal is disposed of by a licensed<br />

contractor and records are maintained on site.<br />

2.6.2 Rubbish Disposal<br />

Bulk garbage bins for each waste stream are<br />

located around site. These bins are collected and<br />

managed on a regular basis by a licensed waste<br />

contractor. For details of waste disposed and<br />

recycled during the reporting period please refer to<br />

Table 2.4.<br />

2.6.3 Oily Waste Disposal<br />

Waste oils from the site are collected, stored and<br />

are removed by a licensed waste contractor on a<br />

periodic basis for reprocessing and reuse. For<br />

details of waste oil disposal during the reporting<br />

period please refer to Table 2.4.<br />

A mix of passive and active oily water separator<br />

systems for the separation of hydrocarbons from<br />

oily water runoff, are located across the site<br />

including:<br />

the rail load out,<br />

Licensed waste contractors remove collected waste<br />

oil from the separators on a regular basis. Routine<br />

inspections are carried out on all systems to ensure<br />

that there are no blockages or overflows. Records of<br />

all waste disposals are kept on site.<br />

2.7 ROM and Product <strong>Coal</strong><br />

Stockpiles<br />

A 70,000 tonne ROM coal stockpile for underground<br />

coal is located near the Underground portal level,<br />

just east of the Underground entrance.<br />

Underground coal is conveyed to the Underground<br />

ROM stockpile from the portal entrance by<br />

Conveyor CV01.<br />

<strong>Coal</strong> is transported from the Open Cut and<br />

Underground ROM Stockpile via truck and either<br />

tipped directly into the 400 tonne ROM hopper or<br />

stockpiled adjacent to the ROM bin. The ROM<br />

stockpile area is approximately 200m x 200m with a<br />

ROM coal storage capacity of approximately<br />

250,000 tonnes.<br />

The capacity of WCPL clean coal stockpile is<br />

approximately 500,000 tonnes.<br />

2.8 Water Management<br />

The water management system at WCPL comprises<br />

clean water (imported water from the Hunter River<br />

or Wollombi Brook), mine water (collected run-off<br />

from disturbed catchments or recycled water from<br />

the CHPP) and fresh water (either imported from the<br />

town supply or collected rainwater). The water<br />

management system is illustrated in Figures 2.4<br />

and 2.5 and major storages are presented in Table<br />

2.3.<br />

A network of storages and drains has been<br />

established to capture runoff from mine water<br />

catchment areas. Runoff from areas disturbed by<br />

mining (including the CHPP and associated<br />

industrial areas) is collected in Open Cut voids and<br />

other mine water storages. These storages are<br />

used as priority water sources for the CHPP and<br />

dust suppression. Runoff from haul roads is treated<br />

in sediment dams or diverted to mine water<br />

storages.<br />

CHPP tailings are discharged to the Hunter Pit<br />

tailings dam. Water that is liberated from the settled<br />

tailings filters through spoil at the southern end of<br />

the dam and reports to the North Homestead Pit.<br />

Water is reticulated from this pit back to the CHPP.<br />

Page 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!