<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />
January 2009, the waste from the Open Cut<br />
workshop is now managed as part of the TWMS.<br />
<br />
<br />
Underground portal area, and<br />
Open Cut workshop and wash down area.<br />
The TWMS was reviewed during the reporting<br />
period and a revised contract with the preferred<br />
licensed waste contractor commenced in December<br />
<strong>2011</strong>.<br />
2.6.1 Sewage Treatment and<br />
Disposal<br />
Sewage from the various areas of mining operation<br />
is treated in four onsite treatment systems as<br />
follows:<br />
<br />
<br />
<br />
<br />
CHPP Bathhouse – septic tank system which<br />
feeds to a transpiration area;<br />
CHPP Control Room – biocycle system;<br />
Administration Buildings – effluent system<br />
pumps to a transpiration dam located to the<br />
west of the complex; and<br />
North <strong>Wambo</strong> Underground Portal – effluent<br />
collection tank.<br />
The Wollemi Bathhouse and Facilities are no longer<br />
in use. The effluent treatment system is not<br />
operational and these facilities have now been<br />
decommissioned.<br />
Effluent treatment systems are inspected and<br />
maintained on a periodic basis to ensure effective<br />
operation. All effluent collected from the<br />
Underground portal is disposed of by a licensed<br />
contractor and records are maintained on site.<br />
2.6.2 Rubbish Disposal<br />
Bulk garbage bins for each waste stream are<br />
located around site. These bins are collected and<br />
managed on a regular basis by a licensed waste<br />
contractor. For details of waste disposed and<br />
recycled during the reporting period please refer to<br />
Table 2.4.<br />
2.6.3 Oily Waste Disposal<br />
Waste oils from the site are collected, stored and<br />
are removed by a licensed waste contractor on a<br />
periodic basis for reprocessing and reuse. For<br />
details of waste oil disposal during the reporting<br />
period please refer to Table 2.4.<br />
A mix of passive and active oily water separator<br />
systems for the separation of hydrocarbons from<br />
oily water runoff, are located across the site<br />
including:<br />
the rail load out,<br />
Licensed waste contractors remove collected waste<br />
oil from the separators on a regular basis. Routine<br />
inspections are carried out on all systems to ensure<br />
that there are no blockages or overflows. Records of<br />
all waste disposals are kept on site.<br />
2.7 ROM and Product <strong>Coal</strong><br />
Stockpiles<br />
A 70,000 tonne ROM coal stockpile for underground<br />
coal is located near the Underground portal level,<br />
just east of the Underground entrance.<br />
Underground coal is conveyed to the Underground<br />
ROM stockpile from the portal entrance by<br />
Conveyor CV01.<br />
<strong>Coal</strong> is transported from the Open Cut and<br />
Underground ROM Stockpile via truck and either<br />
tipped directly into the 400 tonne ROM hopper or<br />
stockpiled adjacent to the ROM bin. The ROM<br />
stockpile area is approximately 200m x 200m with a<br />
ROM coal storage capacity of approximately<br />
250,000 tonnes.<br />
The capacity of WCPL clean coal stockpile is<br />
approximately 500,000 tonnes.<br />
2.8 Water Management<br />
The water management system at WCPL comprises<br />
clean water (imported water from the Hunter River<br />
or Wollombi Brook), mine water (collected run-off<br />
from disturbed catchments or recycled water from<br />
the CHPP) and fresh water (either imported from the<br />
town supply or collected rainwater). The water<br />
management system is illustrated in Figures 2.4<br />
and 2.5 and major storages are presented in Table<br />
2.3.<br />
A network of storages and drains has been<br />
established to capture runoff from mine water<br />
catchment areas. Runoff from areas disturbed by<br />
mining (including the CHPP and associated<br />
industrial areas) is collected in Open Cut voids and<br />
other mine water storages. These storages are<br />
used as priority water sources for the CHPP and<br />
dust suppression. Runoff from haul roads is treated<br />
in sediment dams or diverted to mine water<br />
storages.<br />
CHPP tailings are discharged to the Hunter Pit<br />
tailings dam. Water that is liberated from the settled<br />
tailings filters through spoil at the southern end of<br />
the dam and reports to the North Homestead Pit.<br />
Water is reticulated from this pit back to the CHPP.<br />
Page 27