Wambo Coal AEMR 2011-2012 - Peabody Energy
Wambo Coal AEMR 2011-2012 - Peabody Energy Wambo Coal AEMR 2011-2012 - Peabody Energy
SUMP SUMP UNITED COLLIERY GOLDEN HIGHWAY WOMBAT DUMP MONTROSE PIT WAMBO OPEN CUT HUNTER PIT TAILINGS DAM SOUTH BATES PIT NORTH WAMBO CREEK DIVERSION WOLLEMI BOXCUT STAGE 3 CREEK DIVERSION NORTH WAMBO UNDERGROUND HOMESTEAD PIT WAMBO ADMIN WAMBO CHPP NORTH WAMBO BROOK CREEK WOLLOMBI STONY CREEK SOUTH WAMBO CREEK Legend Colliery Holding Boundary DA Approved Open Cut Limits MOP Open Cut Limits Wambo Owned Land North Wambo Underground Workings (Existing) North Wambo Underground Workings (Proposed) Open Cut Mining at 30th June 2012 Dams Creeks Prepared by Pegasus Technical CAD FILE: 08671A WAMBO COAL EXTENT OF MINING OPERATIONS FIGURE 2.2
2011-2012 AEMR Figure 2.3 – Coal Handling and Preparation Plant Process Page 25
- Page 1 and 2: Wambo Coal Pty Limited ANNUAL ENVIR
- Page 3 and 4: Name of Mine: Titles/Mining Lease:
- Page 5 and 6: 2011-2012 AEMR 2.8 Water Management
- Page 7 and 8: 2011-2012 AEMR 3.13.1 Aboriginal He
- Page 9 and 10: 2011-2012 AEMR List of Figures Figu
- Page 11 and 12: 2011-2012 AEMR List of Appendices A
- Page 13 and 14: 2011-2012 AEMR 1.0 Introduction 1.1
- Page 15 and 16: 2011-2012 AEMR Table 1.0 - Annual R
- Page 17 and 18: SUMP SUMP N NEW Muswellbrook LOCALI
- Page 19 and 20: 2011-2012 AEMR Table 1.2 - WCPL Min
- Page 21 and 22: 2011-2012 AEMR 1.3.3 Environmental
- Page 23 and 24: SUMP SUMP 5 UNITED COLLIERY GOLDEN
- Page 25 and 26: 2010-2011 AEMR 1.3.7 Subsidence Man
- Page 27 and 28: 2010-2011 AEMR 1.5 Review of 2011-2
- Page 29 and 30: 2010-2011 AEMR No DP&I Issue DP&I A
- Page 31 and 32: 2011-2012 AEMR Figure 2.2 - Vegetat
- Page 33 and 34: 2011-2012 AEMR Table 2.1 - Producti
- Page 35: 2011-2012 AEMR The exposed coal is
- Page 39 and 40: 2011-2012 AEMR January 2009, the wa
- Page 41 and 42: 2011-2012 AEMR Table 2.3 - Stored W
- Page 43 and 44: 2011-2012 AEMR Table 2.4 - WCPL Was
- Page 45 and 46: 2011-2012 AEMR reference creeks for
- Page 47 and 48: 2011-2012 AEMR The purpose of the e
- Page 49 and 50: SUMP SUMP N19 SW46 SW45 Hunter Rive
- Page 51 and 52: 2011-2012 AEMR Figure 3.4 - 2010-20
- Page 53 and 54: 2011-2012 AEMR 3.2.1.2 Penalty Infr
- Page 55 and 56: 2011-2012 AEMR 3.2.2.3 PM 10 Four r
- Page 57 and 58: 2011-2012 AEMR Particulate Matter A
- Page 59 and 60: 2011-2012 AEMR Assessment criterion
- Page 61 and 62: 2011-2012 AEMR 3.4 Surface Water 3.
- Page 63 and 64: 2011-2012 AEMR Variations in TSS ob
- Page 65 and 66: 2011-2012 AEMR replacement program
- Page 67 and 68: 2011-2012 AEMR Table 3.2 - Groundwa
- Page 69 and 70: 2011-2012 AEMR Figure 3.13a - Groun
- Page 71 and 72: 2011-2012 AEMR 3.6 Contaminated Lan
- Page 73 and 74: 2011-2012 AEMR prior to undermining
- Page 75 and 76: SUMP SUMP V10-A2 NORTH WAMBO CREEK
- Page 77 and 78: 2011-2012 AEMR 3.8 Weeds 3.8.1 Envi
- Page 79 and 80: 2011-2012 AEMR WCPL’s development
- Page 81 and 82: 2011-2012 AEMR Day L Aeq(15 minute)
- Page 83 and 84: 2011-2012 AEMR Disturbance (L A1,1m
- Page 85 and 86: 2011-2012 AEMR Stakeholders (WACS)
<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />
Figure 2.3 – <strong>Coal</strong> Handling and Preparation Plant Process<br />
Page 25